Equipment Loan Record

The recurring failure isn't the loan itself, it's the borrowed asset that turns up with no history attached to it. A lifting beam, a generator or a MEWP crosses from another site, a contractor or a supplier, and unless somebody actively asks for the examination certificate, it starts working on your site with an inspection status nobody has actually checked.

KnowOpsRecordOPS-025Pinned in navigation43 fields across 5 sectionsFull researchSee the form

Reviewed by Siddarth SinghCSPLast reviewed 16 August 2026

Basis
ISO 55001 cl.8.1
Workspace
KnowOps
Form type
Record
Raised
At the loan, not reconstructed once equipment has already moved
Completed by
The asset owner, with an engineering manager countersignature on close-out

The short version

  • An equipment loan record exists because a loan is a change of custody without a change of ownership — the asset stays on your register, but somebody else has physical control of it for a defined period.
  • It's a singleton per loan event: one record per Loan ID, opened at the point equipment moves, covering condition and certification before it leaves, status while it's away, and condition on return.
  • The template runs 43 fields across five sections — Header, Before it moves, While on loan, Related records, Outcome — and scores on loans returned on time, where high is good.
  • It links forward into Contractor Equipment Verification when the counterparty is a contractor, and back into the Asset Register for any item that carries an Asset ID.

What this is

What is an equipment loan record?

What is an equipment loan record?

An equipment loan record is the KnowOps record used when equipment is lent to, or borrowed from, another site, a contractor or a supplier, with agreed terms and condition. It's built against ISO 55001 cl.8.1 and sits inside the Asset and Equipment Control programme.

When is an equipment loan record raised?

It's raised at the point the loan happens, not written up afterwards from memory. The asset owner opens the record before the item leaves, or as it arrives if it's inbound, and owns it through to return.

What does 'Direction' capture on this record?

Direction states whether the equipment is going out to a counterparty (Lending out) or coming in from one (Borrowing in). It isn't scored — it's a routing fact that determines whose condition checks, insurance position and return obligations apply, not a measure of good or bad practice.

Scope

When is an equipment loan record required?

This record covers a single loan, in either direction, between your site and a named counterparty. It isn't the place to record an internal transfer, a stores issue to a person, or who holds a key.

Use this template when

  • Equipment is being sent out to, or received in from, another site, a contractor or a supplier under agreed terms
  • A loan is about to leave and needs its condition, certification and insurance position confirmed before it goes
  • An item already on loan needs its location, maintenance responsibility or return date tracked while it's away
  • A loan has come back and needs its returned condition checked against what left, with any damage or loss captured
  • A linked record needs this one to exist: Contractor Equipment Verification for a contractor counterparty, or the Asset Register for a registered item

Do not use it for

  • Asset Movement and Transfer, which records an asset moving between areas, sites or owners, with condition at both ends — a change of custody within the organisation, not a loan to an outside party.
  • Tool Crib Issue and Return, which issues a tool or instrument to a named person for a shift or task — a stores transaction, not a cross-organisation loan.
  • Key and Access Device Register, which holds every key, fob and access device, who has it and what it opens — access control, not equipment control.
  • Temporary Equipment Approval, which approves bringing in a piece of equipment temporarily rather than tracking the loan of an existing asset.
  • Anything outside KnowOps, which belongs in the workspace that owns that process

Compliance mapping

Which ISO 55001 cl.8.1 requirements does this satisfy?

ISO 55001 cl.8.1 covers operational planning and control: the processes needed to meet asset management objectives, including control over an asset temporarily outside the organisation's direct custody. Applied to a loan, that means condition, certification and competence have to be confirmed at the point custody changes, not assumed to travel with the asset.

ClauseRequirementWhere it lands
ISO 55001 cl.8.1Operational control extends to assets while they are on loan, whether outbound to a counterparty or inbound from one, not only while physically on site.Header
ISO 55001 cl.7.5Documented information — inspection certificates and condition photographs — must be produced or obtained before a loan proceeds, as evidence of the asset's state at handover.Before it moves
ISO 55001 cl.7.2Competence of the people who will operate or maintain the equipment must be established before custody transfers.Before it moves
ISO 55001 cl.8.1Statutory examination status must be current at the point the equipment leaves the organisation's control, not merely at its last scheduled check.Before it moves
ISO 55001 cl.9.1Location, maintenance responsibility and inspection due dates must be monitored for the duration of the loan, not only checked at issue and return.While on loan
ISO 55001 cl.10.2Damage or loss discovered on return is a nonconformity requiring a corrective action reference, not a closing remark.Outcome
ISO 55001 cl.6.1Risks specific to loaned or borrowed equipment — uninsured loss, an expired certificate travelling unnoticed — are identified before the loan starts, not discovered afterwards.Header

