What this is
What is a repair record?
What is a repair record?
It is the account of what was physically done to restore an asset, as distinct from why it failed. It captures the method, parts fitted with their numbers, settings or torques changed, and verification that the asset works. It is the configuration history the next technician diagnoses against.
Why does an approved equivalent part need recording?
Because substitution is a change to the asset, not a like-for-like repair. An equivalent may differ in clearance, material or duty rating in ways that matter under wash-down or at load. ISO 55001 treats this as management of change, which is why the field separates original, approved equivalent and unapproved substitute.
What counts as function testing after a repair?
Running the asset under representative duty and confirming it performs to specification, not simply that it starts. That includes protective functions, interlocks and guards disturbed by the work. A repair signed off on a no-load spin is the commonest route back to an unplanned stop that week.
Scope
When is a repair record required?
This is the record of the physical fix. It sits alongside the failure classification rather than replacing it, and stops where the asset is verified and returned to production. Used for adjacent jobs it produces a history that is unusable or misleading.
Use this template when
- A corrective or planned repair has been carried out on a registered asset
- Parts were fitted, replaced or fabricated and must enter the asset's configuration history
- Settings, torques or alignment were changed and the new values must be recoverable
- The repair is intended to be permanent and the asset is returning to normal production
- A work order needs closing with evidence the asset was function tested before release
Do not use it for
- Temporary Repair Record, which carries an expiry date and a plan for the permanent fix, and covers anything holding on a clamp, a strap or a bypass.
- Failure Mode Record, which codes how and why the component failed rather than what was done to it, on the same event.
- Equipment Failure Report, raised at the breakdown to capture production impact, before anyone has touched the machine.
- Job Plan, the pre-written instruction for a repeatable task, referenced here rather than rewritten each time.
- Calibration Record, the controlled measurement activity this record triggers when a repair disturbs an instrument.
Compliance mapping
Which ISO 55001 cl.8.2 requirements does this satisfy?
ISO 55001 does not name a repair record. It requires that activity on assets is controlled and documented, that changes are managed, and that the resulting information reaches the people who need it. This form is where those obligations land for corrective work.
| Clause | Requirement | Where it lands |
|---|---|---|
| ISO 55001:2014 cl.7.5 | Information requirements determined: what is captured, against which asset, by whom | Header |
| ISO 55001:2014 cl.8.1 | Work carried out against a defined method, with deviation identified rather than absorbed | What was done |
| ISO 55001:2014 cl.8.2 | Changes to assets managed, with the risk of the change assessed before return to service | Parts |
| BRCGS Food Safety Issue 9, cl.4.7 | Parts in contact with or above product are food-grade, and debris is removed from production areas | Parts |
| ISO 55001:2014 cl.8.2 | Modified operating parameters recorded so current configuration is known, not inferred | Settings and calibration |
| ISO 55001:2014 cl.7.6 | Documented information controlled, retained and available when needed | Verification and history |
What it does not cover
- The work order close-out comment, which records that the job finished and the labour is booked, and rarely carries a part number or a setpoint.
- The parts issue from stores, which proves a part left the shelf but not that it went into this asset, at this position, in place of what.
- A photograph of the repaired assembly, which shows the outcome and none of the values, and cannot be searched by part number when the failure recurs.
- The technician's recollection, which is genuinely good for about three weeks and is the de facto asset history in most plants that believe they have one.
- The contractor's service report, which is written to justify an invoice, rarely carries your part numbering, and leaves the settings they changed undocumented.
Global
Repair Record requirements by country
Repair documentation is regulated indirectly: not as a records requirement in its own right, but through the duty to keep equipment safe, fit for purpose and incapable of contaminating product. These three regimes reach the maintenance workshop.
BRCGS Food Safety Issue 9, clause 4.7
A documented maintenance programme is required, temporary repairs must be controlled and time-limited, and equipment cleared of maintenance debris and tools before production restarts.
This clause turns Old Part Disposal and Food Grade Where Required into audit evidence. Non-conformances land on the record rather than the workshop, because the record is what an auditor reads.
21 CFR 117.40 and 117.35, FDA Preventive Controls for Human Food
Equipment must be of appropriate design and material and maintained so as to protect against contamination, and lubricants and other materials used near product must be safe for their intended use.
