Permit Linked Work Record

Connects maintenance work to the safety permits it requires, such as isolation, hot work or confined space. Completed alongside the work order. Signed by the technician and permit issuer. Ensures work does not start before the permit is live.

KnowMaintainRecordMNT-007Pinned in navigation
Completed by
Signed by the technician and permit issuer
Raised
At the moment the event happens, rather than reconstructed

Summary

In short

  • A permit linked work record is a record used in KnowMaintain that connects maintenance work to the safety permits it requires, such as isolation, hot work or confined space. It is built against OSHA 1910.147, ISO 45001 cl.8.1 and forms part of the Planned Maintenance programme.
  • Completed alongside the work order. Signed by the technician and permit issuer.
  • The template holds 36 fields across 4 sections, with permits held repeating for each entry.
  • ISO 45001 is occupational health and safety management systems. The international standard for managing worker health and safety. Certifiable, and the backbone of most of this library.
  • It connects to the rest of the library: links Work Order, Permit.

What it is

What it is

What is a permit linked work record?

A permit linked work record is a record used in KnowMaintain that connects maintenance work to the safety permits it requires, such as isolation, hot work or confined space. It is built against OSHA 1910.147, ISO 45001 cl.8.1 and forms part of the Planned Maintenance programme.

When is a permit linked work record completed?

A permit linked work record is completed at the moment the event happens, rather than reconstructed afterwards. Completed alongside the work order.

When to use it

When to use it, and when not to

This record is one step in a larger programme. Using it for work that belongs to a neighbouring template produces records that are hard to report on later.

Use it for

  • The event or activity this record covers has occurred, or is about to
  • A new record is needed; each one gets its own ID in the form PLW-2026-000
  • You are running the Planned Maintenance programme and this is one of its steps
  • A linked record needs this one to exist: links work order, permit

Not for

  • Maintenance Request, which asks maintenance to look at a problem or carry out a job.
  • Work Order, which the main record for a planned maintenance job, covering what, where, who and when.
  • Corrective Work Order, which covers a repair to fix something that has already failed or degraded.
  • Anything outside KnowMaintain, which belongs in the workspace that owns that process

Standards

What it is built against

ISO 45001Occupational health and safety management systems

The international standard for managing worker health and safety. Certifiable, and the backbone of most of this library.

ISOInternational Organization for Standardization

A voluntary international standard. Widely adopted, often required by customers, and certifiable where a management system standard.

OSHA 1910.147Control of hazardous energy, lockout and tagout

The United States lockout standard. Sets what an energy control procedure must contain, periodic inspection and training.

OSHAOccupational Safety and Health Administration

The United States workplace safety regulator. Its standards are law where they apply.

FAQ

Frequently asked questions

What is the permit linked work record template based on?+

It is built against OSHA 1910.147, ISO 45001 cl.8.1. ISO 45001 is occupational health and safety management systems. The international standard for managing worker health and safety. Certifiable, and the backbone of most of this library. ISO is international Organization for Standardization. A voluntary international standard. Widely adopted, often required by customers, and certifiable where a management system standard.

What sections does the permit linked work record contain?+

There are 4 sections: header, permits held, compliance during work, closure. Together they hold 36 fields, 30 of which are required.

How often is a permit linked work record raised?+

A new record is raised at the moment the event happens, rather than reconstructed afterwards. Each one is given an ID in the form PLW-2026-000, so it can be traced and referenced from other records.

Which programme does the permit linked work record belong to?+

It is part of Planned Maintenance. Planned work completed on time, with backlog age visible rather than aggregated away.

Can the permit linked work record template be changed?+

Yes. Every field, option, score and conditional rule is editable, and the links to other templates come with it. Most teams install it as it is, run it for a cycle, then adjust.

The agents

What the agents do with it

The form is the easy part. Keeping it current, routing it to the right owner and holding the evidence together is the work that actually slips.

KnowMaintain

Holds the permit linked work record library against your registers, routes each record to its owner, and keeps the evidence trail together.

Ella

Coordinates the crew, rolls completion and exceptions into one view, and holds every write for your approval before it touches a record.

This template lives in KnowMaintainasset maintenance. Work orders, planned maintenance, calibration, reliability and shutdowns.

Meet KnowMaintain

Sources

Sources

  • ISO 45001 — Occupational health and safety management systems
  • ISO — International Organization for Standardization
  • OSHA 1910.147 — Control of hazardous energy, lockout and tagout
  • OSHA — Occupational Safety and Health Administration

KnowMaintain

Also in Work Orders

6Browse the whole library
Record

Maintenance Request

Asks maintenance to look at a problem or carry out a job. Raised by anyone who spots something. Completed in under a minute with a photo and location. A work order is raised from it once maintenance accepts and plans the job.

Record

Work Order

The main record for a planned maintenance job, covering what, where, who and when. Raised from a request, a schedule or an inspection finding. Completed by the assigned technician. Captures labour, parts and downtime so cost per asset builds up over time.

Record

Corrective Work Order

Covers a repair to fix something that has already failed or degraded. Raised after a breakdown or a failed inspection. Completed by the technician. Links to the failure record so repair time and repeat failures can be tracked together.

Record

Emergency Work Order

Covers urgent work where equipment has stopped or become unsafe. Raised immediately, with planning done afterwards rather than before. Completed by whoever responds. High emergency work order rates are the clearest sign a maintenance programme is reactive.

Record

Work Order Closeout

Confirms the job is finished, the area is safe and the equipment is fit to run. Completed at the end of every work order. Signed by the technician and the area owner. Captures what was actually found, which is often different from what was reported.

Plan

Job Plan

Sets out the steps, parts, tools, permits and time needed for a repeatable job. Written once per job type and reused. Owned by the maintenance planner. Turns a two hour job into a one hour job by removing the hunting for parts and permits.

Start in Minutes, Not Weeks

Launch a Ready-Made Template and Customize It Your Way

Every template is fully editable. Adjust fields, workflows, and branding to match your processes, then deploy to your team instantly.