Management Review Record Template

Management review is the only requirement in a management system standard that obliges senior leadership to make decisions, and it is routinely converted into a presentation they receive. The distinguishing feature of a real review is that resources moved as a result of it.

KnowComplyReviewCMP-014Pinned in navigation58 fields across 6 sectionsFull researchSee the form

Reviewed by Siddarth SinghCSPLast reviewed 16 August 2026

Basis
ISO 45001 cl.9.3, ISO 9001 cl.9.3
Workspace
KnowComply
Form type
Review
Required output
Decisions, with owners
Common failure
A report, not a review

The short version

  • The outputs are prescribed and they are decisions. Improvement opportunities, changes needed to the system, resource needs, and implications for strategic direction.
  • The inputs are also prescribed and are routinely incomplete. Status of actions from previous reviews is the input most often missing, and it is the one that reveals whether the last review changed anything.
  • Attendance by top management is the requirement, not attendance by the quality or safety function presenting to them.
  • ISO 45001 adds inputs the quality standards do not: consultation and participation of workers, and the adequacy of resources for maintaining an effective system.
  • A review where nothing was contested is usually a review where nothing was decided. Genuine reviews involve disagreement about priorities and resources.
  • The single most informative measure is what proportion of previous review actions were completed, and it is rarely presented.

What this is

What is a management review?

What is a management review?

A review by top management, at planned intervals, of the management system's continuing suitability, adequacy and effectiveness, using defined inputs and producing defined outputs including improvement opportunities, changes to the system, and resource needs.

Why is it a decision requirement?

Because the standards specify outputs that are decisions rather than conclusions: opportunities for improvement, need for changes to the system, resource needs, and, in ISO 45001, any implications for the strategic direction. A review producing observations without decisions has not delivered the required outputs.

Scope

When is a management review record required?

This records the review itself. The information reviewed is generated elsewhere.

Use this template when

  • Scheduled management review at planned intervals, typically annually or more often
  • Additional review following a significant incident, change, acquisition or external finding
  • Combined reviews across quality, safety, environment and other systems where they are integrated
  • Reviewing the adequacy of resources and the need for changes to the system
  • Recording decisions with owners, dates and the resources committed

Do not use it for

  • Internal audit results and reports, which are an input to this review
  • Performance data and dashboards, which are inputs rather than the review
  • Corrective action tracking, which is a separate ongoing process
  • Risk registers, which the review examines rather than contains
  • Operational meetings, which address delivery rather than system effectiveness

Compliance mapping

Which ISO 45001 cl.9.3 requirements does this satisfy?

Management review is specified with unusual precision about both inputs and outputs.

ClauseRequirementWhere it lands
ISO 45001 cl.9.3Top management to review the OH&S management system at planned intervals for suitability, adequacy and effectivenessHeader
ISO 45001 cl.9.3(a)Status of actions from previous management reviewsInputs reviewed
ISO 45001 cl.9.3(c)Adequacy of resources for maintaining an effective management systemDecisions made
ISO 45001 cl.9.3(d)Relevant communication with interested parties, and consultation and participation of workersInputs reviewed
ISO 45001 cl.9.3 outputsConclusions on suitability, improvement opportunities, changes needed, resources, and strategic implicationsOutputs
ISO 9001 cl.9.3.2Inputs including customer satisfaction, process performance, nonconformity, audit results and supplier performanceInputs reviewed
ISO 9001 cl.9.3.3Outputs including improvement opportunities, system changes and resource needsOutputs
ISO 14001 cl.9.3Environmental management system review with its own specified inputs including compliance obligationsInputs reviewed

What it does not cover

  • Internal audit reports, which are an input to the review.
  • Performance dashboards, which supply information rather than constituting the review.
  • Corrective action tracking, an ongoing process the review examines in aggregate.
  • Risk and opportunity registers, which the review considers.
  • Operational and production meetings, which address delivery rather than system effectiveness.

How to complete it

How to complete a management review record, step by step

Cover the specified inputs, contest the priorities, and record decisions with owners and resources.

Open with the status of previous actions

It is a specified input in every version of the standard and it is the one most often skipped. Reviewing what was decided last time and what happened to it establishes immediately whether the review process has any effect, and a low completion rate is the most important finding available at the start of the meeting.

