Electrical Safety Risk Assessment Template

Electrical risk assessment has an unusual property: the correct answer is almost always to de-energize, and the assessment exists mainly to test whether the narrow grounds for not doing so actually apply. Where the justification is production schedule or convenience, the assessment has already reached its conclusion.

KnowSafeAssessmentSAF-156Pinned in navigation48 fields across 4 sectionsFull researchSee the form

Reviewed by Siddarth SinghCSPLast reviewed 16 August 2026

Basis
ISO 45001 cl.6.1.2
Workspace
KnowSafe
Form type
Assessment
Default
De-energize
Justification
Additional hazard or infeasible by design

The short version

  • De-energizing is the default and the exceptions are narrower than most teams assume. The assessment's main function is to test the justification.
  • NFPA 70E is a consensus standard rather than a regulation, and it is how employers demonstrate compliance with OSHA's general electrical safety duties.
  • Incident energy depends on how quickly the protective device clears the fault, which depends on whether the device has been maintained. NFPA 70E requires equipment to be properly maintained before energized work.
  • NFPA 70B became a Standard rather than a Recommended Practice in 2023, making documented electrical maintenance programmes an enforceable expectation rather than good practice.
  • Qualified person status is task and equipment specific. Someone qualified on 480V motor control is not thereby qualified on medium voltage switchgear.
  • An arc flash label calculated against a superseded network configuration is more dangerous than no label, because it will be relied upon.

What this is

What is an electrical safety risk assessment?

What is an electrical safety risk assessment?

An assessment of shock and arc flash hazards for a specific task on specific equipment, establishing whether work can be performed de-energized, and where it cannot, determining the boundaries, the incident energy, the protective equipment and the qualification required of the person performing it.

When is energized work permitted?

Under 29 CFR 1910.333, when de-energizing introduces additional or increased hazards, or is infeasible due to equipment design or operational limitations. Testing, troubleshooting and diagnostics generally qualify. Production schedule, cost and inconvenience do not, and a justification citing them will not survive examination after an incident.

Scope

When is an electrical safety risk assessment required?

This assessment covers a task on electrical equipment. Several adjacent activities have their own records.

Use this template when

  • Any task involving exposure to energized electrical conductors or circuit parts
  • Determining whether work can be performed de-energized and, where not, justifying the exception
  • Establishing shock and arc flash boundaries and required protective equipment for a task
  • Assessing qualification requirements for the specific equipment and voltage
  • After a network change, protective device replacement or supply alteration affecting fault current

Do not use it for

  • The arc flash study, which is an engineering analysis producing incident energy values across the installation
  • The energized work permit, which authorises a specific task once this assessment has justified it
  • Machine-specific energy control procedures, which cover isolation for servicing
  • Electrical safety inspection, which examines condition rather than assessing a task
  • Qualified person training records, which evidence the competence this assessment requires

Compliance mapping

Which ISO 45001 cl.6.1.2 requirements does this satisfy?

Electrical safety combines an OSHA work practice standard with a consensus standard that supplies the method.

ClauseRequirementWhere it lands
29 CFR 1910.333(a)Safety-related work practices to prevent electric shock, with de-energizing as the defaultHazards
29 CFR 1910.333(a)(1)Energized work only where de-energizing introduces additional hazards or is infeasible by designControls
29 CFR 1910.332Training for qualified and unqualified persons, defined by task and equipmentControls
29 CFR 1910.269Power generation, transmission and distribution work, including host and contractor information exchangeHeader
NFPA 70E 110.5Risk assessment procedure identifying hazards, estimating likelihood and severity, and determining controlsHazards
NFPA 70E 130.5Arc flash risk assessment, incident energy analysis and labelling, reviewed on changeControls
NFPA 70E 205.3Equipment maintained in accordance with manufacturer instructions or consensus standardsControls
NFPA 70B (2023 Standard)Documented electrical maintenance programme with intervals from equipment condition assessmentControls

What it does not cover

  • The arc flash study, which is engineering analysis across the installation and is triggered by system change.
  • The energized work permit, which authorises the task once this assessment has justified it.
  • Machine-specific energy control procedures, which cover isolation for servicing rather than energized work.
  • Electrical safety inspection, which examines the condition of installations and portable equipment.
  • Qualified person determination records, which evidence competence per task and equipment class.

