Be ready for an equipment audit
How to show the full history of any asset, from PMs and inspections to statutory certificates, without digging through paper.
Keep everything against the asset
Every PM, inspection, work order, calibration and certificate is attached to the asset record as it happens. There is no separate filing step.
Track statutory items with due dates
Lifting equipment, pressure systems, refrigeration and calibrated instruments each have their own schedule and certificate. The agent warns before they fall due and escalates if they are missed.
Show the history on request
Open the asset and you can show the auditor the full timeline: what was planned, what was done, the evidence and the approvals, with dates.
Ask Ella for the gaps
Before an audit, ask Ella which assets have overdue statutory inspections or missing certificates, and clear them in advance.