Ensure top management are present and deciding

The requirement is a review by top management, not a report to them. Where the same person prepares the pack, presents it, answers the questions and writes the minutes, the review has been conducted by the management representative with senior people in attendance.

Record decisions with owner, date and resource

The prescribed outputs are decisions. A decision without an owner and a date is a sentiment, and a decision requiring resource without the resource committed is a deferral. The minutes should distinguish between what was noted, what was decided and what was funded.

Address the resource adequacy question explicitly

ISO 45001 requires review of the adequacy of resources for maintaining an effective system. That is an uncomfortable question and it is the one the standard specifically obliges leadership to answer, which is why it is usually converted into a description of what resources exist rather than a judgement about whether they are enough.

What auditors find

Most common management review record findings

Management review findings concentrate on whether it is a review at all.

FindingClauseWhat fixes it
Status of previous actions not reviewed.ISO 45001 cl.9.3(a)A specified input and the fastest indicator of whether reviews produce change.
Outputs recorded as observations rather than decisions.ISO 45001 cl.9.3The prescribed outputs are decisions; record owner, date and resource.
Top management not present, or present without deciding.ISO 45001 cl.9.3The review is by top management, not to them.
Resource adequacy described rather than judged.ISO 45001 cl.9.3(c)Answer whether resources are adequate, which is what the clause asks.
Worker consultation and participation not among the inputs.ISO 45001 cl.9.3(d)An explicit ISO 45001 input frequently absent from reviews inherited from quality systems.
Specified inputs partially covered with no record of omissions.ISO 9001 cl.9.3.2Cover all inputs or record why one was not relevant.
Review conducted at an interval that cannot respond to events.ISO 45001 cl.9.3Planned intervals should suit the rate of change, and significant events warrant additional review.
Decisions made without any change in resource allocation.ISO 45001 cl.9.3A decision requiring resource without the resource committed is a deferral.
Same improvement opportunities recorded across consecutive reviews.ISO 45001 cl.10.3Recurrence indicates the review records intent rather than producing action.
Minutes do not distinguish noted from decided.ISO 45001 cl.7.5Separate them; the record should show what leadership actually committed to.

Case in point

Case in point: three years of the same slide

A manufacturer held annual management reviews with full attendance, complete input coverage and detailed minutes. The certification body raised no findings against clause 9.3 in three consecutive surveillance visits.

Reviewing three years of minutes together, the same improvement opportunity appeared each year: strengthening contractor management. Each year it was recorded as an opportunity, each year no owner was assigned, and each year the following review recorded it again without noting that it was a repeat.

The status of previous actions had been presented each year as a percentage completion figure covering actions that had owners. The recurring opportunity had never become an action, so it never appeared in that figure and was never recorded as outstanding.

The template

The template, field by field

The form exactly as it installs. Every field, option, score and conditional rule is editable, and the links to other templates come with it.

58fields
6 sections
Reference
CMP-014
Archetype
Review
Record ID
MRR-2026-000
Scoring
Not scored
Direction
n/a
Singleton
No
Basis
ISO 45001 cl.9.3, ISO 9001 cl.9.3
Links
Links Objectives, Audits, KPIs
Tags
Governance, Review
Sections
6
Fields
58
Follow up fields
3
Repeating sections
1
Links out
6
Field typesOwn ID, generated on saveCase thread and parentPick list from a registryLinked to another templateFollow up, dashed outlineScored

Header

10 fields
Text

Review ID*

Generated on save

Auto sequence. Format MRR-2026-000.

The record's own ID. Other templates point at this value.

Single Choice

Status*

Scored

Drives who this goes to next.

  • Planned2 pts
  • In progress2 pts
  • Complete3 pts
  • Deferred0 pts
  • Open0 pts
  • Closed3 pts
  • Overdue0 pts
Date & Time

Date and Time*

Users

Completed By*

Pick List

Site*

From FDN-001 Site NameFilter: Status is Active
Text

Site ID*

Linked

Format SITE-000.

Links to FDN-001 Site ID

Text

Review Period*

Date & Time

Meeting Date*

Pick List (multi)

Standards Covered*

From FDN-009 StandardFilter: Status is Active
Info

Decisions, Not A Slide Show

A management review that only presents numbers has not met the requirement. The output is decisions about resources, objectives and changes to the system, with owners and dates.

