Knowella

Electrical Panel Inspection

Checks panels for damage, heat, moisture ingress, labelling, clearance and unauthorised modification. Run quarterly. Completed by maintenance. Panels in wash down areas fail on moisture and sealing long before they fail electrically.

KnowSafeInspectionSAF-161
Completed by
maintenance
Raised
On the inspection frequency set in your programme, and aga

Summary

In short

  • An electrical panel inspection is an inspection used in KnowSafe that checks panels for damage, heat, moisture ingress, labelling, clearance and unauthorised modification. It is built against ISO 45001 cl.8.1 and forms part of the Electrical Safety and Arc Flash programme.
  • Run quarterly. Completed by maintenance.
  • The template holds 54 fields across 6 sections, with findings repeating for each entry.
  • Scoring is pass rate, where high is good.
  • ISO 45001 is occupational health and safety management systems. The international standard for managing worker health and safety. Certifiable, and the backbone of most of this library.
  • It connects to the rest of the library: links Thermography, Work orders.

What it is

What it is

What is an electrical panel inspection?

An electrical panel inspection is an inspection used in KnowSafe that checks panels for damage, heat, moisture ingress, labelling, clearance and unauthorised modification. It is built against ISO 45001 cl.8.1 and forms part of the Electrical Safety and Arc Flash programme.

When is an electrical panel inspection completed?

An electrical panel inspection is completed on the inspection frequency set in your programme, and again after any change to the asset or area. Run quarterly.

When to use it

When to use it, and when not to

This inspection is one step in a larger programme. Using it for work that belongs to a neighbouring template produces records that are hard to report on later.

Use it for

  • The event or activity this inspection covers has occurred, or is about to
  • The workspace is being set up, or the register needs an entry added or retired
  • You are running the Electrical Safety and Arc Flash programme and this is one of its steps
  • A linked record needs this one to exist: links thermography, work orders

Not for

  • Electrical Safety Risk Assessment, which assesses shock, arc flash and burn risk from work on or near electrical systems.
  • Arc Flash Study Record, which records the incident energy calculation at each panel and the resulting boundary and PPE category.
  • Live Working Justification Record, which records why work is being carried out live rather than dead, and who accepted that decision.
  • Anything outside KnowSafe, which belongs in the workspace that owns that process

Standards

What it is built against

ISO 45001Occupational health and safety management systems

The international standard for managing worker health and safety. Certifiable, and the backbone of most of this library.

ISOInternational Organization for Standardization

A voluntary international standard. Widely adopted, often required by customers, and certifiable where a management system standard.

FAQ

Frequently asked questions

What is the electrical panel inspection template based on?+

It is built against ISO 45001 cl.8.1. ISO 45001 is occupational health and safety management systems. The international standard for managing worker health and safety. Certifiable, and the backbone of most of this library. ISO is international Organization for Standardization. A voluntary international standard. Widely adopted, often required by customers, and certifiable where a management system standard.

What sections does the electrical panel inspection contain?+

There are 6 sections: header, enclosure, internal condition, labelling and access, findings, result. Together they hold 54 fields, 39 of which are required.

How many electrical panel inspection records should we have?+

This is a singleton. One record per workspace, set up once and maintained, rather than one per event. Other templates refer back to it.

Which programme does the electrical panel inspection belong to?+

It is part of Electrical Safety and Arc Flash. An arc flash study with current labels, authorised persons on record and live work justified in writing.

How is an electrical panel inspection scored?+

Scoring is pass rate. High is good. Scores exist to make the form tell you something, not to produce a percentage for its own sake.

Can the electrical panel inspection template be changed?+

Yes. Every field, option, score and conditional rule is editable, and the links to other templates come with it. Most teams install it as it is, run it for a cycle, then adjust.

The agents

What the agents do with it

The form is the easy part. Keeping it current, routing it to the right owner and holding the evidence together is the work that actually slips.

KnowSafe

Holds the electrical panel inspection library against your registers, routes each record to its owner, and keeps the evidence trail together.

Ella

Coordinates the crew, rolls completion and exceptions into one view, and holds every write for your approval before it touches a record.

This template lives in KnowSafesafety and compliance. Incidents, hazards, permits, inspections and the critical controls behind them.

Meet KnowSafe

Sources

Sources

  • ISO 45001 — Occupational health and safety management systems
  • ISO — International Organization for Standardization

KnowSafe

Also in Electrical Safety

6Browse the whole library
Assessment

Electrical Safety Risk Assessment

Assesses shock, arc flash and burn risk from work on or near electrical systems. Carried out per system and reviewed after modification. Completed by a competent electrical person. Arc flash energy determines the PPE, and most sites have never calculated it.

Assessment

Arc Flash Study Record

Records the incident energy calculation at each panel and the resulting boundary and PPE category. Carried out on installation and after system change. Completed by an electrical engineer. Labels on panels are only as good as the study behind them.

Record

Live Working Justification Record

Records why work is being carried out live rather than dead, and who accepted that decision. Raised before any live work. Approved at manager level. Convenience and production pressure are not justifications, and writing that down is the point.

Record

Portable Appliance Test Record

Records inspection and testing of portable electrical equipment, with the result and next due date. Run at the interval set by risk. Completed by a competent tester. In wash down areas the interval is far shorter than the office default.

Inspection

Fixed Installation Inspection

Records periodic inspection and testing of the fixed electrical installation, with observations classified by urgency. Run at the statutory interval. Carried out by a competent contractor. Classification codes drive what must be fixed immediately rather than at leisure.

Record

Electrical Competency Authorisation

Authorises a named person to carry out defined electrical activities on this site, with the limits stated. Issued after qualification and site familiarisation. Signed by the engineering manager. A trade qualification is not the same as authorisation on your system.

Start in Minutes, Not Weeks

Launch a Ready-Made Template and Customize It Your Way

Every template is fully editable. Adjust fields, workflows, and branding to match your processes, then deploy to your team instantly.