First Article Inspection Template

A first article inspection verifies the production process, not the part. The distinction is the whole point: a part made by a skilled engineer on a bench will pass and proves nothing, because what the inspection is supposed to establish is that the documented process, using the specified tooling and setup, produces conforming product.

KnowQualityInspectionQUA-012Pinned in navigation50 fields across 5 sectionsFull researchSee the form

Reviewed by Siddarth SinghCSPLast reviewed 16 August 2026

Basis
AS9102, ISO 9001 cl.8.5.1
Workspace
KnowQuality
Form type
Inspection
Verifies
The process, not the part
Triggers
Change, and a two-year lapse

The short version

  • The purpose is to verify the process, so the part must be produced using production tooling, production processes and production personnel, not by a specialist on a bench.
  • Every design characteristic must be verified, uniquely numbered and accounted for. Sampling is not first article inspection.
  • A lapse of two years since the last production run is itself a trigger under AS9102, because process knowledge and tooling condition both degrade.
  • Partial first article inspection covers only the characteristics affected by a change, and the reasoning for what was excluded belongs on the record.
  • The three AS9102 forms serve different purposes: part identification, product accountability including materials and special processes, and characteristic verification.
  • Non-conformance found during first article inspection is a process finding rather than a part finding, and dispositioning the part without addressing the process misses the point.

What this is

What is a first article inspection?

What is a first article inspection?

A complete, independent and documented verification that a production process is capable of producing conforming product, performed by inspecting a part produced by that process against every design characteristic and recording the result for each.

When is a first article inspection required?

Under AS9102, for a new part or assembly, a change to design, materials, process, manufacturing source or location, a change in numerical control programme or method, a natural or man-made event affecting the process, and where two years have passed since the last delivery from that process.

Scope

When is a first article inspection required?

This verifies a production process through a produced part. It is not routine inspection.

Use this template when

  • New parts and assemblies before production release
  • Design, material, process, tooling, source or location changes
  • Change to a numerical control programme or manufacturing method
  • After a lapse in production, with two years as the AS9102 trigger
  • Following an event affecting the manufacturing process, including relocation or equipment replacement

Do not use it for

  • Routine in-process and final inspection, which samples against the control plan
  • Process capability studies, which assess variation over many parts
  • Production part approval processes used in automotive, which have their own structure and submission levels
  • Material certification and test reports, which are referenced rather than replaced
  • Gage R&R and measurement system analysis, which qualify the measurement used

Compliance mapping

Which AS9102 requirements does this satisfy?

First article inspection is defined in an aerospace standard and applied more widely as good practice.

ClauseRequirementWhere it lands
AS9102First article inspection requirement, forms and triggers, including the two-year lapseHeader
AS9102 Form 1Part number accountability, including assembly structure and sub-assembly first article statusProduct identity
AS9102 Form 2Product accountability: materials, special processes, and functional testingSetup context
AS9102 Form 3Characteristic accountability, verification and compatibility evaluation, with unique numberingCharacteristics checked
AS9100 cl.8.5.1.3Production process verification, of which first article inspection is the mechanismResult
ISO 9001 cl.8.5.1Controlled production including validation of processes where output cannot be verifiedHeader
ISO 9001 cl.8.6Release of products and services only when planned arrangements are satisfactorily completedResult
AS9100 cl.8.5.1.1Control of equipment, tools and software programs used in productionSetup context

What it does not cover

  • Routine in-process and final inspection, sampling against the control plan.
  • Process capability studies, assessing variation across many parts over time.
  • Production part approval processes used in automotive, with their own structure and submission levels.
  • Material certifications and test reports, referenced within the record rather than replaced by it.
  • Measurement system analysis, qualifying the measurements the inspection relies on.

How to complete it

How to complete a first article inspection, step by step

Produce it properly, account for every characteristic, and treat any finding as a process finding.

Record the production context, not just the result

Which machine, which tooling, which programme revision, which fixture, which operator and which material lot. The inspection is evidence about a process, and without the context it is evidence about a part. This section is what makes the record meaningful when the same part is produced again in two years.

