In short
- A rate and oee review is a review used in KnowOps that reviews availability, performance and quality for a line over a period and identifies the dominant loss. It is built against SAE JA1011 and forms part of the Production Control programme.
- Run weekly. Carried out by the production manager with engineering.
- The template holds 56 fields across 6 sections.
- Scoring is overall effectiveness, where high is good.
- SAE JA1011 is reliability centred maintenance criteria. What a process must do to be called RCM rather than a maintenance review.
- It connects to the rest of the library: links Downtime Log, Scrap Record, Reliability.
What it is
What it is
What is a rate and oee review?
A rate and oee review is a review used in KnowOps that reviews availability, performance and quality for a line over a period and identifies the dominant loss. It is built against SAE JA1011 and forms part of the Production Control programme.
When is a rate and oee review completed?
A rate and oee review is completed at the review interval, and after any trigger event. Run weekly.
When to use it
When to use it, and when not to
This review is one step in a larger programme. Using it for work that belongs to a neighbouring template produces records that are hard to report on later.
Use it for
- The event or activity this review covers has occurred, or is about to
- The workspace is being set up, or the register needs an entry added or retired
- You are running the Production Control programme and this is one of its steps
- A linked record needs this one to exist: links downtime log, scrap record, reliability
Not for
- Line Clearance Record, which confirms a line is clear of the previous product, its packaging and its paperwork before the next one starts.
- Production Order Record, which records the execution of a production order, covering quantities, materials consumed, yield and where it went.
- Changeover Record, which times and records a changeover from last good piece to first good piece, with what was done in between.
- Anything outside KnowOps, which belongs in the workspace that owns that process
Standards
What it is built against
SAE JA1011Reliability centred maintenance criteria
What a process must do to be called RCM rather than a maintenance review.
SAESociety of Automotive Engineers
Engineering standards for vehicles and mobile equipment.
FAQ
Frequently asked questions
What is the rate and oee review template based on?+
It is built against SAE JA1011. SAE JA1011 is reliability centred maintenance criteria. What a process must do to be called RCM rather than a maintenance review. SAE is society of Automotive Engineers. Engineering standards for vehicles and mobile equipment.
What sections does the rate and oee review contain?+
There are 6 sections: header, data quality, losses, action, related records, outcome. Together they hold 56 fields, 45 of which are required.
How many rate and oee review records should we have?+
This is a singleton. One record per workspace, set up once and maintained, rather than one per event. Other templates refer back to it.
Which programme does the rate and oee review belong to?+
It is part of Production Control. Losses recorded by reason as they happen rather than totalled at month end.
How is a rate and oee review scored?+
Scoring is overall effectiveness. High is good. Scores exist to make the form tell you something, not to produce a percentage for its own sake.
Can the rate and oee review template be changed?+
Yes. Every field, option, score and conditional rule is editable, and the links to other templates come with it. Most teams install it as it is, run it for a cycle, then adjust.
The agents
What the agents do with it
The form is the easy part. Keeping it current, routing it to the right owner and holding the evidence together is the work that actually slips.
Holds the rate and oee review library against your registers, routes each record to its owner, and keeps the evidence trail together.
Coordinates the crew, rolls completion and exceptions into one view, and holds every write for your approval before it touches a record.
This template lives in KnowOps — frontline execution. Shift handover, production control, daily management, worker lifecycle and improvement.
Sources
Sources
- SAE JA1011 — Reliability centred maintenance criteria
- SAE — Society of Automotive Engineers