Attendance

3 fields
Single Choice

Top Management Present*

Scored

The person accountable for the site must attend. Delegating it defeats the purpose and fails the clause.

  • Yes3 pts
  • Deputised1 pt
  • No0 pts
Text

Attendees*

Single Choice

Worker Representation*

Scored
  • Yes3 pts
  • No0 pts

Inputs reviewed

18 fields
Single Choice

Previous Review Actions*

Scored
  • All reviewed3 pts
  • Partly1 pt
  • Not reviewed0 pts
Numeric Answer

Actions Closed Percent*

Scored
Text

Action Log ID

OptionalLinked

Links to CMP-015 Log ID

Single Choice

Internal And External Issues*

Scored
  • Reviewed3 pts
  • Briefly1 pt
  • Not covered0 pts
Single Choice

Interested Party Needs*

Scored
  • Reviewed3 pts
  • Briefly1 pt
  • Not covered0 pts
Text

Context Review ID

OptionalLinked

Links to CMP-017 Review ID

Single Choice

Performance Indicators*

Scored
  • Reviewed3 pts
  • Briefly1 pt
  • Not covered0 pts
Text

Indicator Report ID

OptionalLinked

Links to CMP-016 Report ID

Single Choice

Objectives Progress*

Scored
  • Reviewed3 pts
  • Briefly1 pt
  • Not covered0 pts
Single Choice

Incidents And Ill Health*

Scored
  • Reviewed3 pts
  • Briefly1 pt
  • Not covered0 pts
Single Choice

Audit Results*

Scored
  • Reviewed3 pts
  • Briefly1 pt
  • Not covered0 pts
Single Choice

Compliance Evaluation*

Scored
  • Reviewed3 pts
  • Briefly1 pt
  • Not covered0 pts
Single Choice

Risk And Opportunity Changes*

Scored
  • Reviewed3 pts
  • Briefly1 pt
  • Not covered0 pts
Single Choice

Consultation And Participation*

Scored
  • Reviewed3 pts
  • Briefly1 pt
  • Not covered0 pts
Single Choice

Complaints And Customer Feedback*

Scored
  • Reviewed3 pts
  • Briefly1 pt
  • Not covered0 pts
Single Choice

Contractor Performance*

Scored
  • Good3 pts
  • Acceptable2 pts
  • Poor0 pts
Single Choice

Resource Adequacy*

Scored
  • Reviewed3 pts
  • Briefly1 pt
  • Not covered0 pts
Single Choice

Continual Improvement Opportunities*

Scored
  • Reviewed3 pts
  • Briefly1 pt
  • Not covered0 pts

Discussion and conclusions

6 fields
Single Choice

System Suitable*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

System Adequate*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

System Effective*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Text

Main Strengths

Optional
Text

Main Weaknesses*

Text

Significant Risks Accepted

Optional

Where the meeting decides to live with a risk, record it explicitly with who accepted it.

Decisions made

Repeats6 fields
Text

Decision*

Single Choice

Type*

Resource, objective change, system change, policy change, or risk acceptance.

ResourceObjective changeSystem changePolicy changeRisk acceptance
Users

Owner*

Date & Time

Due Date*

Single Choice

Resource Committed*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Added To Action Log*

Scored
  • Yes3 pts
  • No0 pts

Outputs

15 fields
Single Choice

Policy Change Required*

Scored
  • No3 pts
  • Yes1 pt
Single Choice

Objectives Revised*

Scored
  • Yes3 pts
  • No change needed3 pts
  • Should have been0 pts
Single Choice

Resources Committed*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Decisions Recorded With Owners*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Minutes Circulated*

Scored
  • Yes3 pts
  • No0 pts
Single Choice

Communicated To Workers*

Scored

People who never hear the outcome stop believing the system does anything.

  • Yes3 pts
  • Partly1 pt
  • No0 pts
Date & Time

Next Review Due*

Single Choice

Action Required*

Scored

Raise the action record, then enter its reference here.

  • No2 pts
  • Yes0 pts
Single Choice

Priority

OptionalScoredShows if Action Required equals Yes
  • High0 pts
  • Medium1 pt
  • Low3 pts
Text

CAPA ID

OptionalLinkedShows if Action Required equals Yes

Format CAPA-2026-00000.

