Knowella

Task Redesign Record

A task redesign record documents one specific change made to reduce the ergonomic risk of one specific task: what was changed, what level of the hierarchy of controls it reached, and the assessment score before and after under matching conditions. Its recurring failure is recording the after score under different conditions to the before score, which produces an improvement the numbers cannot actually support.

KnowErgoRecordERG-05248 fields across 5 sectionsFull researchSee the form

Reviewed by Siddarth SinghCSPLast reviewed 16 August 2026

Basis
ISO 11228
Workspace
KnowErgo
Form type
Record
Raised
At the point a redesign is implemented, one record per change
Links
Post control reassessment, design review

The short version

  • This record is per redesign event, not a standing register entry: a new record is raised every time a task is changed to reduce risk, using its own sequential ID.
  • The before and after scores only count as evidence of improvement if taken under the same method and broadly the same conditions; the form has a field for exactly that check.
  • Control level achieved matters as much as the score change. A redesign landing as training only is a different result to one reaching elimination or an engineering control, even at the same score reduction.
  • Worker involvement in the design and a trial before full installation are both scored, because a redesign imposed without either is the pattern that produces a fix nobody actually uses.
  • Still in place at six months is what separates a redesign from a demonstration. A control that scored well on day one and was quietly bypassed by month three has not reduced risk.

What this is

What is a task redesign record?

What is a task redesign record?

A task redesign record documents a specific change made to a specific task to reduce ergonomic risk, together with the original assessment it responds to and the reassessment confirming whether it worked. It holds the before and after evidence for one intervention in one place, not a programme summary.

Who completes it?

Ergonomics, working with engineering, since a redesign reaching an engineering or administrative control usually needs engineering to design, cost and implement it, while ergonomics owns the assessment evidence either side.

Why does the before-and-after pairing matter so much?

A reduction in score only demonstrates that a control worked if both scores were taken under the same method and broadly the same conditions. A before score under load and an after score under a lighter or different task is not evidence of improvement, whatever the numbers say.

Scope

When is a task redesign record required?

This record documents the change itself and the two assessments either side of it. It is not the place to conduct the original assessment or the follow-up reassessment; both of those are separate records this one links to.

Use this template when

  • A specific task has been redesigned, an engineering change, a new aid, a workstation modification, an administrative change, to reduce its assessed risk
  • An original assessment already exists and identified a problem this redesign responds to
  • The change is significant enough to warrant its own before-and-after evidence, rather than a note on the original assessment
  • A reassessment has been or will be carried out, and its result needs pairing with the original score
  • A linked record needs this one to exist: post control reassessment or a design review depend on the redesign being on file

Do not use it for

  • Task Ergonomic Assessment, which is the original assessment this record responds to, not the change made from it
  • Post Control Reassessment, which is the reassessment record itself; this record links to it rather than repeating its content
  • Cumulative Exposure Assessment, which assesses total load across a shift, not one task's redesign
  • Work Rest Cycle Assessment, which addresses recovery time, not a design change to the task
  • Ergonomic Cost Benefit Record, which weighs the redesign's cost against the injury and productivity cost avoided, a separate financial case built on this record's evidence

Compliance mapping

Which ISO 11228 requirements does this satisfy?

ISO 11228 supplies the assessment methods either side of the redesign; it does not itself specify how a redesign should be recorded. This record exists to hold the two assessments and the change between them to a standard the methods imply but do not name.

ClauseRequirementWhere it lands
ISO 11228-1Manual lifting and carrying assessed by a recognised method, providing the comparable score either side of the changeBefore
ISO 11228-2Pushing and pulling assessed by a recognised method where the task involves itBefore
ISO 11228-3Repetitive handling of low loads assessed by a recognised method where relevantBefore
ISO 45001 cl.8.1.2Elimination and substitution prioritised over administrative controls and PPE in the hierarchy of controlsWhat changed
ISO 45001 cl.5.4Consultation and participation of workers in the design of the controlWhat changed
ISO 45001 cl.9.1.1Monitoring and measurement of the effectiveness of implemented controlsAfter
ISO 45001 cl.10.2Corrective action where the redesign introduces new risk or does not holdAfter

What it does not cover

  • Task Ergonomic Assessment, which is the original assessment, carried out before any redesign is proposed.
  • Post Control Reassessment, which formally reassesses a task after a control change and is linked from, not duplicated by, this record.
  • Cumulative Exposure Assessment, which totals physical load across a whole shift including rotation and overtime.
  • Work Rest Cycle Assessment, which assesses whether recovery time is adequate for the load, not whether the task itself was changed.
  • Ergonomic Cost Benefit Record, which builds the financial case on top of this record's evidence rather than replacing it.

