Knowella

Safety Program Review

The most common failure isn't a missed review — it's one that only checks whether the programme ran. Completion percent reads 100%, the schedule is intact, and the write-up stops there, because nobody asked whether behaviour on the floor actually changed. A programme can execute every activity on time and still be doing nothing, and this review is the one document built to catch that gap before it becomes a repeat incident.

KnowSafeReviewSAF-12340 fields across 5 sectionsFull researchSee the form

Reviewed by Siddarth SinghCSPLast reviewed 16 August 2026

Basis
ISO 45001 cl.9.1
Workspace
KnowSafe
Form type
Review
Review trigger
Yearly per programme, plus any trigger event
Completed by
The programme owner

The short version

  • A programme can run on schedule and still fail — this review exists to separate 'the activities happened' from 'the programme worked', and treats the second as the real test.
  • Programme health is a composite verdict: activity completion, finding closure, incident trend and observed behaviour change all feed into it, and none of them alone should carry a Strong or Adequate rating.
  • The review is run per programme, per year, by the programme owner named in that programme's plan — not by a central EHS function reviewing everything at once.
  • A Continue As Is decision made against a Weak or Failing health score is the single most common way this template gets used to rubber-stamp a programme that needs to change.

What this is

What is a safety program review?

What is a safety program review?

It is a yearly, per-programme check on whether a named safety programme — PPE, working at height, energy isolation, and so on — is actually doing what it was set up to do. It sits under ISO 45001 cl.9.1 monitoring and measurement, and it is deliberately narrower than a full management review: one programme, one owner, one verdict.

What does 'programme health' mean here?

Programme health is the review's overall verdict, scored Strong, Adequate, Weak or Failing. It is meant to combine whether the programme ran (activity completion), whether findings closed, and whether behaviour or incident trends actually moved — not any single one of those on its own.

How is this different from a management review record?

A management review record (CMP-014) looks across the whole safety management system at a fixed interval. A safety program review looks at one programme at a time, run by the person who owns it, and asks a narrower and more concrete question: did this specific programme change anything?

Scope

When is a safety program review required?

This review is one step in a larger programme. Using it for work that belongs to a neighbouring template produces records that are hard to report on later.

Use this template when

  • A named programme (PPE, working at height, energy isolation, and so on) is due its yearly check, or a trigger event has brought the review forward
  • You need a dated verdict on one specific programme, not the whole safety management system
  • A new record is needed; each one gets its own ID in the form SPR-2026-000
  • You are running the Safety Programme Management programme and this is one of its steps
  • A linked record needs this one to exist: it feeds CAPA

Do not use it for

  • Safety Management Plan, which sets out how safety is managed across the whole site, covering roles, processes, resources and how performance is measured.
  • Annual Safety Objectives, which sets the safety goals for the year with measures, owners and target dates — the target, not the check on whether a programme met it.
  • Site Safety Rules, which is the short list of rules everyone on site must follow, not a review of how a programme is performing.
  • Management Review Record, which looks across the whole management system at a fixed interval rather than one named programme.
  • Anything outside KnowSafe, which belongs in the workspace that owns that process

Compliance mapping

Which ISO 45001 cl.9.1 requirements does this satisfy?

ISO 45001 cl.9.1 asks organisations to monitor, measure, analyse and evaluate performance against planned criteria — this review is where that requirement gets applied to one programme at a time.

ClauseRequirementWhere it lands
ISO 45001 cl.9.1.1Determine what needs to be monitored and measured, and over what period, before evaluating performanceHeader
ISO 45001 cl.5.3Roles and responsibilities for programme ownership must be assigned and demonstrably active, not just named on paperIs it running
ISO 45001 cl.9.1.1Evaluate whether planned activities were carried out as scheduled, as a distinct step from evaluating whether they workedIs it running
ISO 45001 cl.9.1.1Analyse performance data, including incident trends, to judge effectiveness rather than mere activityIs it working
ISO 45001 cl.5.4Consultation and participation of workers extends to checking whether they understand the programmes meant to protect themIs it working
ISO 45001 cl.10.2Findings and nonconformities identified during monitoring must be tracked through to closureIs it working
ISO 45001 cl.10.3Continual improvement decisions — continue, modify or stop a programme — follow directly from the evaluation just completedResult
ISO 45001 cl.9.1.1Results of monitoring and measurement are retained as documented information and actioned where gaps are foundResult

