Induct at the gate, issue permits and score performance
What happens after approval: site induction verified at the gate, permits linked to the job, and a scorecard you can act on.
Induct once, verify every visit
Site-specific induction is done once per person and recorded. At the gate, their status is checked from a phone, so it is not repeated or skipped.
Issue permits against the job
Permits to work are linked to the contractor, the job and the induction. A permit is not issued for someone who is not approved and inducted.
Audit on site
Contractor audits are scheduled and recorded from a phone. Failed items become corrective actions for your approval, using the same loop as KnowSafe.
Read the scorecard
Audits, incidents, document compliance and delivery roll into one scorecard per contractor. Use it when deciding who to invite back.
Find out who is on site with expired paperwork.
Bring your current contractor list. We will show how the agent collects, checks and chases, and what it would flag today.
More guides in Prequalification & Site Access
More resources