Global

Task Redesign Record requirements by country

No jurisdiction requires a task redesign record by name. What differs is how strongly the underlying manual handling method is prescribed, which determines how far the before-and-after comparison here can be relied on.

International

ISO 11228 parts 1 to 3

Defines recognised methods for lifting, pushing and pulling, and repetitive low-load handling.

Using the same ISO 11228 method for both scores is what makes the comparison in this record meaningful.

United Kingdom

Manual Handling Operations Regulations 1992, and HSE manual handling assessment charts

Requires avoidance, assessment and reduction of risk from manual handling so far as reasonably practicable.

A control level below engineering with no explanation invites the question of whether reduction went as far as reasonably practicable required.

United States

OSH Act General Duty Clause; NIOSH revised lifting equation as the recognised method

No specific manual handling standard, but recognised ergonomic hazards fall under the General Duty Clause.

A documented redesign with a matched before-and-after NIOSH-based score supports a General Duty Clause defence.

How to complete it

How to complete a task redesign record, step by step

The form prompts for the change and the two scores. The judgement that makes the record useful is whether the comparison between them is valid.

Confirm the method matches before trusting the score change

If the original assessment used a different method to the reassessment, the score reduction percentage is not comparable, whatever the form calculates. Note the method used both times and flag any mismatch rather than letting the percentage stand unexplained.

Record the control level honestly, not the level intended

A redesign planned as an engineering control that shipped as an administrative workaround because of cost or schedule should be recorded as what was actually implemented, not what was originally proposed. The gap between the two is itself worth capturing in the description.

Treat the trial-and-adjust fields as evidence of process, not paperwork

A redesign trialled before full install and adjusted afterwards is more likely to still be in place at six months than one installed directly. Recording that a trial happened without recording what the trial changed misses the reason it matters.

Follow up at six months even when the record feels closed

The still-in-place-at-six-months field is often left blank because the record was completed and filed at implementation. A redesign that has quietly reverted by month four is the pattern this field exists to catch, and it only catches it if someone returns to fill it in.

What auditors find

Most common task redesign record findings

The redesign itself is usually genuine. The findings concern whether the record proves it worked, and whether it held.

FindingClauseWhat fixes it
Before and after scores taken under different methods or conditions with no note explaining the difference.ISO 11228Record the method and conditions for both assessments, and flag any mismatch rather than letting the reduction percentage stand alone.
Control level achieved not stated, or overstated relative to what was actually installed.ISO 45001 cl.8.1.2Record the control level as implemented, distinct from what was originally proposed.
No trial before full installation, and no explanation of why a trial was skipped.ISO 45001 cl.5.4Trial where practicable; where not, record why and what compensating check was used instead.
Still in place at six months left blank on a record marked complete.ISO 45001 cl.9.1.1Schedule the six-month follow-up as its own task at implementation, not an afterthought to the record.
New risk introduced by the redesign not assessed or recorded.ISO 45001 cl.10.2Check for new risk explicitly as part of the after assessment, not only the score on the original hazard.
Transferable redesign not linked to a design review or applied to comparable workstations.Standard-specificWhere marked transferable, raise the design review link so the improvement reaches other workstations rather than staying local.

Case in point

Case in point: an improvement that did not survive contact with six months

A packing line redesigned a repetitive taping task, replacing a handheld tool with a fixture-mounted one to remove sustained wrist deviation. The before assessment scored the task high risk; the after assessment, taken the week the fixture went in, scored it low, and the record was closed with the score reduction cited in that quarter's ergonomics reporting.

At the six-month check, still in place had not been asked, because the record was already marked complete. An unrelated visit later found operators had removed the fixture on the busiest shift, because it slowed the task when volumes spiked, and were back on the handheld tool at those times. The reduction had been real on the day measured and had not held under production pressure, and nothing in the record would have surfaced that without the six-month field being followed up.

The template

The template, field by field

The form exactly as it installs. Every field, option, score and conditional rule is editable, and the links to other templates come with it.