How to complete it

How to complete an electrical safety risk assessment, step by step

The assessment turns on one decision and three supporting facts.

Test the justification for energized work first

Record why de-energizing would introduce additional or increased hazards, or why it is infeasible due to equipment design or operational limitation. If the reason written down is that the line cannot stop, the assessment has established that the work should not proceed energized rather than justifying it.

Check the arc flash data against the current configuration

Incident energy values depend on available fault current and protective device operation, both of which change with transformer changes, new feeders, device replacements and utility supply alterations. Confirm the study post-dates the last such change rather than assuming the label is current.

Confirm the protective device has been maintained

Incident energy assumes the device clears within its expected time. Where maintenance history is absent, the calculated value understates the exposure. This connects the assessment directly to the maintenance record and is the link most often missing.

Establish qualification for this equipment and this task

Qualified is not a general designation. Record what the person is qualified for, on what basis, and whether it covers the voltage class and equipment type in front of them. For contractors, verify rather than accept, and complete the host and contract employer information exchange in both directions.

What auditors find

Most common electrical safety risk assessment findings

Electrical assessment findings concentrate on justification and on data currency.

FindingClauseWhat fixes it
Energized work justified by production schedule or convenience.1910.333(a)(1)Neither is an accepted ground; the assessment should conclude the work waits.
Arc flash study predating a network or protective device change.NFPA 70E 130.5Trigger review on any change affecting fault current or device operation.
Incident energy relied on with no maintenance history for the protective device.NFPA 70E 205.3Link the maintenance record; an unmaintained device may not clear as modelled.
Qualified person status treated as a general designation.1910.332Record qualification per task and equipment class; voltage classes are not interchangeable.
No host and contract employer information exchange for contractor electrical work.1910.269(a)(3)Exchange in both directions and record it; the requirement is explicit.
Boundaries not established or not communicated at the point of work.NFPA 70E 130.4Establish and mark the approach and arc flash boundaries for the task.
Labels present but not matching the current system.NFPA 70E 130.5Relabel on change; a wrong label is more dangerous than a missing one.
Assessment not repeated when the task or equipment differs.NFPA 70E 110.5Assess per task and equipment; a generic electrical assessment covers neither.
Electrical maintenance programme undocumented.NFPA 70B 2023Document it; NFPA 70B became a Standard with mandatory language in 2023.
Energized work permits issued routinely without trending.NFPA 70E 130.2Trend them; every permit is also a design defect report and the count should fall.

Case in point

Case in point: the label that was right in 2016

A plant carried arc flash labels across its distribution, applied after an incident energy study. The labels were legible, the PPE categories were understood, and electricians selected protection from them. The programme looked mature.

In the intervening years the site had added a second transformer to support an expansion, replaced two main breakers with a different frame size, and taken a revised supply configuration from the utility. Each change altered available fault current or protective device operation. None triggered a review of the study.

The labels described a network that had not existed for several years. Because they were present and legible, they were trusted, and the PPE selected from them was chosen for an incident energy value that no longer applied.

The template

The template, field by field

The form exactly as it installs. Every field, option, score and conditional rule is editable, and the links to other templates come with it.

48fields
4 sections
Reference
SAF-156
Archetype
Assessment
Record ID
ESA-2026-000
Scoring
Residual band
Direction
Low is good
Singleton
Yes
Basis
ISO 45001 cl.6.1.2
Links
Links Permits, Arc flash study
Tags
Electrical
Sections
4
Fields
48
Follow up fields
3
Repeating sections
0
Links out
5
Field typesOwn ID, generated on saveCase thread and parentPick list from a registryLinked to another templateFollow up, dashed outlineScored

Header

12 fields
Text

Assessment ID*

Generated on save

Auto sequence. Format ESA-2026-000.

The record's own ID. Other templates point at this value.

Single Choice

Status*

Scored

Drives who this goes to next.

  • Planned2 pts
  • In progress2 pts
  • Complete3 pts
  • Deferred0 pts
  • Open0 pts
  • Closed3 pts
  • Overdue0 pts
Date & Time

Date and Time*

Users

Completed By*

Pick List

Site*

From FDN-001 Site NameFilter: Status is Active
Text

Site ID*

Linked

Format SITE-000.

Links to FDN-001 Site ID

Single Choice

Area

Optional

The area within the site.

