Knowella

Traffic Management Plan

Sets the routes, crossings, speed limits, one way systems and parking that keep vehicles and people apart. Written once and reviewed yearly or on layout change. Owned by the site lead. The document contractors and hauliers are briefed against.

KnowSafePlanSAF-140
Completed by
Owned by the site lead
Raised
When the thing being planned is created, and again at the

Summary

In short

  • A traffic management plan is a plan used in KnowSafe that sets the routes, crossings, speed limits, one way systems and parking that keep vehicles and people apart. It is built against ISO 45001 cl.8.1 and forms part of the Warehouse and Dock Safety programme.
  • Written once and reviewed yearly or on layout change. Owned by the site lead.
  • The template holds 43 fields across 4 sections.
  • Scoring is plan current, where high is good.
  • ISO 45001 is occupational health and safety management systems. The international standard for managing worker health and safety. Certifiable, and the backbone of most of this library.
  • It connects to the rest of the library: links Vehicle pedestrian assessment, Contractor induction.

What it is

What it is

What is a traffic management plan?

A traffic management plan is a plan used in KnowSafe that sets the routes, crossings, speed limits, one way systems and parking that keep vehicles and people apart. It is built against ISO 45001 cl.8.1 and forms part of the Warehouse and Dock Safety programme.

When is a traffic management plan completed?

A traffic management plan is completed when the thing being planned is created, and again at the stated review interval. Written once and reviewed yearly or on layout change.

When to use it

When to use it, and when not to

This plan is one step in a larger programme. Using it for work that belongs to a neighbouring template produces records that are hard to report on later.

Use it for

  • The event or activity this plan covers has occurred, or is about to
  • Authorisation is needed before the work can begin
  • A new record is needed; each one gets its own ID in the form TMP-2026-000
  • You are running the Warehouse and Dock Safety programme and this is one of its steps
  • A linked record needs this one to exist: links vehicle pedestrian assessment, contractor induction

Not for

  • Racking Inspection, which checks pallet racking for damage, overload and missing components against the damage classification in use.
  • Racking Damage Report, which reports damage found on racking at any time, not only during inspection.
  • Loading Dock Safety Check, which checks dock levellers, edge protection, lighting, restraints and pedestrian separation before and during loading.
  • Anything outside KnowSafe, which belongs in the workspace that owns that process

Standards

What it is built against

ISO 45001Occupational health and safety management systems

The international standard for managing worker health and safety. Certifiable, and the backbone of most of this library.

ISOInternational Organization for Standardization

A voluntary international standard. Widely adopted, often required by customers, and certifiable where a management system standard.

FAQ

Frequently asked questions

What is the traffic management plan template based on?+

It is built against ISO 45001 cl.8.1. ISO 45001 is occupational health and safety management systems. The international standard for managing worker health and safety. Certifiable, and the backbone of most of this library. ISO is international Organization for Standardization. A voluntary international standard. Widely adopted, often required by customers, and certifiable where a management system standard.

What sections does the traffic management plan contain?+

There are 4 sections: header, routes and separation, rules, communication and maintenance. Together they hold 43 fields, 36 of which are required.

How often is a traffic management plan raised?+

A new record is raised when the thing being planned is created, and again at the stated review interval. Each one is given an ID in the form TMP-2026-000, so it can be traced and referenced from other records.

Which programme does the traffic management plan belong to?+

It is part of Warehouse and Dock Safety. Racking damage classified and acted on, trailers restrained, and pedestrians separated rather than warned.

How is a traffic management plan scored?+

Scoring is plan current. High is good. Scores exist to make the form tell you something, not to produce a percentage for its own sake.

Can the traffic management plan template be changed?+

Yes. Every field, option, score and conditional rule is editable, and the links to other templates come with it. Most teams install it as it is, run it for a cycle, then adjust.

The agents

What the agents do with it

The form is the easy part. Keeping it current, routing it to the right owner and holding the evidence together is the work that actually slips.

KnowSafe

Holds the traffic management plan library against your registers, routes each record to its owner, and keeps the evidence trail together.

Ella

Coordinates the crew, rolls completion and exceptions into one view, and holds every write for your approval before it touches a record.

This template lives in KnowSafesafety and compliance. Incidents, hazards, permits, inspections and the critical controls behind them.

Meet KnowSafe

Sources

Sources

  • ISO 45001 — Occupational health and safety management systems
  • ISO — International Organization for Standardization

KnowSafe

Also in Warehouse Safety

6Browse the whole library
Inspection

Racking Inspection

Checks pallet racking for damage, overload and missing components against the damage classification in use. Run weekly by the area owner and yearly by a competent person. Damaged uprights are the most common cause of rack collapse, and collapse rarely stops at one bay.

Record

Racking Damage Report

Reports damage found on racking at any time, not only during inspection. Raised by whoever finds it, immediately. Completed in under a minute with a photograph. Damage classified as red takes the bay out of use before anything else happens.

Checklist

Loading Dock Safety Check

Checks dock levellers, edge protection, lighting, restraints and pedestrian separation before and during loading. Run at shift start. Completed by the dock supervisor. The dock is where vehicles, pedestrians and forklifts meet at the same edge.

Record

Trailer Restraint and Chock Record

Records that a trailer is restrained and its keys controlled before anyone enters it. Completed at every load and unload. Signed by the loader and the driver. Vehicles pulling away with a forklift inside remain a leading cause of dock fatalities.

Inspection

Mezzanine and Edge Protection Check

Checks handrails, toe boards, pallet gates and floor openings on raised storage areas. Run monthly. Completed by the area owner. Pallet gates propped open for convenience are the usual finding and the usual cause of a fall.

Checklist

Pallet and Load Condition Check

Checks pallets and made up loads for damage, overhang, stability and wrap quality before they are stored or shipped. Run at the point of build. Completed by the operator. An unstable load is dangerous in the rack, in the trailer and at the customer.

Start in Minutes, Not Weeks

Launch a Ready-Made Template and Customize It Your Way

Every template is fully editable. Adjust fields, workflows, and branding to match your processes, then deploy to your team instantly.