What this is
What is a new task ergonomic screening?
What is a new task ergonomic screening?
A prospective screen of a task that does not exist yet, or has materially changed, raised alongside the management of change that introduces it. It records the demands the task is expected to place on the operator, whether the design accommodates them through adjustability, reach, mechanical aids and access, and what must change before go-live. It ends in three decisions: whether a full assessment comes first, whether installation can be signed off, and when the baseline will be done.
Why screen before the task exists?
Because the cost of change rises by orders of magnitude across a project and the range of available controls collapses with it. At concept, working height, orientation, deck level, load size and whether a lift assist is in the package are all still specification decisions. After installation the same problems get answered with platforms, rotation and technique training.
Who should complete it?
The change owner, jointly with ergonomics, and the form requires both an ergonomics and an engineering signature. The pairing is deliberate: ergonomics alone produces recommendations nobody has costed, and engineering alone produces a screen answered against what has already been drawn. Neither is producing the full assessment in ERG-006, which needs a real task running at rate before anything can be measured.
Scope
When is a new task ergonomic screening required?
This screen belongs to change control, not to the assessment programme. Its misuse is chronological rather than categorical: the right form, filled in at the wrong point in the project, once the questions it asks have stopped being open.
Use this template when
- A new task, workstation, line, cell or piece of handling equipment is at concept or design stage
- An existing task is changing materially in load, cycle time, reach, height, layout or crewing
- A management of change record has been raised and needs its ergonomic review before approval
- Equipment is about to be specified or tendered and the requirement needs to reach the enquiry
- A product or packaging change alters what an existing crew handles, even where no equipment changes
Do not use it for
- A task already running at rate, which needs ERG-006 Task Ergonomic Assessment against measured demands rather than anticipated ones
- Triage across an existing area, which is ERG-021 Area Ergonomic Screening and works by walking the floor rather than reading a drawing
- Manual handling in isolation, which ERG-022 Manual Handling Screening bands faster against load, height and frequency criteria
- Detailed workstation geometry against a population, which belongs in ERG-029 Workstation Design Review and ERG-030 Anthropometric Fit Check
- Machine safety, guarding, interlocks and energy isolation, which need an ISO 12100 risk assessment covering every mode of operation
Compliance mapping
Which ISO 45001 cl.8.1.3 requirements does this satisfy?
Design-stage ergonomics is one of the few areas where the standards are more demanding than the regulations. Most regimes put a duty on designers and suppliers, and a duty on the employer to identify hazards before implementation, without prescribing a review; the standards describe the review itself.
| Clause | Requirement | Where it lands |
|---|---|---|
| ISO 45001 cl.8.1.3 | Planned temporary and permanent changes reviewed before implementation, including new equipment and processes | Header |
| ISO 45001 cl.6.1.2.1 | Proactive hazard identification for new or changed processes, equipment and work design | Anticipated demands |
| ISO 6385:2016 | Ergonomic principles applied iteratively through the design of the work system, with worker participation | Design considerations |
| ISO 14738:2002 | Anthropometric requirements for workstations at machinery: working height, reach and clearance across body sizes | Design considerations |
| Machinery Directive 2006/42/EC Annex I s.1.1.6, s.1.6 | Discomfort, fatigue and stress reduced to the minimum by design, with maintenance and servicing points safely accessible | Design considerations |
| ISO 45001 cl.5.4 | Consultation and participation of non-managerial workers, including in planning changes | Design considerations |
| ISO 45001 cl.8.1.4.1 | Procurement processes controlling conformity of purchased products and services to OH&S requirements | Outcome |
| ISO 45001 cl.8.1.2 | Hierarchy of controls applied, elimination and engineering control preferred over administrative measures | Outcome |
What it does not cover
- The full task assessment, which in ERG-006 measures the demands once the task runs at rate; anticipated demands are estimates and this form's own baseline field concedes it.
- The management of change record, which in FDN-020 owns the approval, the affected documents, the training and the authority to proceed; this is one review inside it.
- Machine risk assessment to ISO 12100, which addresses guarding, energy, entrapment and every mode of operation including setting, clearing, cleaning and fault-finding.
- Anthropometric verification, which needs the design checked against percentile data or a real population, not a Yes to a question about whether it fits a range of body sizes.