Cutting roomBoning hallPackingChill storeFreezerPasteurisingFillingCulture roomDespatchYardWorkshopPlant roomOffices
Location

Exact Location

Optional

Drop a pin for anything hard to find.

Info

Shock Is Not The Only Hazard

Arc flash releases enough energy to cause fatal burns without contact. Most sites assess shock, control it with isolation, and have never calculated the incident energy.

Text

System Or Panel Assessed*

Single Choice

Voltage Level*

Scored
  • Extra low4 pts
  • Low voltage2 pts
  • High voltage0 pts
Single Choice

Assessor Competent*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts

Hazards

9 fields
Single Choice

Shock Risk*

Scored
  • Low3 pts
  • Medium1 pt
  • High0 pts
Single Choice

Arc Flash Risk*

Scored
  • Low3 pts
  • Medium1 pt
  • High0 pts
Single Choice

Burn Or Blast Risk*

Scored
  • Not credible4 pts
  • Low3 pts
  • Medium1 pt
  • High0 pts
Single Choice

Stored Energy Present*

Scored

Capacitors and drives hold a charge after isolation. Discharge time must be known and respected.

  • No3 pts
  • Yes1 pt
Single Choice

Backfeed Possible*

Scored
  • No3 pts
  • Yes0 pts
Single Choice

Multiple Supplies*

Scored
  • No3 pts
  • Yes0 pts
Single Choice

Wet Or Wash Down Environment*

Scored
  • No3 pts
  • Sometimes1 pt
  • Routinely0 pts
Single Choice

Conductive Location

OptionalScored
  • No3 pts
  • Yes0 pts
Single Choice

Confined Working Position

OptionalScored
  • No3 pts
  • Yes0 pts

Controls

12 fields
Single Choice

Isolation Points Identified And Labelled*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Text

Procedure ID

OptionalLinked

Links to MNT-055 Procedure ID

Single Choice

Panel Enclosure Rating Adequate*

Scored
  • Yes3 pts
  • Marginal1 pt
  • No0 pts
Single Choice

Arc Flash Study Completed*

Scored
  • Yes3 pts
  • Partial1 pt
  • No0 pts
Text

Study ID

OptionalLinked

Links to SAF-157 Study ID

Single Choice

Labels Present And Current*

Scored
  • Yes3 pts
  • Present, out of date1 pt
  • None0 pts
Single Choice

PPE Category Specified*

Scored
  • Yes3 pts
  • No0 pts
Single Choice

PPE Available On Site*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Only Authorised Persons Have Access*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Test Equipment Rated For The Duty*

Scored

A meter of the wrong category can fail explosively on a high energy system.

  • Yes3 pts
  • Uncertain1 pt
  • No0 pts
Single Choice

Two Person Working Where Required*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Rescue And First Aid Arrangements*

Scored
  • Yes, with insulated equipment3 pts
  • First aid only1 pt
  • None0 pts

Outcome

15 fields
Single Choice

Highest Control Level Applied*

Scored
  • Eliminate4 pts
  • Substitute4 pts
  • Engineer3 pts
  • Separate or isolate3 pts
  • Administrative1 pt
  • PPE0 pts
Single Choice

Residual Band*

Scored
  • Low, 1 to 45 pts
  • Medium, 5 to 94 pts
  • High, 10 to 142 pts
  • Very high, 15 to 191 pt
  • Extreme, 20 to 250 pts
Single Choice

Risk Acceptable*

Scored
  • Yes3 pts
  • Marginal1 pt
  • No0 pts
Text

Further Controls Required

Optional
Pick List

Risk Assessment

OptionalFrom FDN-012 Risk Title
Text

Risk ID

OptionalLinked

Format RSK-2026-00000.

Links to FDN-012 Risk ID

Single Choice

Action Required*

Scored

Raise the action record, then enter its reference here.

  • No2 pts
  • Yes0 pts
Single Choice

Priority

OptionalScoredShows if Action Required equals Yes
  • High0 pts
  • Medium1 pt
  • Low3 pts
Text

CAPA ID

OptionalLinkedShows if Action Required equals Yes

Format CAPA-2026-00000.

Links to FDN-014 CAPA ID

Users

Action Owner

OptionalShows if Action Required equals Yes
Date & Time

Next Review Due*

Users

Assessor*

Signature

Signature*

Users

Engineering Manager*

Signature

Second Signature*

SAF-156 · record IDs look like ESA-2026-000 · Links Permits, Arc flash study

Open in Knowella

Run it with agents

From a document you fill in to a programme that runs itself

The assessment turns on a justification and three facts. What fails is the study that predates the network and the maintenance record nobody linked.