What it does not cover

  • Inspection Certificates Provided Or Obtained, which is left blank because the counterparty didn't supply one and nobody chased it before the equipment moved.
  • Statutory Examination In Date, which lapses partway through the loan with no re-check scheduled before Due Back.
  • Written Agreement In Place, which is marked No while Status still moves to In progress.
  • Damage Reporting Route Agreed, which is skipped because both sides assumed the other would raise it if something went wrong.
  • Action Required, which is marked Yes with no CAPA ID entered against it.

Global

Equipment Loan Record requirements by country

ISO 55001 is jurisdiction-neutral, but a loan between two organisations creates a legal relationship over the equipment itself, and that relationship is read differently depending on where the loan sits.

United Kingdom

Common law of bailment

The legal relationship created whenever possession of goods passes without a transfer of ownership

A UK bailee owes a duty of reasonable care proportionate to the loan — gratuitous or for reward — and Written Agreement In Place is the record's way of pinning down what 'reasonable care' was actually agreed to mean before a dispute over damage or loss forces the question.

United States

State bailment law and UCC Article 2A on leases of goods

Bailment principles apply by default; Article 2A governs where the arrangement is structured as a lease

Whether a US loan is treated as a simple bailment or a lease under Article 2A changes who bears risk of loss in transit, which is exactly what Value and Written Agreement In Place are trying to fix before the equipment leaves.

International

ISO 55001 cl.8.1 — asset management systems

Certification-scheme expectation for control of assets outside direct custody

An asset management system certified to ISO 55001 is expected to demonstrate control over loaned and borrowed equipment specifically, not just owned equipment in normal use, which is what this record exists to evidence at audit.

How to complete it

How to complete an equipment loan record, step by step

The fields are mostly Yes/No, but four judgement calls decide whether this record is a real control on a loan or a form filed for the sake of it.

Does Direction actually change what gets checked?

Direction states Lending out or Borrowing in, but nothing in the form forces different fields to be completed depending on which way the equipment is moving. Whether the reviewer treats a borrowed item's certification as your responsibility to verify, or waves it through because it isn't 'yours', is a judgement the record doesn't make for them.

Does inspection history actually travel with borrowed equipment?

Inspection Certificates Provided Or Obtained can be marked Yes on the strength of a verbal assurance rather than a document in hand. Whether the certificate itself was seen, or just promised, is the difference between this record meaning something and it meaning nothing — and it's exactly the gap the record's own warning about borrowed history is describing.

Is Due Back a control point or a formality?

Due Back exists to be checked against Returned, but nothing stops a loan running past its due date with no escalation until somebody happens to notice. Whether an overdue loan is actively chased or quietly rolled forward is a matter of who's watching, not what the field records.

Does Damage Or Loss actually reach a CAPA, or stop at a tick?

Damage Or Loss feeds Action Required, but Action Required being Yes doesn't guarantee a CAPA ID gets raised against it. Whether damage discovered on return closes with an actual corrective action, or just sits as a Yes with nothing behind it, decides whether the loan's outcome data can be trusted.

What auditors find

Most common equipment loan record findings

The recurring gaps sit less in the fields themselves than in what happens once a loan is already in progress and attention has moved on.

FindingClauseWhat fixes it
Direction recorded but no difference in which condition checks get chased for a borrowed item versus a loaned-out one.ISO 55001 cl.8.1Route Before It Moves fields differently by Direction, so a Borrowing In record prompts for the certificate to be obtained rather than produced.
Inspection Certificates Provided Or Obtained marked Yes with no document actually attached to the record.ISO 55001 cl.7.5Require a file attachment or reference number wherever this field is Yes, rather than accepting a bare tick.
Due Back passes with Returned still blank and no escalation raised.ISO 55001 cl.9.1Flag any record where Due Back has passed and Returned is empty, and route it to Our Owner automatically rather than waiting for the next manual review.
Damage Or Loss marked Yes with Action Required left at No.ISO 55001 cl.10.2Force Action Required to Yes whenever Damage Or Loss is Yes, closing the gap between the two fields being answered independently.
Written Agreement In Place marked No on high-Value loans with Status still allowed to progress.ISO 55001 cl.8.1Block Status from moving past Planned when Written Agreement In Place is No and Value exceeds a defined threshold.
Contractor Verification ID left blank on loans to a contractor counterparty.ISO 55001 cl.7.2Make Contractor Verification ID required whenever Counterparty matches a contractor record, linking competence evidence to the specific loan rather than assuming it exists elsewhere.

