Temporary Repair Record

The recurring failure isn't the stopgap itself, it's the stopgap that quietly becomes permanent. A part gets straightened instead of replaced, a tag goes on the equipment, and six months later nobody remembers it was ever supposed to be temporary. Without a forcing expiry date and a named approver for the residual risk, this record is the only thing standing between a sensible short-term call and a piece of equipment nobody trusts.

KnowMaintainRecordMNT-016Pinned in navigation46 fields across 5 sectionsFull researchSee the form

Reviewed by Siddarth SinghCSPLast reviewed 16 August 2026

Basis
ISO 55001 cl.8.2
Workspace
KnowMaintain
Form type
Record
Raised
Whenever a temporary fix is made
Approved by
Maintenance manager, against the risk band

The short version

  • A temporary repair record exists because a stopgap fix carries risk that a normal repair record does not: it must name why the fix is temporary, score that risk on three separate lenses, and carry an expiry date that forces the permanent fix.
  • Approval is tiered by risk: Quality manager, Site manager or Group technical, not the technician who made the fix.
  • The template holds 46 fields across 5 sections, and scores as a risk band where high is bad.
  • It links to the asset and feeds the work order for the eventual permanent fix, so an open temporary repair without a linked work order is a visible gap, not a silent one.

What this is

What is a temporary repair record?

What is a temporary repair record?

It is the record used in KnowMaintain to capture a repair that is not the permanent fix: what was done, why it fell short of a full repair, and what controls are in place while it stays that way. It carries an expiry date and a named plan for the proper fix, and it is built against ISO 55001 cl.8.2.

What makes a repair temporary rather than permanent?

A repair is temporary when it restores function without restoring the asset to its designed condition, typically because a part was unavailable, there was no access window, or a decision or budget is still pending. If it has no expiry date and no permanent fix planned, it is not temporary, it is just undocumented risk.

What happens if a temporary repair is not closed by its expiry date?

The record is designed to surface this as a late closure rather than let it slide silently. Days Until Expiry and Completed On Or Before Expiry exist specifically so a missed date shows up as a finding, and an extension has to be logged and re-approved rather than assumed.

Scope

When is a temporary repair record required?

This record is one step in the Reliability and Predictive Maintenance programme, and it exists only for repairs that are known, at the time they are made, not to be the final fix. Using it for anything else produces a risk register full of noise.

Use this template when

  • A repair was just made that restores function but not the asset's designed condition
  • The reason it's temporary is known now: part unavailable, no access window, or a pending engineering or budget decision
  • A new record is needed; each one gets its own ID in the form TREP-2026-000
  • A permanent fix can be named, even provisionally, with a target date
  • A linked record needs this one to exist: it links the asset and feeds the eventual work order

Do not use it for

  • Equipment Failure Report, which records that an asset has failed and stopped or degraded production, not what was done about it.
  • Failure Mode Record, which records how an asset failed using standard failure mode codes rather than the fix applied.
  • Repair Record, which is for a fix that restores the asset's designed condition, not a stopgap with an expiry date.
  • Anything outside KnowMaintain, which belongs in the workspace that owns that process
  • A repair you already know is permanent, which only needs the Repair Record and skips the risk-band scoring entirely

Compliance mapping

Which ISO 55001 cl.8.2 requirements does this satisfy?

The template is built against ISO 55001 cl.8.2, management of change, but a temporary repair touches several other clauses of the standard as it moves from fix to closure.

ClauseRequirementWhere it lands
ISO 55001 cl.8.2A departure from the asset's designed condition is treated as a managed change, not an informal workaroundThe temporary repair
ISO 55001 cl.6.1Risks arising from the temporary condition are identified and addressed on their own terms, not folded into the original failureRisk while in place
ISO 55001 cl.8.1Operational controls (monitoring, restrictions) continue to apply while the asset runs outside its normal conditionRisk while in place
ISO 55001 cl.5.3The authority accepting residual risk is defined by role, and scales with how severe that risk isPermanent fix
ISO 55001 cl.8.2The change has a defined end: a permanent fix, scheduled, with a date it must be done byPermanent fix
ISO 55001 cl.9.1The asset's condition is monitored for as long as the temporary state remains in placeRisk while in place
ISO 55001 cl.10.1A fix that runs past its expiry, or a risk that resurfaces, is handled as a nonconformity with a corrective action, not just notedClosure

What it does not cover

  • Expiry Date, which is the only thing forcing the permanent fix to happen rather than becoming the new normal.
  • Repair Tagged On Equipment, which is the physical control that stops the next technician treating a stopgap as designed.
  • Approval Level, which shows whether the authority accepting the risk actually matches how severe that risk is.
  • Increased Monitoring Applied, which is the control meant to catch deterioration while the real fix is deferred.
  • Action Required, which is where a fix that only half-holds gets a named gap and an owner, instead of quietly staying half-held.