An unapproved substitute part or a non-food-grade lubricant introduced during a repair is a direct breach, and this record is where an investigator looks for it.
Regulation (EC) No 852/2004, Annex II, Chapter V
All articles, fittings and equipment contacting food must be kept in good order, repair and condition so as to minimise any risk of contamination.
The obligation attaches to condition, and condition after a repair is what this record evidences. In enforcement, an absent repair history reads as absent control.
How to complete it
How to complete a repair record, step by step
The mechanical work is not the hard part. Four judgements made while the line is down decide whether this record is defensible or merely present, and each runs against the incentive to get production away.
Original Or Equivalent scores an unapproved substitute at zero, and the word doing the work is approved. Approved means engineering assessed the difference against duty, material and clearance and recorded it. A part that fits and has been used before is not approved, it is habitual. On nights the honest answer is usually Unapproved substitute, and recording it triggers the review it deserves.
Setting Detail only appears when Settings Changed is Yes, so a No closes the section. Technicians answer No after tweaking a speed setpoint, a pressure limit or a timer, because it does not feel like a modification. It is the highest-value field on the form: undocumented setpoint drift is how identical machines stop behaving identically.
Function Tested scores Not applicable the same as Yes, which makes it the escape route. Reserve it for work that cannot change function, and almost nothing qualifies once a fastener has been undone. Test under load, with product or a surrogate, and prove any guard or interlock disturbed by the work still stops the machine.
Follow Up Check Scheduled and Run In Period Required decide whether anyone looks at this asset again before it fails. Any rebuild, fabrication, bearing or coupling install and any equivalent substitution should carry a check inside the run-in window. Scheduling it here rather than intending to remember is the difference between catching a fitting error and rediscovering it as a breakdown.
What auditors find
Most common repair record findings
These surface when a year of repair records is read against the assets they describe. Most are visible from the records alone, which is what makes them worth auditing.
| Finding | Clause | What fixes it |
|---|---|---|
| Part Number blank on many records, with only a free-text description entered | ISO 55001:2014 cl.7.5 | Make the number mandatory where Repair Type is Component replacement, and resolve it from the spares catalogue rather than typing it, so history is searchable by part. |
| Settings Changed answered No on records whose description narrates an adjustment | ISO 55001:2014 cl.8.2 | Audit descriptions against the field. Where text contradicts the answer, treat it as a management-of-change failure, because the setpoint the record denies is the one nobody can recover. |
| Approved equivalents fitted repeatedly with no engineering assessment on file | ISO 55001:2014 cl.8.2 | Query the year, list substitutions by part, and either approve them through change control or correct the stores catalogue that made them the default. |
| Old Part Disposal answered Left in area on records from production zones | BRCGS Food Safety Issue 9, cl.4.7 | Route any such answer to the quality workspace as a foreign body near miss, rather than leaving it as a scored maintenance field nobody reads. |
| Calibration Required After Repair answered Yes with no Calibration ID entered | ISO 55001:2014 cl.8.1 | Make the conditional Calibration ID required when the answer is Yes and hold release of the asset until it resolves to a completed calibration record. |
| Asset History Updated answered Yes while the register shows no corresponding entry | ISO 55001:2014 cl.7.6 | Stop asking and make the update automatic from the record. A self-declared admin step performed by the person it inconveniences always drifts towards Yes. |
Case in point
Case in point: the filler that nobody could match
A beverage plant ran two nominally identical fillers on adjacent lines. Line two produced more low-fill rejects and had done for over a year. Engineering compared manuals, setpoint screens and schedules and found no difference. The theory settled on a worn valve block, and a rebuild kit was ordered at cost.
Before it arrived, someone read the repair records. Eleven months earlier a night-shift repair on line two had fitted a fill valve seat from a second supplier as an approved equivalent and, in the same job, cut the fill dwell by forty milliseconds to stop the machine dripping. Settings Changed said Yes and Setting Detail carried the value. Nobody had looked. The seat geometry differed slightly, the dwell change had been a workaround, and both had become the machine's normal state. Reverting the dwell and standardising the seat closed the reject gap inside a shift.
