Knowella

Blueprints — plan a truck's lanes and move it to active

Plan which supplier-to-DC lanes a truck serves, move each blueprint through its stages with the right team, and see where the whole pipeline stands in Insights.

4 min read Real product screens
app.knowella.com Live walkthrough
Blueprints, under Management in the Supply Chain sidebar, are plans for a truck: the supplier-to-DC lanes it serves, the equipment it runs on, and the load it carries. Each blueprint moves through stages, from Engineering to Active, and each stage has a team that owns it. The Blueprints tab lists them all, Insights shows the pipeline as a whole, and Purchasing Rules sits beside them.
In this article

Open Blueprints under Management

In the Supply Chain sidebar, open <b>Management › Blueprints</b>. Three tabs sit under the title: <b>Blueprints</b>, <b>Insights</b> and <b>Purchasing Rules</b>. The top right has the <b>Distribution Centers</b> filter, <b>Refresh Results</b>, <b>Stage owners</b> and <b>+ New Blueprint</b>.

Read the four summary cards

The cards describe the blueprints that are live.

  • Active Blueprints — Blueprints running now (Active, or past their Actual Flip Date), with how many came from the distributor's lane plans and how many more are in a stage before Active.
  • Average Monthly Miles — Route miles a month on live blueprints with a route estimate.
  • Average Carrier Rate — What one whole truck costs, averaged over live blueprints that are priced.
  • Reverting to Prepaid — Running blueprints whose last results showed a lane back on prepaid freight after it had been hauled.

Follow the stages

A row of chips shows every stage, from <b>0 - Engineering</b> through <b>6 - Coordination &amp; Activation</b> to <b>Active</b>, plus <b>Dead</b> and <b>Parking Lot</b>. Each shows how many blueprints sit in it and how long they typically take.

Browse the blueprint list

Each row shows the <b>Blueprint Name</b>, <b>Category</b>, <b>Owner</b>, <b>Assignee</b>, <b>Project Name</b>, when it was created, its <b>Actual Flip Date</b>, its <b>Stage</b> with the team that owns it, how long it has been <b>In Stage</b> and which stage it came from, and <b>Orders vs Rules</b>. Page through the rest at the bottom right.

Search and filter

Type in <b>Search</b> to find blueprints by name, owner, vendor or lane, or pick a <b>Stage</b> to show only its blueprints.

Open a blueprint

Select a blueprint's name to open it. The header shows its stage and stage team, how long it has been there, and the four gates: <b>Feasible?</b>, <b>Approved by the buyer?</b>, <b>Profitable?</b> and <b>Ready to activate?</b>. <b>Ask Ella</b>, <b>Optimize these lanes</b> and <b>Edit</b> are at the top right.

See what the next stages need

<b>What the next stages need</b> lists each gate as met or not, and what's still missing, such as every order rule approved by the buyer, a carrier rate, or a positive monthly margin. A gate can be passed with a note. If a blueprint won't go ahead, a <b>Mark Dead</b> link beside the gate records why.

Review the plan and its lanes

The <b>Plan</b> tab holds the blueprint's details: name, stage, category, owner, assignee, project, dead reason, flip and dead dates, equipment and temperature. <b>Add Lanes</b> lists the lanes the truck serves, with pickup and drop locations and their sequence. It also shows each lane's monthly weight, cube, pallets and cases from the last 12 months of received POs, the allowance earned, the planning rate and the allowance per case. <b>History</b> keeps the blueprint's changes.

Create a blueprint

Select <b>+ New Blueprint</b>. In <b>Blueprint Details</b>, name it and set its stage, category, owner, assignee, equipment and temperature, and whether to <b>Monitor compliance</b>. In <b>Add Lanes</b>, search for the supplier-to-DC lanes the truck will serve; they must match on temperature and destination. <b>Optimal Load Details</b> works out how many trucks a month the lanes need; select <b>Calculate Economic Order Quantity</b> to size the order. Then select <b>Save</b>.

Set stage owners

Select <b>Stage owners</b> to pick a person for each team: Network Engineering, Transportation Planning, Procurement, Carrier Management and Finance. When a blueprint enters a stage, it's assigned to that team's person and the hand-off is recorded.

Explore Insights

The <b>Insights</b> tab looks at the whole pipeline: how many were added lately, what the running blueprints earn a month, and how many reach Active.

  • Pipeline by category and by DC — Blueprints running, in the pipeline, or dead or parked.
  • Dead now and Moved to Dead — Why blueprints died, and in which month.
  • Time in stage — How long each stage typically takes, against how long blueprints have been waiting in it now.
  • Against plan — Running blueprints judged on their full months since the flip.
  • Age, owners and trailers — How old live blueprints are, who owns them, and the trailers they plan on.

Why it matters

A truck plan touches engineering, planning, procurement, carrier management and finance. With every blueprint's stage, owner, gates and lanes in one place, and the pipeline's health in Insights, hand-offs don't get lost and stalled plans are easy to spot.

Ready to build your own?

Start free and ship your first app in minutes — or have us set it up with you.