Global

Temporary Repair Record requirements by country

A temporary repair rarely stays inside one framework: it is an asset management decision, a workplace safety control, and, on a food site, a hygiene control all at once.

International

ISO 55001 cl.8.2 and cl.6.1

Asset management standard, not a legal instrument

A temporary repair is a managed change with an identified, time-bound risk; the standard does not permit an undated stopgap.

United Kingdom

Regulation (EC) 852/2004 and the Food Safety and Hygiene (England) Regulations 2013

Statutory hygiene requirement

Where the asset touches product, a temporary fix that leaves loose material, poor sealing or a non food-grade surface is a hygiene control failure, not just a reliability one.

United States

OSHA 29 CFR 1910.147

Federal workplace safety standard for control of hazardous energy

A tagged temporary repair sits close to lockout/tagout practice; an untagged or unmonitored stopgap on energised equipment is the kind of gap the standard is written to close.

How to complete it

How to complete a temporary repair record, step by step

Filling in every field is mechanical. The judgement calls below are what decide whether the record actually defends the decision to run the asset in a degraded state.

Whether the risk band reflects the worst lens, not the average one

Safety Risk, Food Safety Risk and Reliability Risk are scored separately for a reason. Averaging a low reliability score against a high food safety score to get a comfortable middle band defeats the point of scoring them apart.

Whether the expiry date is real or aspirational

An expiry date set from actual parts lead time or the next planned shutdown is a control. One set to 'a few months out' because that felt safe is just a number, and Days Until Expiry will not save it.

Whether the approver is independent of the person who made the call

Approval Level exists to put a Quality manager, Site manager or Group technical decision behind the risk, not to rubber-stamp what the technician already decided under time pressure.

Whether the tag and the monitoring match what the record claims

A record that scores well on paper but has no tag on the equipment and no increased monitoring applied is describing intent, not the asset's actual state.

What auditors find

Most common temporary repair record findings

These are the gaps that show up most often when a temporary repair record is checked against the asset it describes.

FindingClauseWhat fixes it
Expiry Date is set with no Follow Up Work Order ID linked to itISO 55001 cl.8.2Require a work order reference before the record can move past Planned, so the expiry has something concrete pushing toward it.
Repair Tagged On Equipment is recorded as No on a repair with a Medium or High risk bandISO 55001 cl.8.1Block closure of the risk section until the tag is confirmed in place, or require a documented reason it isn't needed.
Increased Monitoring Applied is No despite a Medium or High Reliability Risk scoreISO 55001 cl.9.1Make Monitoring Frequency mandatory whenever any of the three risk fields scores above Low, not just when monitoring was already chosen.
Approval Level is recorded by the same user named as Technician on the same recordISO 55001 cl.5.3Enforce that Approved By and Technician cannot be the same person for anything above the lowest risk band.
Completed On Or Before Expiry is Late with no Extended flag or updated Expiry Date behind itISO 55001 cl.10.1Require an Extended record with a new approval whenever the original expiry passes without the permanent fix.
Action Required is No on a record where Reliability Risk was scored HighISO 55001 cl.6.1Cross-check Action Required against the risk fields at closure, and flag the mismatch for supervisor review rather than letting it close silently.

Case in point

Case in point: the tag that fell off

A conveyor drive on a packing line was straightened rather than replaced after a jam, logged with a Medium reliability risk and a ninety-day expiry against a parts order. The tag went on, monitoring was set to quarterly, and the record closed as Planned.

The parts order slipped twice, the expiry date was never revisited, and the physical tag was removed during an unrelated clean-down. Eight months later the same drive failed properly, and the only trace of the earlier decision was a record with an expiry date that had passed unnoticed and no extension logged against it.

The template

The template, field by field

The form exactly as it installs. Every field, option, score and conditional rule is editable, and the links to other templates come with it.