Number and account for every characteristic

Uniquely number every design characteristic on the drawing and specification, and record a result against each. Every characteristic must be accounted for, including those verified by material certification, special process certification or supplier documentation. Unaccounted characteristics are the most common AS9102 finding.

State what a partial inspection covered and why

Where a change triggers a partial first article inspection, record which characteristics were affected and why the others were excluded. That reasoning is the substance of a partial submission, and a partial inspection without it cannot be distinguished from an incomplete full one.

Treat non-conformance as a process problem

A characteristic out of tolerance at first article means the process as documented does not produce conforming product. Dispositioning that part and proceeding addresses the part alone. The finding belongs to the setup, tooling, programme or method, and the inspection exists to catch that fault before a thousand parts inherit it.

What auditors find

Most common first article inspection findings

First article findings concentrate on how the part was made and on characteristic accountability.

FindingClauseWhat fixes it
Part produced outside the production process or by non-representative personnel.AS9102Use production tooling, programme and people; the process is what is being verified.
Characteristics not uniquely numbered or not fully accounted for.AS9102 Form 3Every characteristic requires a number and a result, including those verified by certification.
Partial inspection without stated scope and exclusion reasoning.AS9102Record which characteristics the change affected and why the rest were excluded.
Production context not recorded.AS9100 cl.8.5.1.1Machine, tooling, programme revision and material lot are what make the record meaningful later.
Two-year lapse trigger not applied.AS9102A gap since last production is itself a trigger; process knowledge and tooling both degrade.
Non-conformance dispositioned without process correction.AS9100 cl.8.5.1.3A first article failure is a process finding; the part is a symptom.
Special processes and material certifications not accounted for.AS9102 Form 2These are part of product accountability and must be evidenced, not assumed.
Measurement system not qualified for the characteristics being verified.ISO 9001 cl.7.1.5An unqualified measurement makes the verification result unreliable.
Sub-assembly first article status not reflected in the assembly record.AS9102 Form 1Assembly accountability includes the status of its constituent parts.
Change to numerical control programme not treated as a trigger.AS9102Programme and method changes are explicit triggers regardless of design being unchanged.

Case in point

Case in point: the part made by the best machinist

A supplier under schedule pressure needed a first article approved before a production release. The production cell was committed and the setup would not be available for several days, so the part was produced on a different machine by the most experienced machinist available, with additional finishing passes.

Every characteristic conformed. The first article inspection was submitted, approved and closed. Production began the following week on the intended cell with the intended programme.

Two characteristics on the production parts fell outside tolerance consistently, because the fixture on the production cell located the part differently from the one used for the first article. The inspection had verified a part and had said nothing about the process, which is what it existed to do.

The template

The template, field by field

The form exactly as it installs. Every field, option, score and conditional rule is editable, and the links to other templates come with it.

50fields
5 sections
Reference
QUA-012
Archetype
Inspection
Record ID
INSP-2026-000
Scoring
Pass or fail per characteristic
Direction
High is good
Singleton
No
Basis
AS9102, ISO 9001 cl.8.5.1
Links
Links Asset, Job
Tags
Quality, Inspection
Sections
5
Fields
50
Follow up fields
4
Repeating sections
1
Links out
5
Field typesOwn ID, generated on saveCase thread and parentPick list from a registryLinked to another templateFollow up, dashed outlineScored

Header

15 fields
Text

Inspection ID*

Generated on save

Auto sequence. Format INSP-2026-00000.

The record's own ID. Other templates point at this value.

Single Choice

Status*

Scored

Drives who this goes to next.

  • Planned2 pts
  • In progress2 pts
  • Complete3 pts
  • Deferred0 pts
  • Open0 pts
  • Closed3 pts
  • Overdue0 pts
Date & Time

Date and Time*

Users

Raised By*

Pick List

Site*

From FDN-001 Site NameFilter: Status is Active
Text

Site ID*

Linked

Format SITE-000.