- Post-installation verification, which confirms that what was specified was actually delivered and set up as intended, and which no pre-installation sign-off can do.
Global
New Task Ergonomic Screening requirements by country
The design-stage duty sits in different places in different regimes: on the designer and supplier in Australia, on the machinery manufacturer in the EU, on the employer's suitability judgement in Great Britain, and almost nowhere explicitly in the United States.
OSH Act Section 5(a)(1); no federal ergonomics or design review standard
Nothing compels an ergonomic design review. The General Duty Clause bites only once a recognised hazard exists in the workplace.
A design-stage record showing a known problem accepted into production is clear evidence of recognition, so an honest screen with no follow-through is worse than none.
PUWER 1998 reg.4; Workplace (Health, Safety and Welfare) Regulations 1992 reg.11
Work equipment must be suitable for its purpose and the conditions of use; workstations must be suitable for the person and the work.
Suitability is judged against the actual conditions of use, which is exactly what a design-stage screen predicts, so the prediction should be written down and tested.
Machinery Directive 2006/42/EC Annex I s.1.1.6, superseded by Machinery Regulation (EU) 2023/1230; Framework Directive 89/391/EEC art.6(2)(d)
Ergonomic design duties on the machinery manufacturer, plus an employer duty to adapt the work to the individual, notably in workplace design and equipment choice.
Article 6(2)(d) makes adaptation a design-stage duty rather than an accommodation arranged later, and it binds the employer whatever the machinery's conformity status.
CSA Z1004 workplace ergonomics; provincial pre-start health and safety review requirements
Ergonomics managed as a programme covering design and procurement, with a formal pre-start review gate for certain apparatus and processes in Ontario.
Where a pre-start review applies, the ergonomic screen belongs in the same pack and on the same critical path, because both block commissioning.
Model WHS Act ss.22 to 25; Model WHS Regulations reg.60
Distinct duties on designers, manufacturers, importers and suppliers of plant, alongside the employer duty to manage musculoskeletal risk from hazardous manual tasks.
Because the supplier carries a duty in its own right, a screening finding can be handed upstream as a specification rather than absorbed as a local workaround.
ISO 45001 cl.8.1.3 and cl.8.1.4; ISO 6385:2016
Change control before implementation, procurement control on purchased equipment, and ergonomic design as an iterative process with worker participation.
Certification auditors sample recent changes and compare dates; a screening completed after commissioning fails the sample however good its content.
How to complete it
How to complete a new task ergonomic screening, step by step
The form is short and every answer is a forecast. Four judgements decide whether the record changes the design or merely describes it.
The stage field captures where in the project this screen was done, from concept through design, procurement and installation to already running, on the principle that earlier is cheaper. Recording it accurately makes the screening auditable, because a screen at concept and a screen at installation are different instruments asking the same questions. A site whose screens cluster at installation raises them too late, and this field is where that pattern shows.
Most design questions offer a middle option: Limited working height adjustment, Partly fits a range of body sizes, Partly considered for maintenance and cleaning access. Each is honest and none is a decision. Set a rule that any answer other than Yes carries either a design change or a written acceptance naming who accepted the residual demand. Without it, the middle option is where the screening quietly settles.
Design changes recommended is free text on an internal form, and free text does not reach a fabricator. Adjustable infeed height, a lift assist in scope, a reach envelope limit, a wash-down access panel: each has to appear in the enquiry, the order or the design review record before it is real. The screening's job is procurement language, generated early enough to cost nothing.
Anticipated demands are estimates made before anyone ran the cycle at rate with real product and real crewing. The field asking whether a baseline assessment is planned after start-up exists because the screen cannot substitute for measurement. Set that date and owner while the project still has a budget; once it closes, the post-start assessment becomes an unfunded request and does not happen.