The template
The template, field by field
The form exactly as it installs. Every field, option, score and conditional rule is editable, and the links to other templates come with it.
5 sections
- Reference
- MNT-015
- Archetype
- Record
- Record ID
- REP-2026-000
- Scoring
- Not scored
- Direction
- n/a
- Singleton
- No
- Basis
- ISO 55001 cl.8.2
- Links
- Links Asset, Work Order
- Tags
- Maintenance, Repair
- Sections
- 5
- Fields
- 39
- Follow up fields
- 3
- Repeating sections
- 1
- Links out
- 5
Header
12 fieldsRecord ID*
Auto sequence. Format REP-2026-000.
The record's own ID. Other templates point at this value.
Status*
Drives who this goes to next.
- Planned2 pts
- In progress2 pts
- Complete3 pts
- Deferred0 pts
- Open0 pts
- Closed3 pts
- Overdue0 pts
Date and Time*
Raised By*
Site*
Site ID*
Format SITE-000.
Links to FDN-001 Site ID
Area
The area within the site.
Exact Location
Drop a pin for anything hard to find.
Asset*
Asset ID*
Format AST-0000.
Links to FDN-002 Asset ID
Work Order ID*
Links to MNT-002 Work Order ID
Repair Type*
What was done
4 fieldsRepair Description*
Method Used*
Replace, rebuild, adjust, weld, machine or software change.
Followed Job Plan*
- Yes3 pts
- Partly1 pt
- No plan exists0 pts
Job Plan ID
Links to MNT-006 Plan ID
Parts
Repeats6 fieldsPart Replaced*
Part Number
Quantity*
Original Or Equivalent*
- Original manufacturer part3 pts
- Approved equivalent2 pts
- Unapproved substitute0 pts
Food Grade Where Required*
- Yes3 pts
- Not required3 pts
- No0 pts
Old Part Disposal*
Old parts left in a food area become foreign bodies. Remove them from site or bin them properly.
- Removed from site3 pts
- Binned correctly2 pts
- Left in area0 pts
Settings and calibration
7 fieldsSettings Changed*
- No3 pts
- Yes1 pt
Settings Recorded
- Yes3 pts
- No0 pts
Setting Detail
Torque Values Applied
- Yes3 pts
- Not specified1 pt
- No0 pts
Alignment Checked
- Yes3 pts
- Not required3 pts
- No0 pts
Calibration Required After Repair*
Calibration ID
Links to MNT-060 Calibration ID
Verification and history
10 fieldsFunction Tested*
- Yes3 pts
- Not applicable3 pts
- No0 pts
Run In Period Required
Follow Up Check Scheduled
- Yes3 pts
- No1 pt
Asset History Updated*
- Yes3 pts
- No0 pts
Manual Or Drawing Updated
- Yes3 pts
- Not required3 pts
- No0 pts
Spares Reordered
Technician*
Signature*
Supervisor*
Second Signature*
MNT-015 · record IDs look like REP-2026-000 · Links Asset, Work Order
Open in KnowellaRun it with agents
From a document you fill in to a programme that runs itself
Writing one repair record takes minutes. Keeping the parts, settings and verification attached to the asset rather than the job, and findable at the next breakdown, is where the value is made or lost.
Attaches the record to the asset and work order, holds parts and setpoint history as the asset's configuration, and triggers the follow-up check when a run-in period is declared.
Treats the food-grade and disposal answers as contamination controls, so a part left in a production area becomes a near miss rather than a maintenance score.
Holds the isolation and permit the repair ran under, and checks that guards and interlocks disturbed by the work were proven before release.

Surfaces substitutions and setpoint changes across the year, drafts the engineering review where an equivalent has quietly become standard, and holds every write for approval.
This template lives in KnowMaintain — asset maintenance. Work orders, planned maintenance, calibration, reliability and shutdowns.
Meet KnowMaintain→Glossary
Repair Record definitions and key terms
- Approved equivalent
- A non-original part formally assessed by engineering as fit for the duty, material and clearance of the position it occupies, with that assessment recorded.
- Management of change
- The controlled process by which any alteration to an asset, its parts or its operating parameters is risk assessed and documented before it returns to service.