48fields
5 sections
Reference
ERG-052
Archetype
Record
Record ID
TRD-2026-000
Scoring
Score improvement
Direction
High is good
Singleton
Yes
Basis
ISO 11228
Links
Links Post control reassessment, Design review
Tags
Ergo, Redesign
Sections
5
Fields
48
Follow up fields
3
Repeating sections
0
Links out
6
Field typesOwn ID, generated on saveCase thread and parentPick list from a registryLinked to another templateFollow up, dashed outlineScored

Header

14 fields
Text

Record ID*

Generated on save

Auto sequence. Format TRD-2026-000.

The record's own ID. Other templates point at this value.

Single Choice

Status*

Scored

Drives who this goes to next.

  • Planned2 pts
  • In progress2 pts
  • Complete3 pts
  • Deferred0 pts
  • Open0 pts
  • Closed3 pts
  • Overdue0 pts
Date & Time

Date and Time*

Users

Completed By*

Pick List

Site*

From FDN-001 Site NameFilter: Status is Active
Text

Site ID*

Linked

Format SITE-000.

Links to FDN-001 Site ID

Single Choice

Area

Optional

The area within the site.

Cutting roomBoning hallPackingChill storeFreezerPasteurisingFillingCulture roomDespatchYardWorkshopPlant roomOffices
Location

Exact Location

Optional

Drop a pin for anything hard to find.

Pick List

Task*

From FDN-004 Task Name
Text

Job ID*

Linked

Format JOB-000.

Links to FDN-004 Job Task ID

Info

Before And After In One Place

The evidence that a control worked is a pair of scores under the same conditions. Keeping them together is what makes the next business case easy.

Text

Redesign Description*

Users

Owner*

Single Choice

Source*

Internal auditExternal auditRegulatorCustomer auditInspectionSelf identifiedManagement reviewIncident

Before

6 fields
Text

Original Assessment ID*

Linked

Links to ERG-006 Assessment ID

Single Choice

Original Method*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Numeric Answer

Original Score*

Single Choice

Original Risk Band*

LowMediumHighVery high
Numeric Answer

Discomfort Reports Before

Optional
Single Choice

Main Problem*

ForceRepetitionPostureStatic holdingReachContact stressVibration

What changed

7 fields
Text

Change Made*

Single Choice

Control Level Achieved*

Scored
  • Eliminated4 pts
  • Engineering3 pts
  • Aid provided3 pts
  • Administrative1 pt
  • Training only0 pts
Numeric Answer

Cost

Optional
Single Choice

Workers Involved In Design*

Scored
  • Yes3 pts
  • Consulted2 pts
  • No0 pts
Single Choice

Trialled Before Full Install*

Scored
  • Yes3 pts
  • No1 pt
Single Choice

Adjusted After Trial

OptionalScored
  • Yes3 pts
  • Not needed3 pts
Date & Time

Implemented Date*

Related records

1 field
Text

Cumulative Exposure ID

OptionalLinked

Where the redesign addresses a cumulative load.

Links to ERG-049 Assessment ID

After

20 fields
Text

Reassessment ID

OptionalLinked

Links to ERG-014 Assessment ID

Numeric Answer

New Score*

Scored
Numeric Answer

Score Reduction Percent*

Scored
Single Choice

New Risk Band*

Scored
  • Low3 pts
  • Medium2 pts
  • High1 pt
  • Very high0 pts
Single Choice

Same Method And Conditions*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Workers Report Improvement*

Scored
  • Yes3 pts
  • Some1 pt
  • No0 pts
Numeric Answer

Discomfort Reports After*

Scored
Single Choice

Any New Risk Introduced*

Scored
  • No3 pts
  • Some1 pt
  • Significant0 pts
Single Choice

Still In Place At Six Months

OptionalScored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Transferable To Other Workstations*

Scored
  • Yes3 pts
  • No1 pt
Single Choice

Applied Elsewhere

Optional
YesPlannedNo
Checkbox

Feeds Effectiveness Review*

Single Choice

Action Required*

Scored

Raise the action record, then enter its reference here.

  • No2 pts
  • Yes0 pts
Single Choice

Priority

OptionalScoredShows if Action Required equals Yes
  • High0 pts
  • Medium1 pt
  • Low3 pts
Text

CAPA ID

OptionalLinkedShows if Action Required equals Yes

Format CAPA-2026-00000.