What auditors find
Most common new task ergonomic screening findings
Findings on this record are almost never about content. They are about dates, about middle answers, and about the distance between what the screen recommended and what was bought.
| Finding | Clause | What fixes it |
|---|---|---|
| Screening completed after the equipment was ordered or installed; stage recorded as installation or already running. | ISO 45001 cl.8.1.3 | Make the screen a prerequisite of change approval rather than a document the project produces later. |
| MOC ID blank; the change is in the plant with no change record behind it. | ISO 45001 cl.8.1.3 | Raise the screen from the management of change so both references are created at once. |
| Design questions answered Partly or Limited throughout, with no design change and no recorded acceptance. | ISO 45001 cl.8.1.2 | Require a change or a named acceptance for every answer other than Yes before sign-off is available. |
| Workers consulted on design recorded as informed only. | ISO 45001 cl.5.4 | Put two operators from the receiving crew in the design review and record them by name and role. |
| Recommended design changes absent from the supplier enquiry, purchase order and design review record. | ISO 45001 cl.8.1.4.1 | Transcribe each recommendation into the procurement specification and cite the screening ID against it. |
| No mock-up or trial planned for a workstation with fixed working height and a defined reach envelope. | ISO 6385:2016 | Rig a full-scale mock-up and trial it with the shortest and tallest operators before fabrication is released. |
| Fit across body sizes answered Yes on the basis of one operator's trial. | ISO 14738:2002 | Check the geometry against percentile data or a spread of real operators, and record who was used. |
| Maintenance and cleaning access considered against the running state only; wash-down postures never examined. | Machinery Directive 2006/42/EC Annex I s.1.6 | Walk the clean and the planned maintenance routines with the people who will do them, at design stage. |
| Full assessment required before go-live recorded as Yes, but the task started without one. | ISO 45001 cl.8.1.3 | Tie the go-live authorisation to the assessment record rather than to the screening signature. |
| Baseline assessment after start-up recorded as not planned, so anticipated demands are never tested against actual. | ISO 45001 cl.9.1.1 | Set the date and owner for the post-start assessment inside the project, before it closes. |
Case in point
Case in point: the case packer that arrived two hundred millimetres too high
A dairy site installed a new case-packing cell on a filling line. The screening was raised properly, referenced the MOC, and was signed by ergonomics and engineering. It recorded lifting, repetitive work, moderate force demands and a chilled environment. Working height adjustable was answered Limited, because the infeed table was fixed at the conveyor deck level of 1,050 mm. Fits range of body sizes was answered Partly. No mock-up was planned. Every answer was accurate.
The screen was signed eleven days after the purchase order, because the ergonomist had been on leave through the design freeze and the project would not hold. Nine months in, three operators of around 1.6 m were reaching above shoulder height to place cases for four hours a shift. Two discomfort reports and a physiotherapy referral later, the fix was a platform at the infeed: a capital request, a hygiene review because it sat in a wash-down zone, and a shutdown window. Eleven months, and more than an adjustable table would have added to the order.
Nothing had been hidden. Limited and Partly were both true, and neither carried a consequence, because the form had no rule turning a non-Yes into a hold and no route by which a finding reached the purchase specification. The change afterwards was structural: the screening became a prerequisite for the requisition rather than for installation, and any answer below Yes now blocks sign-off until a design change or named acceptance is attached.
The template
The template, field by field
The form exactly as it installs. Every field, option, score and conditional rule is editable, and the links to other templates come with it.
4 sections
- Reference
- ERG-023
- Archetype
- Assessment
- Record ID
- SCR4-2026-000
- Scoring
- Risk band
- Direction
- High is bad
- Singleton
- No
- Basis
- ISO 45001 cl.8.1.3
- Links
- Links MOC, Job
- Tags
- Ergonomics, Screening, Change
- Sections
- 4
- Fields
- 42
- Follow up fields
- 3
- Repeating sections
- 0
- Links out
- 5
Header
14 fieldsScreening ID*
Auto sequence. Format NTS-2026-000.
The record's own ID. Other templates point at this value.
Status*
Drives who this goes to next.
- Planned2 pts
- In progress2 pts
- Complete3 pts
- Deferred0 pts
- Open0 pts
- Closed3 pts
- Overdue0 pts
Date and Time*
Completed By*
Site*
Site ID*
Format SITE-000.
Links to FDN-001 Site ID
Area
The area within the site.
Exact Location
Drop a pin for anything hard to find.
Task*
Job ID*
Format JOB-000.
Links to FDN-004 Job Task ID
Cheapest Point To Fix It
A workstation changed on a drawing costs nothing. The same change after installation costs thousands and usually never happens.
New Task Or Change*
MOC ID
Links to FDN-020 MOC ID
Stage*
Concept, design, procurement, installation or already running. Earlier is cheaper.