What it does not cover

  • A programme review that reports only Completion Percent, which measures whether tasks ran, not whether the programme changed anything.
  • Observed Behaviour Changed marked 'Yes, clearly' with Evidence Of Change left blank, which leaves the highest behaviour score in the form resting on nothing a later reader can check.
  • Workers Can Explain The Programme scored from a Sample Size Asked of one or two people, which reports a workforce-wide claim off a conversation with almost nobody.
  • A Continue As Is decision recorded against a Trend Direction of Worsening, which contradicts the trend the same review just entered a field above.
  • Action Required set to No while an open CAPA ID from the prior review is still unresolved, which closes this review without checking whether last year's gap was ever fixed.

Global

Safety Program Review requirements by country

ISO 45001 is voluntary everywhere, but how much weight a completed programme review carries depends heavily on what else is riding on the certificate or the enforcement relationship in that jurisdiction.

United States

OSHA VPP / ANSI–ASSP Z10

OSHA doesn't require ISO 45001, but VPP renewal and Z10-aligned audits expect dated proof a named programme was checked against real outcomes, not just described in a policy binder.

A site without a completed review has nothing to show a VPP assessor when they ask whether the PPE or working-at-height programme was actually evaluated this year.

United Kingdom

HSE Plan-Do-Check-Act model (HSG65)

UK enforcement expects the 'Check' stage of HSG65 to be evidenced, and ISO 45001 cl.9.1 is the recognised route; insurers increasingly ask for the review record itself after a near-miss, not the programme it reviews.

A site producing only the programme document, with no dated review or owner's signature, is treated as stuck at 'Plan' regardless of how the programme reads on paper.

International / multi-site groups

ISO 45001 surveillance audit

Certification bodies sample programme reviews during surveillance visits and treat a missing or superficial one as a nonconformity against cl.9.1, independent of the programme's own quality.

Certification survives on the review trail as much as the programme — an auditor finding 100% completion but no Evidence Of Change entry will write it up as evaluation done in name only.

How to complete it

How to complete a safety program review, step by step

Filling in every field is the easy part. The judgement calls below are what decide whether the finished review would survive someone else reading it critically.

Deciding what counts as 'evidence of change'

Evidence Of Change is free text with no required format, so the reviewer sets the bar themselves. An anecdote and a genuine before/after observation get typed into the same box, and only judgement about what's defensible keeps the first kind out.

Weighing a clean Completion Percent against a stalled Closure Percent

A programme can hit 100% on Scheduled Activities Completed while Findings Closed sits far behind Findings Raised. How much that gap should drag down Programme Health, rather than being buried under a good activity number, is a call the form doesn't make for you.

Calling the incident trend when the sample is small

Related Incidents This Period versus Last Period is often a comparison of very small numbers, where 'Improving' or 'Worsening' can hinge on one event. The reviewer decides whether the sample actually supports a trend claim or whether 'Stable' is the honest answer.

Choosing Modify over Stop and rethink

The gap between 'Modify' and 'Stop and rethink' is a matter of degree the form doesn't define. That call rests on how much of the programme's underlying design, not just its execution, the findings actually implicate.

What auditors find

Most common safety program review findings

These are the specific ways a completed review passes its own checklist while still failing to do the job the review exists for.

