A pre-task assessment exists to catch what the written assessment could not know: that it rained overnight, that the usual access is blocked, that the crew is one short, that the adjacent line is running when it normally is not. If it asks the crew to re-derive the hazards from scratch, it becomes a form they complete without reading.

KnowSafeAssessmentSAF-059Pinned in navigationFull guide
Asks
What is different today?
Fails as
A duplicate of the written assessment

Summary

In short

  • The value is in the differences, not the hazards. A pre-task form that re-lists the same hazards as the written assessment gets completed without thought within a fortnight.
  • It must be performed by the crew doing the work, at the location, immediately before starting. Completed in an office or at the start of the week, it is documentation rather than assessment.
  • The output has to include the option to stop. A form whose only outcome is proceed is a record of intent, not a decision.
  • Conditions that most often change: weather, ground condition, adjacent work, access and egress, crew composition, equipment availability and time pressure.
  • Where the same difference appears repeatedly, it is not a daily variation. It is a gap in the written assessment and should feed back into it.
  • Under ISO 45001 this sits in operational control, as the mechanism confirming that planned controls are in place before work proceeds.

What it is

What it is

What is a pre-task risk assessment?

A short check at the point of work, immediately before the task, confirming that the conditions the written assessment assumed still hold and identifying anything different today. It concludes with a decision to proceed, proceed with additional controls, or stop.

How is it different from the written risk assessment?

The written assessment is prepared in advance and describes the task in general. The pre-task assessment is performed by the people doing the work, on the day, and addresses the specific conditions in front of them. One establishes the controls; the other confirms they still apply.

When to use it

When to use it, and when not to

A short check immediately before work, based on an existing written assessment. It is not a substitute for one.

Use it for

  • Immediately before a task covered by a written assessment, at the location
  • Where conditions vary between occasions: outdoor work, shared sites, changing layouts
  • When the crew, equipment or timing differs from the assumption in the written assessment
  • After any interruption to the work where conditions may have changed
  • As part of a permit process, confirming conditions at the point of issue

Not for

  • The written task risk assessment, which establishes the hazards and controls in advance
  • Permit to work, which authorises a high-risk activity with its own gates and closure
  • Toolbox talk, which is a briefing rather than an assessment of today's conditions
  • Plant and equipment pre-use inspection, which checks the equipment rather than the conditions
  • Method statement, which describes how the work will be performed

Standards

What it is built against

Pre-task assessment sits within operational control rather than in a standard of its own.

ClauseRequirementWhere it lands
ISO 45001 cl.8.1Operational planning and control, with criteria for processes and control according to those criteriaHeader
ISO 45001 cl.8.1.2Hierarchy of controls applied, with additional controls where conditions differToday's controls
ISO 45001 cl.5.4Consultation and participation of workers, which this operationalises at the point of workWhat is different today
ISO 45001 cl.7.3Awareness including the ability to remove oneself from situations of imminent dangerDecision
OSHA 1926 Subpart PCompetent person inspection before each shift and after rain, an example of a mandated pre-task checkWhat is different today
OSHA 1910.132(d)Hazard assessment determining PPE, which the pre-task check confirms remains appropriateToday's controls
HSE Management Regs reg.3Assessment kept under review, with review triggered when it may no longer be validDecision
ISO 45001 cl.8.1.4Coordination with contractors where more than one party works in the same areaWhat is different today

What it does not cover

  • The written task risk assessment, which establishes the hazards and controls and must exist first.
  • Permit to work, which authorises specified high-risk activities with formal gates and closure.
  • Method statement, describing the sequence and method rather than assessing conditions.
  • Pre-use equipment inspection, which examines the plant rather than the environment.
  • Toolbox talk, which communicates rather than assesses.

Filling it in

Filling it in well

Three questions, honestly answered, in about two minutes.

Ask what is different, not what the hazards are

Weather and ground condition, access and egress, adjacent work and who else is in the area, crew composition and experience, equipment available versus equipment assumed, and time pressure. Each is observable at the location and none can be answered from the office.

Do it at the location, by the crew

Standing where the work will happen, immediately before starting. A pre-task assessment completed in a vehicle, at a depot, or at the start of a shift for work happening later has assessed conditions that may no longer exist and, more importantly, has not looked at them.

Make stop a real option

The decision field should offer proceed, proceed with additional controls, or stop and escalate. Where the form only records proceeding, the crew learns that the assessment has one permitted outcome. Recording the occasions when work was stopped or modified is the evidence the process functions.

Feed repeated differences back

If the same difference appears week after week, it is not a variation. Access always blocked, equipment always unavailable, crew always one short. That is a gap in the written assessment or in the planning, and the pre-task record is where it becomes visible if anyone reads the accumulation.

Audit findings

Common audit findings

Findings here concern whether the check is real.

FindingClauseWhat fixes it
Pre-task form duplicates the written assessment's hazard list.ISO 45001 cl.8.1Ask what is different from the assumption; duplication guarantees disengagement.
Completed away from the location or before the day of work.ISO 45001 cl.8.1Perform at the point of work immediately before starting.
No outcome other than proceed available on the form.ISO 45001 cl.7.3Include stop and escalate; a single-outcome assessment is not a decision.
Same difference recorded repeatedly with no change to the written assessment.HSE Management Regs reg.3Repeated variation is a gap in the underlying assessment, not a daily condition.
Adjacent work and other parties not considered on shared sites.ISO 45001 cl.8.1.4Include who else is working nearby; interface hazards belong to nobody by default.
Signed by a supervisor rather than the crew performing the work.ISO 45001 cl.5.4The crew performs it; a supervisory signature records approval rather than assessment.
No written assessment exists behind the pre-task check.ISO 45001 cl.6.1.2The pre-task check confirms an assessment; it cannot substitute for one.
Work resumed after a long interruption without rechecking.ISO 45001 cl.8.1Recheck after interruptions; conditions and adjacent activity change while work is paused.
Additional controls identified but not implemented before starting.ISO 45001 cl.8.1.2Implement before proceeding; identifying a control and starting anyway is worse than not identifying it.
Records never reviewed in aggregate.ISO 45001 cl.9.1Read the accumulation; the pattern of differences is the useful output.

