Knowella

Pressure System Written Scheme

A written scheme of examination defines what happens before any inspection does: which parts of the system will be examined, by what method, and at what interval. Its recurring failure is not omission but staleness. The scheme is drawn up carefully at commissioning, filed, and never revisited when the plant is modified, so the system that is actually being examined years later no longer matches the one the scheme describes.

KnowSafePlanSAF-16341 fields across 4 sectionsFull researchSee the form

Reviewed by Siddarth SinghCSPLast reviewed 16 August 2026

Basis
ISO 45001 cl.8.1
Workspace
KnowSafe
Form type
Plan
Owner
Engineering, written by a competent person
Review trigger
Any modification to the system, plus the stated interval

The short version

  • A written scheme is a legal precondition for operating most relevant pressure systems, not a piece of supporting documentation. Operating outside one, or against a scheme that has not kept pace with the plant, is a breach regardless of whether the last examination passed.
  • The scheme has to name the parts, the method and the interval for each one. A scheme that lists the vessel but omits its relief valve, gauge or the pipework carrying stored energy has left the part with the least tolerance for error out of scope.
  • The person who writes the scheme should be independent of the people who operate the system it covers. A scheme written from inside operations has an incentive, conscious or not, to set intervals that are convenient rather than defensible.
  • Modification is the trigger that matters more than the calendar date. A system re-piped, re-rated or added to since the scheme was written is no longer the system the scheme describes, whatever the review date says.

What this is

What is a written scheme of examination?

What is a written scheme of examination?

A written scheme of examination is the document that identifies the parts of a pressure system needing periodic examination, specifies the nature and extent of each examination, and sets the interval that must not be exceeded. It is drawn up or certified by a competent person before the system is used, and it is the instrument against which every subsequent examination is judged.

Who can write a pressure system scheme?

A person with the practical and theoretical knowledge to judge what examination a given system needs, and, critically, someone independent of the operation of the system. Independence matters because the scheme sets the standard the operator will later be examined against, and a scheme written by the same function that runs the plant tends to under-specify.

Is a scheme the same thing as an inspection?

No. The scheme is the plan: what to examine, how, and when. The inspection is the event carried out against that plan on a specific vessel, on a specific date, by a specific inspector, producing a pass or fail. A site can have an excellent inspection record sitting on top of a scheme that no longer describes the plant.

Scope

When is a pressure system written scheme required?

This scheme is the governing document for a site's pressure systems. Confusing it with the examination carried out against it, or with the safety checks that sit alongside it for related plant, produces a record that answers the wrong question when someone asks for it.

Use this template when

  • A pressure system is being brought into use and needs its scope, method and intervals defined before the first examination
  • An existing system has been modified in a way that could change what needs examining or how often
  • The scheme is due its own periodic review, independent of any single vessel's examination date
  • A competent person is being appointed or changed and the scheme needs re-certifying against the plant as it stands
  • A linked examination record needs a current scheme to be tested against

Do not use it for

  • Pressure Vessel Inspection, which is the actual examination event carried out against this scheme for one vessel, not the scheme itself
  • Steam System Safety Check, which covers boiler operation, water treatment, blowdown, relief devices and steam trap condition as a routine safety check rather than a statutory scheme
  • Boiler Attendant Log, which records the periodic checks an attendant makes through a shift, not the examination regime
  • Ammonia System Safety Review, which addresses the ammonia-specific safety position rather than the pressure examination scheme
  • Anything outside KnowSafe, which belongs in the workspace that owns that process

Compliance mapping

Which ISO 45001 cl.8.1 requirements does this satisfy?

Most regimes that regulate pressure systems require a written scheme as a precondition of use, and then leave the content of the scheme to the competent person's judgement, which is why the scheme's defensibility rests on its scope rather than its format.