FindingClauseWhat fixes it
Completion Percent recorded at 100% while Findings Closed lags far behind Findings RaisedISO 45001 cl.10.2Treat activity completion and finding closure as two separate health signals in the write-up; don't let a strong one mask a weak one.
Observed Behaviour Changed marked 'Yes, clearly' with Evidence Of Change left blankISO 45001 cl.9.1.1Require a one-line evidence entry before the behaviour-change score can be set above 'No evidence'.
Trend Direction marked Improving while Related Incidents This Period is higher than Last PeriodISO 45001 cl.9.1.1Cross-check the two incident fields before accepting the trend score; if they disagree, the review isn't ready to close.
Workers Can Explain The Programme scored from a Sample Size Asked of one or two peopleISO 45001 cl.5.4Set a minimum sample size before this score counts, and log the number so a later audit can judge how representative it was.
Continue As Is selected while Programme Health is recorded as Weak or FailingISO 45001 cl.10.3Block 'Continue As Is' whenever health is below Adequate; force a Modify or Stop and rethink decision instead.
Action Required set to No while an open CAPA ID from a prior review is still unresolvedISO 45001 cl.10.2Pull the previous review's CAPA reference automatically and require it be marked closed before this one can record no action.

Case in point

Case in point: a working-at-height programme that passed every audit and still put someone in hospital

A working-at-height programme ran its full schedule of inspections and toolbox talks for three straight years, and every prior review recorded Completion Percent near 100% with Programme Health rated Strong. The reviews were accurate on the one thing they measured — the activities happened — and silent on the one thing that mattered, because Observed Behaviour Changed had been marked 'Some evidence' every year without a single entry in Evidence Of Change.

A worker fell from a mobile platform after unclipping early to reach a tool, a habit supervisors later admitted they'd seen before. The investigation found what the reviews never asked: nobody had checked whether workers could explain why the rule existed, only whether inspections had been logged. The programme was rebuilt around a genuine worker sample and a hard requirement that Evidence Of Change carry a real observation — and the first honest review came back Weak, which is what should have happened three years earlier.

The template

The template, field by field

The form exactly as it installs. Every field, option, score and conditional rule is editable, and the links to other templates come with it.

40fields
5 sections
Reference
SAF-123
Archetype
Review
Record ID
SPR-2026-000
Scoring
Programme health percent
Direction
High is good
Singleton
No
Basis
ISO 45001 cl.9.1
Links
Feeds CAPA
Tags
Programme, Governance
Sections
5
Fields
40
Follow up fields
3
Repeating sections
0
Links out
3
Field typesOwn ID, generated on saveCase thread and parentPick list from a registryLinked to another templateFollow up, dashed outlineScored

Header

11 fields
Text

Review ID*

Generated on save

Auto sequence. Format SPR-2026-0000.

The record's own ID. Other templates point at this value.

Single Choice

Status*

Scored

Drives who this goes to next.

  • Planned2 pts
  • In progress2 pts
  • Complete3 pts
  • Deferred0 pts
  • Open0 pts
  • Closed3 pts
  • Overdue0 pts
Pick List

Site*

From FDN-001 Site NameFilter: Status is Active
Text

Site ID*

Linked

Format SITE-000.

Links to FDN-001 Site ID

Single Choice

Programme Reviewed*

PPEWorking at heightEnergy isolationConfined spaceContractor managementObservation programmeHearing conservationMachine safety
Date & Time

Review Date*

Users

Reviewed By*

Pick List

Site 2*

From FDN-001 Site NameFilter: Status is Active
Text

Site ID 2*

Linked

Format SITE-000.

Links to FDN-001 Site ID

Date & Time

Period Covered From*

Date & Time

Period Covered To*

Is it running

6 fields
Single Choice

Documented Programme Exists*

Scored
  • Pass2 pts
  • Partial1 pt
  • Fail0 pts
  • N/Aexcluded from denominator
Single Choice

Owner Named And Active*

Scored
  • Pass2 pts
  • Partial1 pt
  • Fail0 pts
  • N/Aexcluded from denominator
Single Choice

Resourced Adequately*

Scored
  • Pass2 pts
  • Partial1 pt
  • Fail0 pts
  • N/Aexcluded from denominator
Numeric Answer

Scheduled Activities Completed*

Numeric Answer

Scheduled Activities Due*

Numeric Answer

Completion Percent*

Scored

Is it working

11 fields
Info

Activity Is Not Outcome

A programme can run every scheduled activity and change nothing. Look for evidence that behaviour or conditions are different.