Case in point

Case in point: the lifting beam that arrived without its paperwork

A site borrowed a lifting beam from a neighbouring site to cover a shutdown, and the loan record was raised the same afternoon: Direction set to Borrowing In, Counterparty and Out Date entered, Due Back set for the following week. Inspection Certificates Provided Or Obtained was marked Yes because the beam had clearly been used before and somebody assumed the paperwork would follow with it.

It didn't. The beam went straight into a lift, and it was three days into the loan — with the beam already used on two further lifts — before anyone asked to actually see the examination certificate, at which point it turned out to have lapsed six weeks earlier at the lending site. Under this template, Statutory Examination In Date exists precisely to stop equipment moving on the strength of an assumption; the failure wasn't the missing certificate, it was the three days nobody asked for it before the beam went to work.

The template

The template, field by field

The form exactly as it installs. Every field, option, score and conditional rule is editable, and the links to other templates come with it.

43fields
5 sections
Reference
OPS-025
Archetype
Record
Record ID
LOAN-2026-000
Scoring
Loans returned on time
Direction
High is good
Singleton
Yes
Basis
ISO 55001 cl.8.1
Links
Links Asset Register and Contractor Equipment Verification
Tags
Asset, Loan
Sections
5
Fields
43
Follow up fields
3
Repeating sections
0
Links out
5
Field typesOwn ID, generated on saveCase thread and parentPick list from a registryLinked to another templateFollow up, dashed outlineScored

Header

16 fields
Text

Loan ID*

Generated on save

Auto sequence. Format LOAN-2026-000.

The record's own ID. Other templates point at this value.

Single Choice

Status*

Scored

Drives who this goes to next.

  • Planned2 pts
  • In progress2 pts
  • Complete3 pts
  • Deferred0 pts
  • Open0 pts
  • Closed3 pts
  • Overdue0 pts
Date & Time

Date and Time*

Users

Completed By*

Pick List

Site*

From FDN-001 Site NameFilter: Status is Active
Text

Site ID*

Linked

Format SITE-000.

Links to FDN-001 Site ID

Single Choice

Direction*

Lending out or borrowing in.

Lending outBorrowing in
Text

Equipment Description*

Text

Asset ID

OptionalLinked

Links to FDN-002 Asset ID

Text

Counterparty*

Date & Time

Out Date*

Date & Time

Due Back*

Users

Our Owner*

Numeric Answer

Value

Optional
Single Choice

Written Agreement In Place*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Info

Borrowed Equipment Arrives Without Its History

A lifting beam borrowed from another site turns up without its examination certificate, and nobody asks until somebody is standing under it.

Before it moves

6 fields
Single Choice

Condition Recorded And Photographed*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Inspection Certificates Provided Or Obtained*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Statutory Examination In Date*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Operating Instructions Included*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Insurance Position Confirmed*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Competent Users Identified*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator

While on loan

6 fields
Single Choice

Location Known*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Maintenance Responsibility Agreed*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Inspection During The Loan Where Due*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Damage Reporting Route Agreed*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Return Date Tracked*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Extension Agreed In Writing Where Needed*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator

Related records

1 field
Text

Transfer ID

OptionalLinked

Where the loan involved a registered asset.

Links to OPS-023 Transfer ID

Outcome

14 fields
Single Choice

Returned On Time*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Date & Time

Returned

Optional
Single Choice

Returned In The Same Condition*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Damage Or Loss*

Scored
  • Yes0 pts
  • No2 pts
  • N/Aexcluded from denominator
Text

Case ID

OptionalThread key

Thread key

Text

Contractor Verification ID

OptionalLinked

Links to CON-027 Verification ID

Single Choice

Action Required*

Scored

Raise the action record, then enter its reference here.

  • No2 pts
  • Yes0 pts
Single Choice

Priority

OptionalScoredShows if Action Required equals Yes
  • High0 pts
  • Medium1 pt
  • Low3 pts
Text

CAPA ID

OptionalLinkedShows if Action Required equals Yes

Format CAPA-2026-00000.