ClauseRequirementWhere it lands
PSSR 2000 reg.8(1)A written scheme of examination must be drawn up, or certified as suitable, by a competent person before the system is usedHeader
PSSR 2000 reg.8(3)The scheme must specify the parts to be examined, the nature and extent of each examination, and the intervalParts covered
PSSR 2000 reg.9Examination must be carried out in accordance with the scheme, at intervals the scheme sets and does not exceedParts covered
PSSR 2000 reg.7Safe operating limits must be established for the system and not exceededScheme quality
ISO 45001 cl.8.1Operational controls established, implemented and maintained for processes needed to meet requirementsSystem scope
PSSR 2000 reg.10Action to be taken on receipt of the examination report, including where imminent danger is identifiedScheme quality
PSSR 2000 reg.13Records of the scheme and examination reports kept and available to those operating the systemScheme quality

What it does not cover

  • Pressure Vessel Inspection, which is the examination event carried out against this scheme for a specific vessel, not the scheme itself.
  • Steam System Safety Check, which checks boiler operation, water treatment, blowdown, relief devices and steam trap condition as an operating safety check.
  • Boiler Attendant Log, which records the periodic checks a boiler attendant makes through a shift, with readings and any action taken.
  • Ammonia System Safety Review, which addresses ammonia-specific containment and detection, not the general examination scheme.
  • Confined space entry permit, which is required separately whenever an internal examination under this scheme needs entry into a vessel.

Global

Pressure System Written Scheme requirements by country

The written scheme is a distinctly regulated instrument in some regimes and an implied consequence of a general management-system duty in others, and that difference decides how much the scheme's content is prescribed.

United Kingdom

Pressure Systems Safety Regulations 2000, regs.7-13

A written scheme is a named legal requirement, drawn up by a competent person, with specified content and examination against it.

Operating a relevant system without a current, adequate scheme is a straightforward offence, independent of whether the system is actually in poor condition.

United States

State boiler and pressure vessel laws, generally incorporating the National Board Inspection Code

No single federal written-scheme requirement; jurisdiction sets the inspection regime, most adopting NBIC in-service inspection intervals and scope.

The functional equivalent of a scheme exists state by state, and the safe answer is to hold one even where the state does not name the document.

International

ISO 45001 cl.8.1

A management-system requirement to establish and maintain operational controls for processes with OH&S risk, without prescribing scheme content.

Certification auditors will ask whether the scheme exists and is followed, not whether it takes a particular form.

How to complete it

How to complete a pressure system written scheme, step by step

The scheme template prompts for a list of parts and intervals. What makes the resulting document defensible is judgement the template cannot force.

Write the scheme against the plant as installed, not as designed

A design drawing and an as-built system diverge the moment site engineering adds a bypass or re-routes a line. The scheme has to describe what is actually there, which means walking the system rather than working from the original specification.

Keep the scheme-writer independent of the people who operate the plant

A scheme written by the operations function has every incentive to set intervals that fit the production schedule rather than the risk. Independence is what the record needs to show, and it is checked directly by this template's own field for it.

State the safe operating limits, not only the examination interval

An interval tells you when to look. A limit tells you what the system must never exceed in the meantime. A scheme with intervals but no stated limits has defined the schedule without defining the boundary the schedule exists to protect.

Treat a modification as an automatic trigger, not an annual footnote

The review date on its own guarantees the scheme is looked at once a year and nothing about whether it still matches the plant. Linking the scheme to the change process, so a re-pipe or a new branch raises the review as part of the change, is what actually keeps it current.

What auditors find

Most common pressure system written scheme findings

A scheme almost always exists somewhere in the file. The findings concern whether it covers the right parts, was written by the right person, and has kept pace with the plant.

FindingClauseWhat fixes it
Scheme does not name the safety devices or state their protective settings.PSSR 2000 reg.7Add every relief device and gauge to the scheme with its stated setting, not only the vessel it protects.
Scheme not reviewed after a plant modification such as re-piping or a new branch.PSSR 2000 reg.8(1)Link the scheme to the change process so a modification raises the review automatically.
Scheme was drawn up or certified by someone not independent of operations.PSSR 2000 reg.8(1)Appoint a competent person independent of the plant's day-to-day operation to write or certify the scheme.
An examination interval in the scheme has been exceeded before the next examination occurred.PSSR 2000 reg.9Restrict use of the affected part immediately and escalate; do not treat an overdue interval as a paperwork gap.
Scheme is not available to the operators of the system it covers.PSSR 2000 reg.13Hold a current copy, or a working summary of parts and intervals, where operators can reach it.
Parts covered list stops at the vessel and omits the pipework and safety devices around it.PSSR 2000 reg.8(3)Extend the scope to every part that stores or releases energy, not only the parts that look like vessels.

Case in point

Case in point: the scheme that only covered the vessel

A dairy site's ammonia plant had a written scheme covering the two ammonia receivers, each examined externally and internally on a defined interval, both passing every examination for six years. The scheme did not mention the relief valves fitted to those receivers, on the reasoning that the valves were part of the vessel and therefore implicitly covered.