KnowSafe

Holds the assessment per task and equipment, tests the energized work justification against the accepted grounds, and issues permits only where it holds.

KnowMaintain

Links protective device maintenance history to the incident energy assumption, and flags system changes that should trigger study review.

Ella
Ella

Trends energized work permits, since a flat count indicates nothing is being designed out and each permit is also a design defect report.

KnowTrain

Records qualified person scope per equipment class and voltage rather than as a general designation, including for contractors.

This template lives in KnowSafe — safety and compliance. Incidents, hazards, permits, inspections and the critical controls behind them.

Meet KnowSafe→

Glossary

Electrical Safety Risk Assessment definitions and key terms

Incident energy
The thermal energy an arc flash would deliver at a working distance, determining the PPE category required.
Arc flash boundary
The distance at which incident energy equals the threshold for a second-degree burn, marking where protection is required.
Limited approach boundary
The distance from an exposed energized conductor within which a shock hazard exists for unqualified persons.
Qualified person
Someone with training and demonstrated skills to recognise and avoid the hazards for the specific equipment and task.
Energized work permit
Authorisation for work on energized parts, issued only where the narrow justification grounds are met.
Available fault current
The current that would flow in a fault, determined by the supply and system impedance and central to incident energy.
Protective device clearing time
How quickly a breaker or fuse interrupts a fault, which depends on maintenance and directly affects incident energy.
Electrical maintenance programme
The documented programme required by NFPA 70B since it became a Standard in 2023.

FAQ

Frequently asked questions about electrical safety risk assessment

When can we work energized?+

When de-energizing would introduce additional or increased hazards, or is infeasible due to equipment design or operational limitations. Testing, troubleshooting and diagnostics generally qualify. Production schedule, cost and inconvenience do not. If the justification recorded is that the line cannot stop, the assessment has concluded the work should wait rather than proceed.

Why does maintenance affect the arc flash assessment?+

Because incident energy assumes the protective device clears the fault within its expected time. A breaker never tested or maintained may operate slowly or fail to operate, in which case the energy released exceeds the calculated value and the PPE selected from the label is inadequate. NFPA 70E requires equipment to be maintained, and NFPA 70B became a Standard with mandatory language in 2023.

How often should the arc flash study be reviewed?+

Whenever anything changes that affects available fault current or protective device operation: a transformer addition, a new feeder, a device replacement, a utility supply change. Also on a periodic cycle, because such changes accumulate without anyone flagging them as electrically significant. A label from a superseded configuration is trusted and wrong.

Is NFPA 70E mandatory?+

Not in itself; it is a consensus standard. In practice it is how employers demonstrate they have met OSHA's general electrical safety duties, and it is the benchmark an investigator applies after an incident. Treat the OSHA standard as the obligation and NFPA 70E as the specification for meeting it.

What does qualified actually mean?+

Trained and demonstrably skilled to recognise and avoid the hazards for the specific equipment and task involved. It is not a general status. Someone qualified on 480V motor control may be unqualified on medium voltage switchgear, and the record should state the scope rather than the designation.

Keep going

Related templates and programmes

Siddarth Singh

Written and reviewed by

Siddarth Singh

Founder & Chief Executive Officer, Knowella

Certified Safety Professional and industrial and systems engineer with more than a decade inside food supply chain, freight and manufacturing operations. This page was written against the current text of the standards it cites, not against secondary summaries of them.

  • Certified Safety Professional (CSP), Board of Certified Safety Professionals
  • MBA, University of Chicago Booth School of Business
  • MS and BS, The Ohio State University, Industrial and Systems Engineering
  • Six Sigma Black Belt
Verify with BCSP →

Sources and last review. Reviewed 16 August 2026 against:

  • 29 CFR 1910 Subpart S, particularly 1910.332 and 1910.333, OSHA
  • 29 CFR 1910.269, electric power generation, transmission and distribution, OSHA
  • NFPA 70E, standard for electrical safety in the workplace
  • NFPA 70B 2023, standard for electrical equipment maintenance
  • CSA Z462, workplace electrical safety (Canada)

This page is general guidance, not legal advice. Confirm requirements with your jurisdiction’s regulator.