Anticipated demands
6 fieldsLifting Involved*
- No3 pts
- Yes1 pt
Repetitive Work Involved*
- No3 pts
- Yes1 pt
Sustained Posture Involved*
- No3 pts
- Yes1 pt
Force Or Grip Demands*
- Low3 pts
- Moderate1 pt
- High0 pts
Machine Paced*
- No3 pts
- Partly1 pt
- Yes0 pts
Cold Or Wet Environment*
- No3 pts
- Chilled1 pt
- Freezer or wet0 pts
Design considerations
9 fieldsWorking Height Adjustable*
- Yes3 pts
- Limited1 pt
- Fixed0 pts
Fits Range Of Body Sizes*
- Yes3 pts
- Partly1 pt
- No0 pts
Reach Distances Acceptable*
- Yes3 pts
- Marginal1 pt
- No0 pts
Sit Stand Option Included*
- Yes3 pts
- No1 pt
Mechanical Aids Specified*
- Yes3 pts
- Partly1 pt
- No0 pts
Maintenance Access Considered*
- Yes3 pts
- Partly1 pt
- No0 pts
Cleaning Access Considered*
- Yes3 pts
- Partly1 pt
- No0 pts
Workers Consulted On Design*
The people who will use it will spot problems no drawing review finds.
- Yes3 pts
- Informed only1 pt
- No0 pts
Mock Up Or Trial Planned*
- Yes3 pts
- No0 pts
Outcome
13 fieldsFull Assessment Required Before Go Live*
- Yes3 pts
- No1 pt
Design Changes Recommended
Design Review ID
Links to ERG-029 Review ID
Baseline Assessment Planned After Start*
- Yes3 pts
- No0 pts
Sign Off Before Installation*
- Yes3 pts
- No0 pts
Action Required*
Raise the action record, then enter its reference here.
- No2 pts
- Yes0 pts
Priority
- High0 pts
- Medium1 pt
- Low3 pts
CAPA ID
Format CAPA-2026-00000.
Links to FDN-014 CAPA ID
Action Owner
Ergonomics*
Signature*
Engineering*
Second Signature*
ERG-023 · record IDs look like SCR4-2026-000 · Links MOC, Job
Open in KnowellaRun it with agents
From a document you fill in to a programme that runs itself
The form is one page. What fails is around it: the change that raised no screening, the recommendation that never reached the order, and the baseline assessment that was going to be booked once the project settled down.
Holds the screening against the change and task registers, carries each recommendation into the design review, and blocks sign-off while a non-Yes answer sits without a change or an acceptance.
Owns the management of change record, so a new or altered task raises the ergonomic screening as a prerequisite of approval rather than a document collected later.
Brings the maintenance and cleaning routines into the design questions, so strip-down, wash-down and fault-finding postures are examined by the people who will perform them.

Tracks screenings against project stage, flags any raised at or after procurement, and chases the baseline assessment date before the project closes and its budget disappears.
This template lives in KnowErgo — ergonomics. Task assessment, video posture analysis, rotation and workstation redesign.
Meet KnowErgo→Glossary
New Task Ergonomic Screening definitions and key terms
- Management of change
- The controlled process for reviewing and authorising planned changes to process, equipment, materials, layout or crewing before implementation, required by cl.8.1.3.
- Prevention through design
- Addressing occupational risk at the design and specification stage of equipment, processes and facilities, where elimination and engineering control are still cheap.
- Anticipated demand
- A predicted physical requirement of a task that does not yet exist, derived from design intent rather than measurement. Provisional, and always in need of a baseline check.
- Anthropometry
- Measurement of body dimensions across a population, used in design to set heights, reaches and clearances so small and large operators are both accommodated.
- Reach envelope
- The volume within which an operator can work without extending the shoulder or leaning from the trunk. Most often exceeded by a workstation that looked correct in plan view.
- Mock-up
- A full-scale rig of a proposed workstation, built cheaply and used by real operators before fabrication is released. The highest-yield ergonomic activity at design stage.
- Machine-paced work
- Work whose cycle rate is set by equipment rather than the operator, removing the micropauses recovery depends on and making rate a design decision, not a behavioural one.
- Baseline assessment
- The first full task assessment once the new task runs at rate, establishing the measured starting point against which any later redesign is compared.