A relief valve failed to lift at its set pressure during an unrelated process upset, and the subsequent investigation found the valve had never been tested against a stated interval, because no interval for it existed anywhere in the scheme. The vessels had a flawless examination history and the part that was supposed to protect them had never been examined at all. The corrective action was rewriting the scheme to name every safety device as a separately scheduled part, not a detail assumed inside the vessel's own entry.

The template

The template, field by field

The form exactly as it installs. Every field, option, score and conditional rule is editable, and the links to other templates come with it.

41fields
4 sections
Reference
SAF-163
Archetype
Plan
Record ID
PWS-2026-000
Scoring
Scheme current
Direction
High is good
Singleton
No
Basis
ISO 45001 cl.8.1
Links
Links Vessel inspections, Permits
Tags
Pressure
Sections
4
Fields
41
Follow up fields
3
Repeating sections
1
Links out
4
Field typesOwn ID, generated on saveCase thread and parentPick list from a registryLinked to another templateFollow up, dashed outlineScored

Header

10 fields
Text

Scheme ID*

Generated on save

Auto sequence. Format PWS-2026-000.

The record's own ID. Other templates point at this value.

Single Choice

Status*

Scored

Drives who this goes to next.

  • Planned2 pts
  • In progress2 pts
  • Complete3 pts
  • Deferred0 pts
  • Open0 pts
  • Closed3 pts
  • Overdue0 pts
Text

Version*

Date & Time

Issue Date*

Date & Time

Next Review Due*

Pick List

Site*

From FDN-001 Site NameFilter: Status is Active
Text

Site ID*

Linked

Format SITE-000.

Links to FDN-001 Site ID

Users

Owner*

Users

Approved By*

Info

Operating Without One Is A Breach

A written scheme of examination is a legal requirement for relevant pressure systems. It must be drawn up by a competent person and name the specific parts, methods and intervals.

System scope

6 fields
Text

System Description*

Single Choice

System Type*

Fixed hoodMovable captureBoothDowndraught benchWhole roomProximityLocal exhaustGeneral ventilation
Single Choice

Stored Energy Category

OptionalScored
  • Low3 pts
  • Medium1 pt
  • High0 pts
Text

Scheme Drawn Up By*

Single Choice

Competent Person Verified*

Scored
  • Yes3 pts
  • No0 pts
Single Choice

Independent Of Operations*

Scored
  • Yes3 pts
  • No0 pts

Parts covered

Repeats9 fields
Single Choice

Component*

Vessel, pipework, safety device, gauge, or ancillary.

UprightBeamBracingBaseplateFrameGuardCablePlugConnector
Text

Reference*

Single Choice

Examination Type*

ExternalInternalHydrostaticThickness surveyFunction test
Numeric Answer

Interval Months*

Scored
Single Choice

Preparation Required

Optional

Draining, cleaning, insulation removal and confined space entry all need planning weeks ahead.

NoneDrainingCleaningInsulation removalConfined space entry
Date & Time

Last Examination

Optional
Date & Time

Next Due*

Single Choice

Within Interval*

Scored
  • Yes3 pts
  • Overdue0 pts
Text

Inspection ID

OptionalLinked

Links to MNT-036 Inspection ID

Scheme quality

16 fields
Single Choice

All Relevant Parts Included*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Safety Devices Included*

Scored
  • Yes3 pts
  • No0 pts
Single Choice

Protective Devices Setting Stated*

Scored
  • Yes3 pts
  • No0 pts
Single Choice

Scheme Reviewed After Modification*

Scored
  • Yes3 pts
  • Not needed3 pts
  • No0 pts
Single Choice

Operating Limits Stated*

Scored
  • Yes3 pts
  • No0 pts
Single Choice

Scheme Available To Operators*

Scored
  • Yes3 pts
  • No0 pts
Pick List

Scheme Document

OptionalFrom FDN-008 Document TitleFilter: Status is Current
Text

Document ID

OptionalLinked

Format DOC-0000.

Links to FDN-008 Document ID

Single Choice

Action Required*

Scored

Raise the action record, then enter its reference here.

  • No2 pts
  • Yes0 pts
Single Choice

Priority

OptionalScoredShows if Action Required equals Yes
  • High0 pts
  • Medium1 pt
  • Low3 pts
Text

CAPA ID

OptionalLinkedShows if Action Required equals Yes

Format CAPA-2026-00000.