Links to FDN-014 CAPA ID

Users

Action Owner

OptionalShows if Action Required equals Yes
Users

Chair*

Signature

Signature*

Users

Compliance Lead*

Signature

Second Signature*

CMP-014 · record IDs look like MRR-2026-000 · Links Objectives, Audits, KPIs

Open in Knowella

Run it with agents

From a document you fill in to a programme that runs itself

The review is where leadership decides. What fails is a presentation received and an opportunity recorded three years running.

KnowComply

Assembles the specified inputs including previous action status, and records outputs as decisions with owner, date and resource committed.

Ella
Ella

Compares consecutive reviews and flags items recurring without an owner, which is invisible within any single review.

KnowSafe

Supplies the ISO 45001 specific inputs including worker consultation and participation, which quality-derived templates omit.

KnowTrain

Connects resource adequacy discussions to competence gaps, which are a common and rarely quantified component of the answer.

This template lives in KnowComply — audit and governance. Audit programmes, legal register, management review, risk and certification.

Meet KnowComply→

Glossary

Management Review Record definitions and key terms

Top management
The person or group directing and controlling the organisation at the highest level, whose review the clause requires.
Suitability
Whether the system remains appropriate to the organisation's context, purpose and strategic direction.
Adequacy
Whether the system is sufficient to meet requirements, including whether resources are enough.
Effectiveness
Whether the system is achieving its intended results, judged on outcomes rather than on activity.
Specified inputs
The information the standard requires the review to consider, listed explicitly in clause 9.3.
Specified outputs
The decisions the review must produce, including improvement opportunities, system changes and resource needs.
Strategic implication
An ISO 45001 output requiring consideration of what the review means for the organisation's direction.
Action status
What happened to decisions from previous reviews, a specified input and the clearest measure of review effectiveness.

FAQ

Frequently asked questions about management review record

What makes a management review real rather than nominal?+

Whether anything moved. The prescribed outputs are decisions: improvement opportunities, changes needed to the system, resource needs and strategic implications. A review that covered every input, was fully attended and produced no decision has met the attendance requirement and not the output requirement.

What input is most often missing?+

The status of actions from previous reviews. It is specified in every version of the standard and it is the fastest available indicator of whether the review process has any effect. Where it is presented as a completion percentage, check whether items recorded as opportunities without owners are counted at all.

Does ISO 45001 differ from ISO 9001 here?+

It adds inputs the quality standard does not, notably consultation and participation of workers, and the adequacy of resources for maintaining an effective management system. Organisations that built their review from a quality system template frequently omit both, and the worker participation input is the one most often absent.

Who must attend?+

Top management, meaning those directing and controlling the organisation at the highest level. The requirement is a review by them rather than a report to them, and where the same person prepares the pack, presents it, answers every question and writes the minutes, the review has effectively been conducted by the management representative.

How can we tell if ours is working?+

Read the last three reviews together and identify items appearing more than once. Recurring improvement opportunities that never acquired an owner are the clearest evidence that the review records intention rather than producing action, and the pattern is invisible in any single review because each is closed when signed.

Keep going

Related templates and programmes

Siddarth Singh

Written and reviewed by

Siddarth Singh

Founder & Chief Executive Officer, Knowella

Certified Safety Professional and industrial and systems engineer with more than a decade inside food supply chain, freight and manufacturing operations. This page was written against the current text of the standards it cites, not against secondary summaries of them.

  • Certified Safety Professional (CSP), Board of Certified Safety Professionals
  • MBA, University of Chicago Booth School of Business
  • MS and BS, The Ohio State University, Industrial and Systems Engineering
  • Six Sigma Black Belt
Verify with BCSP →

Sources and last review. Reviewed 16 August 2026 against:

  • ISO 45001:2018 clause 9.3, management review
  • ISO 9001:2015 clauses 9.3.1, 9.3.2 and 9.3.3
  • ISO 14001:2015 clause 9.3, management review
  • ISO 45001:2018 clause 5.1, leadership and commitment
  • ISO 19011:2018, guidelines for auditing management systems

This page is general guidance, not legal advice. Confirm requirements with your jurisdiction’s regulator.

Start in Minutes, Not Weeks

Launch a Ready-Made Template and Customize It Your Way

Every template is fully editable. Adjust fields, workflows, and branding to match your processes, then deploy to your team instantly.