Links to FDN-014 CAPA ID

Users

Action Owner

OptionalShows if Action Required equals Yes
Users

Ergonomics*

Signature

Signature*

Users

Engineering*

Signature

Second Signature*

ERG-052 · record IDs look like TRD-2026-000 · Links Post control reassessment, Design review

Open in Knowella

Run it with agents

From a document you fill in to a programme that runs itself

The redesign is a physical or procedural change. What the record depends on is the comparison holding up and someone returning at six months to check.

KnowErgo

Pairs each redesign record with its original assessment and reassessment, and flags a same-method-and-conditions mismatch before the score reduction is reported.

KnowTrain

Turns an administrative control level into a defined competency requirement, so training only is a stated choice, not a default.

KnowSafe

Schedules the six-month still-in-place check as its own task at implementation and escalates it if unanswered.

Ella
Ella

Watches for a transferable redesign with no design review raised, and a record left open past its six-month check, before either goes unnoticed.

This template lives in KnowErgo — ergonomics. Task assessment, video posture analysis, rotation and workstation redesign.

Meet KnowErgo→

Glossary

Task Redesign Record definitions and key terms

Same method and conditions
The check that the before and after assessment used the same recognised method under comparable task conditions, without which a score reduction is not a valid comparison.
Control level achieved
Where the implemented change sits in the hierarchy of controls, from elimination down to training only, scored independently of how much the risk score itself moved.
Hierarchy of controls
The ranked sequence of control types, elimination, substitution, engineering, administrative, then personal protective equipment, used here to judge the redesign's durability, not just its score.
Score reduction percentage
The measured change between the original and new assessment score, valid only where both were taken under the same method and comparable conditions.
Transferable
Whether the redesign could reasonably be applied to other workstations doing comparable work, distinct from whether it has actually been applied elsewhere yet.

FAQ

Frequently asked questions about task redesign record

Is this one record covering the whole redesign programme, or one per change?+

One per change. Each specific redesign of a specific task gets its own record, sequentially numbered, pairing that task's before and after evidence. It does not summarise the programme; the annual ergonomics review does that.

What if the reassessment hasn't happened yet?+

The after fields are required once the reassessment exists; the record can be raised at implementation with the before evidence and change description in place, then completed once the reassessment ID and score are available.

Does the redesign have to reach an engineering control to count?+

No, but the control level field records honestly wherever it lands. A redesign that lands as an administrative control still gets recorded, and the level achieved is what lets someone later judge whether a stronger control should be pursued.

Who needs to sign this record?+

Ergonomics and engineering both, reflecting that the assessment evidence and the physical or procedural change are two different kinds of accountability that both need to stand behind the result.

What does transferable actually unlock?+

It flags the redesign for a design review, so a fix proven on one workstation is considered for comparable ones rather than being reinvented, or missed, elsewhere.

Why does the record ask about new risk introduced?+

Because a redesign that removes one hazard can introduce another, a fixture that reduces reach but creates a pinch point, for instance, and a record that only tracks the original score would miss it entirely.

Keep going

Related templates and programmes

Siddarth Singh

Written and reviewed by

Siddarth Singh

Founder & Chief Executive Officer, Knowella

Certified Safety Professional and industrial and systems engineer with more than a decade inside food supply chain, freight and manufacturing operations. This page was written against the current text of the standards it cites, not against secondary summaries of them.

  • Certified Safety Professional (CSP), Board of Certified Safety Professionals
  • MBA, University of Chicago Booth School of Business
  • MS and BS, The Ohio State University, Industrial and Systems Engineering
  • Six Sigma Black Belt
Verify with BCSP →

Sources and last review. Reviewed 16 August 2026 against:

  • ISO 11228 parts 1-3 — Ergonomics: manual handling
  • ISO 45001:2018 clauses 8.1.2, 5.4, 9.1.1 and 10.2
  • Manual Handling Operations Regulations 1992 and HSE manual handling assessment charts (GB)
  • OSH Act Section 5(a)(1), General Duty Clause, and the NIOSH revised lifting equation (US)

This page is general guidance, not legal advice. Confirm requirements with your jurisdiction’s regulator.

Start in Minutes, Not Weeks

Launch a Ready-Made Template and Customize It Your Way

Every template is fully editable. Adjust fields, workflows, and branding to match your processes, then deploy to your team instantly.