Links to FDN-014 CAPA ID

Users

Action Owner

OptionalShows if Action Required equals Yes
Users

Competent Person*

Signature

Signature*

Users

Engineering Manager*

Signature

Second Signature*

SAF-163 · record IDs look like PWS-2026-000 · Links Vessel inspections, Permits

Open in Knowella

Run it with agents

From a document you fill in to a programme that runs itself

The scheme is a document. What fails around it is the mechanism that should keep it matched to the plant: the modification that never reached it, and the interval that lapsed unnoticed on a part nobody was watching.

KnowSafe

Holds the scheme against the register of pressure systems and their parts, and flags entries whose subject has been modified since the scheme was last reviewed.

KnowMaintain

Feeds each examination result back against the scheme's stated interval, so an overdue part is visible before it becomes an unexamined one.

KnowContractor

Verifies that the competent person certifying the scheme, and any inspection body examining against it, holds current, checkable accreditation.

Ella
Ella

Watches modification, incident and inspection records for events that should trigger a scheme review, and raises it rather than waiting for the stated date.

This template lives in KnowSafe — safety and compliance. Incidents, hazards, permits, inspections and the critical controls behind them.

Meet KnowSafe→

Glossary

Pressure System Written Scheme definitions and key terms

Written scheme of examination
The document specifying which parts of a pressure system are examined, the method and extent of each examination, and the interval that must not be exceeded.
Competent person
Someone with the practical and theoretical knowledge to draw up or certify a scheme, and, for that role, independent of the system's day-to-day operation.
Safe operating limits
The boundaries, typically pressure and temperature, that the system must not exceed between examinations, set alongside the examination interval rather than instead of it.
Protective device
A relief valve, bursting disc or similar fitting that limits pressure in the system, whose setting must be stated and examined in its own right.
Statutory interval
The maximum period between examinations of a given part, fixed by the scheme and not extendable on the basis of a clean examination history alone.

FAQ

Frequently asked questions about pressure system written scheme

Does the scheme have to be written by someone outside the company?+

Not necessarily outside the company, but independent of the operation of the system. An in-house engineer who does not run the plant can qualify; the person who operates it day to day should not be the one certifying the scheme they will later be examined against.

What must the scheme cover beyond the vessel itself?+

Every part with the potential to fail dangerously: pipework carrying stored energy, protective devices and their settings, and gauges, in addition to the vessels. A scheme that only lists vessels has left out the parts most likely to fail without warning.

What happens if the system is modified after the scheme is written?+

The scheme should be reviewed, because a modification can change what needs examining or how often. A scheme that has not been revisited since a re-pipe or capacity change is describing a system that no longer exists.

Can an examination interval be extended because the last examination found nothing?+

Only if the scheme itself is formally revised to extend it, by the competent person, on stated reasoning. A clean history is evidence to weigh in that revision, not a substitute for it.

Who is responsible if a system is used outside its scheme?+

The duty holder, typically the user or owner of the system, and the breach exists independent of whether the system happens to be in good condition. A scheme is a precondition of use, not a formality that trails behind it.

What is the difference between this scheme and an inspection record?+

The scheme is the plan: what gets examined, how, and how often. The inspection record is the event carried out against that plan for one part on one date. A site can hold a strong inspection record sitting on top of a scheme that has stopped describing the plant.

Keep going

Related templates and programmes

Industries this is written for

Siddarth Singh

Written and reviewed by

Siddarth Singh

Founder & Chief Executive Officer, Knowella

Certified Safety Professional and industrial and systems engineer with more than a decade inside food supply chain, freight and manufacturing operations. This page was written against the current text of the standards it cites, not against secondary summaries of them.

  • Certified Safety Professional (CSP), Board of Certified Safety Professionals
  • MBA, University of Chicago Booth School of Business
  • MS and BS, The Ohio State University, Industrial and Systems Engineering
  • Six Sigma Black Belt
Verify with BCSP →

Sources and last review. Reviewed 16 August 2026 against:

  • Pressure Systems Safety Regulations 2000, regulations 7 to 13 (UK)
  • ISO 45001:2018 clause 8.1, operational planning and control
  • National Board Inspection Code, Part 2, in-service inspection (US)
  • HSE guidance on written schemes of examination for pressure systems

This page is general guidance, not legal advice. Confirm requirements with your jurisdiction’s regulator.