FAQ
Frequently asked questions about new task ergonomic screening
Is this the same thing as the area screening?+
No, and they should not be substituted. ERG-021 triages tasks that already exist by observing them, and produces a referral list. This screen has nothing to observe; it interrogates a design and produces commitments and a hold. A new line screened with the area tool scores everything unknown, and an existing area screened with this one collects design answers nobody can change.
Do we need it if the equipment is CE marked?+
Yes. The manufacturer's duty under Machinery Directive Annex I 1.1.6 covers the machine's own ergonomic design. It says nothing about where the pallet sits, how far the operator reaches to the infeed, how high the case is lifted or how the task is crewed. Most musculoskeletal exposure in a new installation is created in the space around compliant equipment.
What if the change is only a new product on an existing line?+
Screen it if load, reach, cycle time, pack format or crewing changes. Product changes are the commonest unscreened change on a food or manufacturing site precisely because no equipment moves, and a heavier case or a taller pack alters the demand on the same station without any engineering record being raised.
Who owns this, engineering or safety?+
The change owner, usually engineering or operations, with ergonomics as a required signatory. Ownership in safety produces a form chased late by someone with no authority over the specification. Ownership in engineering alone produces a form answered against the design that already exists. The two signatures are the point.
Can a task go live with the screening still open?+
No, and the record already draws the line: full assessment required before go-live and sign-off before installation are both explicit fields. If they are answered Yes and the task starts anyway, change control failed, not the screening. Tie the go-live authorisation to the assessment record, not to the screening signature.
Does it replace the assessment once the task is running?+
No. Everything in it was a forecast made before anyone ran the cycle at rate, and forecasts about frequency and duration are the ones that go wrong. Book the baseline inside the project, then use ERG-013 or ERG-014 to compare it against the screening's predictions; that comparison is also how the method itself improves.
Keep going
Related templates and programmes
Industries this is written for
Programmes this belongs to
Used together in Ergonomics and MSD Prevention
Discomfort Report
Lets a worker report aches, pain or discomfort early, before it becomes an injury
Body Part Symptom Survey
Maps where in the body workers are experiencing discomfort, across a team or area
MSD Injury Report
Records a diagnosed musculoskeletal injury, including affected body part and suspected task
Early Intervention Record
Records the actions taken when discomfort is reported, before it becomes an injury
MSD Trend Review
Reviews discomfort reports and MSD injuries across areas and tasks
Task Ergonomic Assessment
Assesses a work task using video, applying the methods you configure such as RULA, REBA or WISHA
More in Screening
Area Ergonomic Screening
A quick first pass across a whole area to find which tasks need a full assessment
Manual Handling Screening
A rapid check of manual handling tasks to band them by risk
Shift Fatigue Screening
Screens work patterns for fatigue risk, covering shift length, rotation, breaks and consecutive days
Screening Follow Up Log
Tracks which screened tasks went on to full assessment and which did not

Written and reviewed by
Siddarth Singh
Founder & Chief Executive Officer, Knowella
Certified Safety Professional and industrial and systems engineer with more than a decade inside food supply chain, freight and manufacturing operations. This page was written against the current text of the standards it cites, not against secondary summaries of them.
- Certified Safety Professional (CSP), Board of Certified Safety Professionals
- MBA, University of Chicago Booth School of Business
- MS and BS, The Ohio State University, Industrial and Systems Engineering
- Six Sigma Black Belt
Sources and last review. Reviewed 16 August 2026 against:
- ISO 45001:2018 clauses 8.1.3, 8.1.4, 8.1.2 and 5.4
- ISO 6385:2016 ergonomic principles in the design of work systems
- ISO 14738:2002 anthropometric requirements for the design of workstations at machinery
- Machinery Directive 2006/42/EC Annex I sections 1.1.6 and 1.6, and Machinery Regulation (EU) 2023/1230
- Council Directive 89/391/EEC article 6(2)(d), adapting the work to the individual
- Provision and Use of Work Equipment Regulations 1998 regulation 4, and Workplace (Health, Safety and Welfare) Regulations 1992 regulation 11 (GB)
- Model WHS Act sections 22 to 25, duties of designers, manufacturers, importers and suppliers (Australia)
This page is general guidance, not legal advice. Confirm requirements with your jurisdiction’s regulator.