Links to FDN-001 Site ID

Single Choice

Line*

Line 1Line 2Line 3Line 4Line 5
Single Choice

Shift*

DayAfternoonNight
Users

Line Lead

Optional
Numeric Answer

Batch Number*

Linked

Numeric key joining to your ERP batch record.

Links to External system reference

Single Choice

Product*

Sliced hamSmoked turkeyGround beefCultured milkYoghurtCream cheese
Date & Time

Production Date*

Pick List

Asset

OptionalFrom FDN-002 Asset NameFilter: Site matches
Text

Asset ID

OptionalLinked

Format AST-0000.

Links to FDN-002 Asset ID

Info

Before The Run, Not During

First article confirms the setup is right before you make three thousand of them wrong. Hold the line until this passes.

Setup context

3 fields
Single Choice

Reason For First Article*

New product, changeover, tooling change, after maintenance or new operator.

New productChangeoverTooling changeAfter maintenanceNew operator
Single Choice

Previous Product

Optional
Sliced hamSmoked turkeyGround beefCultured milkYoghurtRanch dressing
Text

Setup Approval ID

OptionalLinked

Links to QUA-060 Setup ID

Characteristics checked

Repeats7 fields
Text

Characteristic*

Text

Specification*

Text

Measured Value*

Single Choice

Measurement Method*

CalliperMicrometerGaugeCMMVision systemVisualScale
Text

Test Equipment ID

OptionalLinked

Links to QUA-064 Equipment ID

Single Choice

Within Specification*

Scored
  • Yes3 pts
  • Borderline1 pt
  • No0 pts
Text

Deviation Detail

OptionalShows if Within Specification equals No

Product identity

10 fields
Single Choice

Correct Product Running*

Scored
  • Yes3 pts
  • No0 pts
Single Choice

Correct Packaging Loaded*

Scored
  • Yes3 pts
  • No0 pts
Single Choice

Correct Label Loaded*

Scored
  • Yes3 pts
  • No0 pts
Single Choice

Date Code Correct*

Scored
  • Yes3 pts
  • No0 pts
Single Choice

Allergen Declaration Matches Product*

Scored
  • Pass2 pts
  • Partial1 pt
  • Fail0 pts
  • N/Aexcluded from denominator
Single Choice

Batch Code Applied*

Scored
  • Pass2 pts
  • Partial1 pt
  • Fail0 pts
  • N/Aexcluded from denominator
Single Choice

Sample Retained*

Scored
  • Yes3 pts
  • No0 pts
File Upload

Photograph

Optional
Single Choice

Line Released To Run*

Scored
  • Yes3 pts
  • No0 pts
Date & Time

Time Released

Optional

Result

15 fields
Numeric Answer

Items Assessed*

Excludes anything marked N/A.

Numeric Answer

Items Failed*

Numeric Answer

Score Percent*

Scored

Calculated on submission. High is good. N/A items leave the denominator.

Single Choice

Result Band*

Scored
  • Pass3 pts
  • Caution1 pt
  • Fail0 pts
Numeric Answer

Completeness Percent*

How much of the template was actually answered. A high score on a half completed form is not a high score.

Single Choice

Decision*

AcceptAccept under concessionRejectQuarantine pending review
Text

Comments

Optional
Single Choice

Action Required*

Scored

Raise the action record, then enter its reference here.

  • No2 pts
  • Yes0 pts
Single Choice

Priority

OptionalScoredShows if Action Required equals Yes
  • High0 pts
  • Medium1 pt
  • Low3 pts
Text

CAPA ID

OptionalLinkedShows if Action Required equals Yes

Format CAPA-2026-00000.

Links to FDN-014 CAPA ID

Users

Action Owner

OptionalShows if Action Required equals Yes
Users

Inspector*

Signature

Signature*

Users

Line Lead*

Signature

Second Signature*

QUA-012 · record IDs look like INSP-2026-000 · Links Asset, Job

Open in Knowella

Run it with agents

From a document you fill in to a programme that runs itself

The inspection verifies a process through a part. What fails is the part made outside the process and the characteristic nobody accounted for.