- Run-in period
- The interval just after a repair or overhaul when fitting errors and early-life defects are most likely to appear, and a follow-up check has the highest yield.
- Job plan
- A pre-written instruction for a repeatable maintenance task covering method, parts, tools and acceptance criteria, referenced from this record rather than duplicated in it.
- Foreign body
- Any extraneous material capable of entering product, including fasteners, washers, swarf and discarded components maintenance leaves in a production area.
FAQ
Frequently asked questions about repair record
Do we need both a repair record and a failure mode record for the same event?+
Yes, and they answer different questions. The failure mode record codes why the component failed so the population can be trended; this one documents what the asset now is. Merging them gives a form too long for the technician and too vague for the engineer, so both end up unfilled.
What about repairs carried out by an external contractor?+
Raise the record in your own system regardless, with their report attached rather than substituted. Part numbers, settings and torques must sit in your fields, because their report will not be searchable when the asset fails in two years and the contract has changed hands.
How is the Parts section meant to handle a job with several components?+
The section repeats, so each part gets its own entry with its own number, quantity, origin and disposal answer. Listing several in one entry defeats the point: the substitution and food-grade questions apply per part, and a single answer hides the exception.
Should torque values be recorded when the manual does not specify any?+
Record Not specified rather than No, which is why the field has three options. No means a torque was specified and not applied, which is a defect. Not specified means the manufacturer left a gap, which is a case for a site standard rather than for leaving it to feel.
Does the supervisor's countersignature add anything real?+
Only if the supervisor is accountable for the temporary-versus-permanent call and for release to production. Used that way it is the control on the most consequential judgement on the form. Used as a rubber stamp it adds delay and nothing else.
What is the minimum a repair record must capture to be worth keeping?+
Asset, date, what was replaced with which part number, what was changed and to what value, and evidence of a function test. A record with those five is usable a decade later. Everything else improves the analysis; those five make it possible at all.
Keep going
Related templates and programmes
Industries this is written for
Programmes this belongs to
Used together in Reliability and Predictive Maintenance
Root Cause Analysis
Finds out why something happened rather than who was involved
Equipment Failure Report
Records that an asset has failed and stopped or degraded production
Failure Mode Record
Records how an asset failed, using standard failure mode codes rather than free text
Temporary Repair Record
Records a repair that is not permanent, with an expiry date and a plan for the proper fix
Repeat Failure Review
Reviews an asset that has failed the same way more than once
Production Impact Record
Records what the failure cost in lost output, scrap and late orders
More in Breakdowns
Equipment Failure Report
Records that an asset has failed and stopped or degraded production
Failure Mode Record
Records how an asset failed, using standard failure mode codes rather than free text
Temporary Repair Record
Records a repair that is not permanent, with an expiry date and a plan for the proper fix
Repeat Failure Review
Reviews an asset that has failed the same way more than once
Production Impact Record
Records what the failure cost in lost output, scrap and late orders
Breakdown Debrief
A short review straight after a significant breakdown, capturing what happened and what would have helped

Written and reviewed by
Siddarth Singh
Founder & Chief Executive Officer, Knowella
Certified Safety Professional and industrial and systems engineer with more than a decade inside food supply chain, freight and manufacturing operations. This page was written against the current text of the standards it cites, not against secondary summaries of them.
- Certified Safety Professional (CSP), Board of Certified Safety Professionals
- MBA, University of Chicago Booth School of Business
- MS and BS, The Ohio State University, Industrial and Systems Engineering
- Six Sigma Black Belt
Sources and last review. Reviewed 16 August 2026 against:
- ISO 55001:2014 — Asset management systems: requirements, cl.7.5, cl.7.6, cl.8.1, cl.8.2, cl.9.1
- BRCGS Global Standard Food Safety Issue 9, clause 4.7 — Maintenance
- 21 CFR 117.35 and 117.40 — FDA Preventive Controls for Human Food
- Regulation (EC) No 852/2004, Annex II, Chapter V
- EN 13306:2017 — Maintenance terminology
This page is general guidance, not legal advice. Confirm requirements with your jurisdiction’s regulator.