Worked case

Case in point: the form completed in the van

A maintenance contractor introduced a pre-task assessment card for every job. It listed the hazards from the written assessment, the standard controls, and a signature line. Compliance was excellent: cards were completed for every job and filed.

A review of six months of cards found that the handwriting on most of them was uniform across the whole day, including for jobs at sites the crew reached hours apart. The cards were being completed at the start of the shift, in the van, before anyone had seen any of the locations.

The crew were not being negligent. The card asked questions they could answer from memory, because it duplicated a document they already knew, so completing it in advance cost nothing and saved time at each site.

Definitions

Definitions and key terms

Point of work
The physical location where the task will be performed, and the only place a pre-task assessment can meaningfully be completed.
Dynamic risk assessment
Continuous reassessment during the task as conditions change, of which the pre-task check is the starting point.
Go or no-go decision
The explicit conclusion of the check: proceed, proceed with additional controls, or stop and escalate.
Interface hazard
Risk arising where two parties or activities meet, which neither party's own assessment covers.
Written assessment
The prepared task assessment establishing hazards and controls, which the pre-task check confirms remains valid.
Escalation
Referral upward where conditions differ enough that the crew cannot make the controls adequate on their own.
Stop work authority
The explicit right of any worker to halt an activity they believe is unsafe, without which the stop option is nominal.
Repeated variation
A difference recorded so often that it is a condition rather than a variation, indicating a gap in planning or assessment.

FAQ

Frequently asked questions

What should the pre-task check actually ask?+

What is different from what the written assessment assumed: weather and ground, access and egress, who else is working nearby, crew composition and experience, equipment available against equipment expected, and time pressure. Those are observable at the location and cannot be answered from memory, which is what makes the check real.

Why not list the hazards again?+

Because the crew already knows them from the written assessment, so the form asks nothing and becomes a signature exercise. The commonest failure mode is a pre-task card that duplicates the underlying document, and it degrades within weeks into something completed in advance.

Who should complete it?+

The people performing the work, at the location, immediately before starting. A supervisor's signature records approval rather than assessment, and the point of the check is that the people exposed have looked at the conditions themselves and reached a decision about them.

What does a working process look like in the records?+

Some proportion of checks concluding in additional controls or in stopping. Where every card records proceed, either conditions never vary or the check is not being performed honestly, and the second is far more likely. Occasions when work was modified or halted are the evidence that the process functions.

What do we do with repeated differences?+

Feed them into the written assessment or the planning. Access always obstructed, equipment always missing, crew always short: these are conditions rather than variations, and the pre-task record is where they become visible in aggregate. Reading the accumulation is the step most organisations skip.

The agents

What the agents do with it

The check is two minutes at the point of work. What fails is the form that could be completed in a van and the pattern nobody read.

KnowSafe

Presents the written assessment's assumptions and asks only what differs today, captured at the location on a device rather than on a card.

Ella

Reads the accumulation of recorded differences and surfaces repeated variations as gaps in the written assessment or in planning.

KnowContractor

Covers shared sites where adjacent work creates interface hazards that neither party's own assessment addresses.

KnowMaintain

Connects equipment availability to the check, since equipment assumed and equipment present are frequently different.

This template lives in KnowSafesafety and compliance. Incidents, hazards, permits, inspections and the critical controls behind them.

Meet KnowSafe

Sources

Sources

  • ISO 45001:2018 clauses 8.1, 8.1.2, 8.1.4 and 7.3
  • Management of Health and Safety at Work Regulations 1999, regulation 3 (GB)
  • 29 CFR 1926 Subpart P, excavations, competent person inspection requirements, OSHA
  • 29 CFR 1910.132(d), hazard assessment for personal protective equipment, OSHA
  • HSE guidance on risk assessment and dynamic assessment at the point of work

KnowSafe

Also in Risk Studies

6Browse the whole library
Assessment

Job Safety Analysis

Breaks a job into steps, finds the hazards in each and sets the controls. Done before new or changed work and reviewed yearly. Carried out by a supervisor with the people who do the job. The most useful safety document on most sites, because the workers write it.

Assessment

Task Risk Assessment

A fuller assessment of a task, its hazards and its controls, using the shared risk method. Done when a task is new, has changed or has caused problems. Carried out by a trained assessor with the work team. Feeds the controls into the JSA and the training.

Assessment

Hazard Identification Study

A structured search for hazards across an area, process or new installation. Run at design stage and on a set review cycle. Carried out by a team drawn from operations, maintenance and safety. Feeds the risk register rather than producing a standalone document.

Assessment

Bowtie Analysis

Maps a major hazard from its causes through to its consequences, and shows which barriers sit in between. Built for each fatal risk and reviewed yearly. Carried out by a facilitated team. Produces the critical controls that then get their own verification schedule.

Assessment

What If Study

A guided team discussion asking what could go wrong at each stage of a process. Run for new processes or before a significant change. Led by a facilitator with operations and engineering. Simple to run and surprisingly effective at finding gaps others miss.

Assessment

Change Risk Review

Assesses the risk created by a proposed change before it goes ahead. Raised alongside every management of change record. Carried out by the change owner with affected areas. Covers what the change introduces and what it might quietly remove.

Start in Minutes, Not Weeks

Launch a Ready-Made Template and Customize It Your Way