46fields
5 sections
Reference
MNT-016
Archetype
Record
Record ID
TREP-2026-000
Scoring
Risk band
Direction
High is bad
Singleton
No
Basis
ISO 55001 cl.8.2
Links
Links Asset; feeds Work Order
Tags
Maintenance, Risk
Sections
5
Fields
46
Follow up fields
5
Repeating sections
0
Links out
4
Field typesOwn ID, generated on saveCase thread and parentPick list from a registryLinked to another templateFollow up, dashed outlineScored

Header

13 fields
Text

Repair ID*

Generated on save

Auto sequence. Format TREP-2026-000.

The record's own ID. Other templates point at this value.

Single Choice

Status*

Scored

Drives who this goes to next.

  • Planned2 pts
  • In progress2 pts
  • Complete3 pts
  • Deferred0 pts
  • Open0 pts
  • Closed3 pts
  • Overdue0 pts
Date & Time

Date and Time*

Users

Raised By*

Pick List

Site*

From FDN-001 Site NameFilter: Status is Active
Text

Site ID*

Linked

Format SITE-000.

Links to FDN-001 Site ID

Single Choice

Area

Optional

The area within the site.

Cutting roomBoning hallPackingChill storeFreezerPasteurisingFillingCulture roomDespatchYardWorkshopPlant roomOffices
Location

Exact Location

Optional

Drop a pin for anything hard to find.

Pick List

Asset*

From FDN-002 Asset NameFilter: Site matches, Status is Active
Text

Asset ID*

Linked

Format AST-0000.

Links to FDN-002 Asset ID

Info

Every Temporary Repair Has An Expiry

Temporary repairs that nobody tracks are how equipment quietly becomes unsafe. If it has no expiry date and no permanent fix planned, it is not temporary.

Text

Work Order ID

OptionalLinked

Links to MNT-002 Work Order ID

Text

Case ID

OptionalThread key

Thread key

The temporary repair

5 fields
Text

What Was Done*

Single Choice

Why Temporary*

Scored

Part unavailable, no access window, awaiting engineering decision or awaiting budget.

  • Part unavailable1 pt
  • No access window1 pt
  • Awaiting engineering decision1 pt
  • Awaiting budget0 pts
Single Choice

Repair Method*

Scored
  • Component replacement4 pts
  • Manufacturer approved repair3 pts
  • Straightening or welding0 pts
File Upload

Photograph*

Single Choice

Repair Tagged On Equipment*

Scored

So the next technician does not assume it is a permanent installation.

  • Yes3 pts
  • No0 pts

Risk while in place

8 fields
Single Choice

Safety Risk*

Scored
  • None4 pts
  • Low3 pts
  • Medium1 pt
  • High0 pts
Single Choice

Food Safety Risk*

Scored
  • None4 pts
  • Low3 pts
  • Medium1 pt
  • High0 pts
Single Choice

Reliability Risk*

Scored
  • Low3 pts
  • Medium1 pt
  • High0 pts
Text

Additional Controls Applied

Optional
Single Choice

Increased Monitoring Applied*

Scored
  • Yes3 pts
  • No0 pts
Single Choice

Monitoring Frequency

OptionalShows if Increased Monitoring Applied equals Yes
Quarterly or betterAnnuallyEvery 2 to 3 yearsNone
Single Choice

Operating Restrictions Applied*

Scored
  • Yes3 pts
  • Not needed3 pts
  • No0 pts
Text

Restriction Detail

OptionalShows if Operating Restrictions Applied equals Yes

Permanent fix

8 fields
Single Choice

Permanent Fix Defined*

Scored
  • Yes, scheduled3 pts
  • Yes, not scheduled1 pt
  • No0 pts
Text

Permanent Fix Detail

Optional
Single Choice

Parts On Order

Optional
YesNoIn stock
Date & Time

Expiry Date*

The date by which the permanent fix must be done.

Text

Follow Up Work Order ID

OptionalLinked

Links to MNT-002 Work Order ID

Numeric Answer

Days Until Expiry

OptionalScored
Users

Approved By*

Single Choice

Approval Level*

Scored
  • Quality manager2 pts
  • Site manager1 pt
  • Group technical0 pts

Closure

12 fields
Single Choice

Permanent Fix Completed

OptionalScored
  • Yes3 pts
  • No0 pts
Single Choice

Completed On Or Before Expiry

OptionalScored
  • Yes3 pts
  • Late0 pts
Single Choice

Extended

Optional
NoYes
Single Choice

Tag Removed

OptionalScored
  • Yes3 pts
  • No0 pts
Single Choice

Action Required*

Scored

Raise the action record, then enter its reference here.