KnowQuality

Holds characteristic accountability with unique numbering, records production context, and applies the AS9102 triggers including the two-year lapse.

KnowMaintain

Links tooling, fixtures and programme revisions to the record, since these are the process elements the inspection actually verifies.

Ella
Ella

Flags changes to source, location, method or programme as triggers, which are easy to make without anyone treating them as quality events.

KnowLogistics

Connects material lot traceability to the record, since material accountability forms part of the submission.

This template lives in KnowQuality — quality and food safety. HACCP, nonconformance, traceability, laboratory and customer complaints.

Meet KnowQuality→

Glossary

First Article Inspection definitions and key terms

First article
A representative part produced by the production process, used to verify that the process produces conforming product.
Characteristic accountability
Uniquely numbering every design characteristic and recording a result against each, with none omitted.
Partial first article inspection
Verification limited to characteristics affected by a change, requiring the scope and exclusions to be recorded.
Production representative
Made using production tooling, programme, process and personnel, which is what makes the inspection meaningful.
Special process
A process whose output cannot be fully verified by subsequent inspection, such as heat treatment or coating, requiring accountability.
Delta FAI
An inspection covering only changed characteristics, referencing the previous full inspection.
Two-year lapse
An AS9102 trigger requiring a new inspection where that period has passed since the last production delivery.
Compatibility evaluation
Assessment recorded on Form 3 confirming the characteristic is acceptable against the design requirement.

FAQ

Frequently asked questions about first article inspection

What is a first article inspection actually verifying?+

The production process. The part is the evidence, not the subject. This is why the part must be produced using production tooling, programme, process and representative personnel, and why a part made carefully outside the process, however conforming, verifies nothing about what the process will produce.

When is one required?+

Under AS9102: a new part or assembly, a change to design, materials, process, manufacturing source or location, a change to a numerical control programme or method, an event affecting the process, and where two years have passed since the last delivery from that process. The two-year lapse trigger is the one most often overlooked.

Can characteristics be sampled?+

No. Every design characteristic must be uniquely numbered and accounted for, including those verified through material certification, special process certification or supplier documentation. Unaccounted characteristics are among the most common findings against AS9102, and sampling is what routine inspection does rather than what this does.

What is a partial or delta inspection?+

Verification limited to the characteristics affected by a change, referencing the previous full inspection for the rest. The scope and the reasoning for exclusions are the substance of it. Without them a partial submission is indistinguishable from an incomplete full one, and the reasoning is what an assessor examines.

What should happen if a characteristic fails?+

Treat it as a process finding. A characteristic out of tolerance at first article means the process as set up does not produce conforming product, and the correction belongs in the setup, tooling, programme or method. Dispositioning the individual part and proceeding addresses the symptom and leaves the next thousand parts exposed to the same condition.

Keep going

Related templates and programmes

Siddarth Singh

Written and reviewed by

Siddarth Singh

Founder & Chief Executive Officer, Knowella

Certified Safety Professional and industrial and systems engineer with more than a decade inside food supply chain, freight and manufacturing operations. This page was written against the current text of the standards it cites, not against secondary summaries of them.

  • Certified Safety Professional (CSP), Board of Certified Safety Professionals
  • MBA, University of Chicago Booth School of Business
  • MS and BS, The Ohio State University, Industrial and Systems Engineering
  • Six Sigma Black Belt
Verify with BCSP →

Sources and last review. Reviewed 16 August 2026 against:

  • AS9102, aerospace first article inspection requirement
  • AS9100 clauses 8.5.1.1 and 8.5.1.3, production process verification
  • ISO 9001:2015 clauses 8.5.1 and 8.6
  • AIAG Production Part Approval Process, for comparison in automotive
  • ISO 9001:2015 clause 7.1.5, monitoring and measuring resources

This page is general guidance, not legal advice. Confirm requirements with your jurisdiction’s regulator.