Links to FDN-014 CAPA ID

Users

Action Owner

OptionalShows if Action Required equals Yes
Users

Asset Owner*

Signature

Signature*

Users

Engineering Manager*

Signature

Second Signature*

OPS-025 · record IDs look like LOAN-2026-000 · Links Asset Register and Contractor Equipment Verification

Open in Knowella

Run it with agents

From a document you fill in to a programme that runs itself

The record is easy to open at the point a loan starts; the discipline that actually matters is whether the certificate that should travel with the equipment is chased down before it leaves, not after something goes wrong.

KnowOps

Holds the loan record against the Asset Register, tracks Due Back dates across every active loan, and keeps the evidence trail — certificates, agreement, condition — together in one place.

KnowContractor

Surfaces the Contractor Verification ID whenever a counterparty is a contractor, so competence and insurance evidence for who's holding the equipment is checked before it goes.

KnowMaintain

Watches Statutory Examination In Date and maintenance responsibility for the length of the loan, so an inspection due while equipment is away doesn't quietly slip.

Ella
Ella

Coordinates loans across sites and counterparties, rolls overdue returns and open damage cases into one view, and holds every write for your approval before it touches a record.

This template lives in KnowOps — frontline execution. Shift handover, production control, daily management, worker lifecycle and improvement.

Meet KnowOps→

Glossary

Equipment Loan Record definitions and key terms

Bailment
The legal relationship created when possession of an item passes from one party to another without a change of ownership, carrying a duty of care proportionate to the arrangement.
Statutory examination
A formal, periodic inspection of certain equipment — lifting gear and pressure equipment among them — required by law and recorded as a certificate with an expiry date.
Direction
The routing field on this record stating whether equipment is Lending out to a counterparty or Borrowing in from one; unscored, because it states a fact rather than measuring performance.
CAPA
Corrective and Preventive Action — the reference raised against a nonconformity, such as damage or loss discovered on a loan's return, to track it through to close-out.
Asset owner
The named individual accountable for an asset's condition and history, and the completing party for this record regardless of which direction the equipment is moving.

FAQ

Frequently asked questions about equipment loan record

What is the Equipment Loan Record template based on?+

It's built against ISO 55001 cl.8.1, operational planning and control, which requires the processes needed to meet asset management objectives to be planned and controlled — including assets temporarily outside the organisation's direct custody. ISO 55001 is the international standard for getting value from physical assets across their whole life.

What sections does the template contain?+

Five sections: Header, Before it moves, While on loan, Related records and Outcome. Together they hold 43 fields, 33 of which are required, covering the loan from the point it's agreed to the point it's returned and closed.

Who completes an equipment loan record?+

The asset owner, throughout — from the condition and certification checks before the item moves, through tracking while it's away, to confirming its condition on return. An engineering manager provides a second signature at close-out.

Does it matter which direction the equipment is moving?+

Yes. Direction states Lending out or Borrowing in, and while the field itself isn't scored, it decides whose certification, insurance and return obligations the rest of the record is actually chasing.

How is an equipment loan record scored?+

Scoring is loans returned on time, where high is good. The scored fields cluster around condition and certification before the loan, active tracking while it's away, and condition and any damage or loss on return.

Can the template be changed?+

Yes. Every field, option, score and conditional rule is editable, and the links to the Asset Register and Contractor Equipment Verification carry over. Most teams install it as it is, run it for a cycle, then tighten which fields block progress.

Keep going

Related templates and programmes

Siddarth Singh

Written and reviewed by

Siddarth Singh

Founder & Chief Executive Officer, Knowella

Certified Safety Professional and industrial and systems engineer with more than a decade inside food supply chain, freight and manufacturing operations. This page was written against the current text of the standards it cites, not against secondary summaries of them.

  • Certified Safety Professional (CSP), Board of Certified Safety Professionals
  • MBA, University of Chicago Booth School of Business
  • MS and BS, The Ohio State University, Industrial and Systems Engineering
  • Six Sigma Black Belt
Verify with BCSP →

Sources and last review. Reviewed 16 August 2026 against:

  • ISO 55001:2014 cl.8.1 — Operational planning and control
  • ISO 55001:2014 cl.10.2 — Nonconformity and corrective action
  • ISO 55001:2014 — Asset management systems
  • LOLER 1998 Regulation 9 — Thorough examination and inspection

This page is general guidance, not legal advice. Confirm requirements with your jurisdiction’s regulator.