  • No2 pts
  • Yes0 pts
Single Choice

Priority

OptionalScoredShows if Action Required equals Yes
  • High0 pts
  • Medium1 pt
  • Low3 pts
Text

CAPA ID

OptionalLinkedShows if Action Required equals Yes

Format CAPA-2026-00000.

Links to FDN-014 CAPA ID

Users

Action Owner

OptionalShows if Action Required equals Yes
Users

Technician*

Signature

Signature*

Users

Maintenance Manager*

Signature

Second Signature*

MNT-016 · record IDs look like TREP-2026-000 · Links Asset; feeds Work Order

Open in Knowella

Run it with agents

From a document you fill in to a programme that runs itself

The form captures the decision. Keeping the expiry date live, chasing the permanent fix, and holding the risk controls together while the stopgap is in place is where it actually gets lost.

KnowMaintain

Tracks every open temporary repair against its expiry date, flags a missed date as a nonconformity, and keeps the link to the permanent-fix work order visible until it closes.

KnowSafe

Watches the safety risk score and the tag status together, so an untagged high-risk stopgap surfaces before someone works on the asset assuming it's fully repaired.

KnowQuality

Follows the food safety risk score on any temporary repair touching product-contact equipment, and holds the evidence for the next audit.

Ella
Ella

Chases the permanent fix, rolls open temporary repairs and their approaching expiries into one view, and holds every write for your approval before it touches a record.

This template lives in KnowMaintain — asset maintenance. Work orders, planned maintenance, calibration, reliability and shutdowns.

Meet KnowMaintain→

Glossary

Temporary Repair Record definitions and key terms

Temporary repair
A fix that restores an asset's function without restoring its designed condition, made with a known, stated reason and a plan for the permanent fix.
Risk band
A scored classification of how much risk a condition carries while it remains unresolved, here run across safety, food safety and reliability separately, where high is bad.
Management of change
The ISO 55001 cl.8.2 requirement that any deviation from an asset's normal, designed condition be assessed and controlled rather than left informal.
Expiry date
The date by which a temporary repair's permanent fix must be completed; the forcing mechanism that stops a stopgap becoming the new normal.
Corrective action
The ISO 55001 cl.10.1 response to a nonconformity, such as a temporary repair that runs past its expiry without an approved extension.

FAQ

Frequently asked questions about temporary repair record

What is the temporary repair record template based on?+

It is built against ISO 55001 cl.8.2, management of change, which treats a departure from an asset's designed condition as something to be assessed and controlled rather than left informal.

What sections does the temporary repair record contain?+

There are 5 sections: header, the temporary repair, risk while in place, permanent fix, and closure. Together they hold 46 fields, 27 of which are required.

How often is a temporary repair record raised?+

A new record is raised whenever a temporary fix is made, at the moment it happens rather than reconstructed afterwards. Each one gets an ID in the form TREP-2026-000 so it can be traced from other records.

Who approves a temporary repair record?+

The maintenance manager approves it, but the approval level scales with risk: Quality manager, Site manager or Group technical, chosen against how severe the safety, food safety and reliability scores turn out to be.

How is a temporary repair record scored?+

It scores as a risk band, where high is bad, built from separate Safety Risk, Food Safety Risk and Reliability Risk fields rather than one combined number.

Can the temporary repair record template be changed?+

Yes. Every field, option, score and conditional rule is editable, and the links to the asset and work order come with it. Most teams install it as it is, run it for a cycle, then adjust.

Keep going

Related templates and programmes

Siddarth Singh

Written and reviewed by

Siddarth Singh

Founder & Chief Executive Officer, Knowella

Certified Safety Professional and industrial and systems engineer with more than a decade inside food supply chain, freight and manufacturing operations. This page was written against the current text of the standards it cites, not against secondary summaries of them.

  • Certified Safety Professional (CSP), Board of Certified Safety Professionals
  • MBA, University of Chicago Booth School of Business
  • MS and BS, The Ohio State University, Industrial and Systems Engineering
  • Six Sigma Black Belt
Verify with BCSP →

Sources and last review. Reviewed 16 August 2026 against:

  • ISO 55001 cl.8.2 — Management of change
  • ISO 55001 cl.6.1 — Actions to address risks and opportunities
  • Regulation (EC) 852/2004 — Hygiene of foodstuffs
  • OSHA 29 CFR 1910.147 — Control of hazardous energy

This page is general guidance, not legal advice. Confirm requirements with your jurisdiction’s regulator.