Numeric Answer

Findings Raised*

Numeric Answer

Findings Closed*

Numeric Answer

Closure Percent*

Scored
Numeric Answer

Related Incidents This Period*

Scored
Numeric Answer

Related Incidents Last Period

Optional
Single Choice

Trend Direction*

Scored
  • Improving3 pts
  • Stable2 pts
  • Worsening0 pts
Single Choice

Observed Behaviour Changed*

Scored
  • Yes, clearly3 pts
  • Some evidence2 pts
  • No evidence0 pts
Text

Evidence Of Change

Optional
Single Choice

Workers Can Explain The Programme*

Scored
  • Most can3 pts
  • Some can1 pt
  • Few can0 pts
Numeric Answer

Sample Size Asked

Optional

Related records

1 field
Text

Climate Survey ID

OptionalLinked

Survey results used in this review.

Links to SAF-168 Survey ID

Result

11 fields
Single Choice

Programme Health*

Scored
  • Strong4 pts
  • Adequate3 pts
  • Weak1 pt
  • Failing0 pts
Single Choice

Continue As Is*

Scored
  • Yes3 pts
  • Modify2 pts
  • Stop and rethink0 pts
Single Choice

Action Required*

Scored

Raise the action record, then enter its reference here.

  • No2 pts
  • Yes0 pts
Single Choice

Priority

OptionalScoredShows if Action Required equals Yes
  • High0 pts
  • Medium1 pt
  • Low3 pts
Text

CAPA ID

OptionalLinkedShows if Action Required equals Yes

Format CAPA-2026-00000.

Links to FDN-014 CAPA ID

Users

Action Owner

OptionalShows if Action Required equals Yes
Date & Time

Next Review Due*

Users

Reviewed By*

Signature

Signature*

Users

Site Manager*

Signature

Second Signature*

SAF-123 · record IDs look like SPR-2026-000 · Feeds CAPA

Open in Knowella

Run it with agents

From a document you fill in to a programme that runs itself

The form is the easy part. Keeping it current, routing it to the right owner and holding the evidence together is the work that actually slips.

KnowSafe

Holds the Safety Program Review library against your registers, routes each record to its programme owner, and flags when Programme Health drops without a matching CAPA.

KnowTrain

Feeds the induction and toolbox-talk history that a reviewer needs to honestly answer Workers Can Explain The Programme, instead of guessing from a hallway conversation.

KnowComply

Tracks the certification and audit calendar around ISO 45001, so a Programme Health score of Weak or Failing surfaces before the next surveillance visit finds it first.

Ella
Ella

Coordinates the crew, rolls completion and exceptions into one view, and holds every write for your approval before it touches a record.

This template lives in KnowSafe — safety and compliance. Incidents, hazards, permits, inspections and the critical controls behind them.

Meet KnowSafe→

Glossary

Safety Program Review definitions and key terms

Programme health
The review's overall verdict on a named safety programme — Strong, Adequate, Weak or Failing — meant to weigh activity completion, finding closure and behaviour change together rather than any one of them alone.
Trigger event
An incident, near-miss, audit finding or regulatory change that brings a programme review forward from its normal yearly slot.
CAPA
Corrective and preventive action — the tracked record raised when a review finds something that needs fixing, referenced back into this form by its own ID.
Behaviour change evidence
A concrete, checkable observation — not an impression — that shows a programme has altered how people actually work, as distinct from proof that its scheduled activities took place.
Programme owner
The named individual accountable for a specific safety programme's performance, who carries out its yearly review under this template.

FAQ

Frequently asked questions about safety program review

What is the Safety Program Review template based on?+

It is built against ISO 45001 cl.9.1, monitoring, measurement, analysis and performance evaluation. ISO 45001 is the international standard for occupational health and safety management systems, certifiable and the backbone of most of this library.

What sections does the template contain?+

Five sections: Header, Is it running, Is it working, Related records and Result. Together they hold 40 fields, 32 of which are required, moving from whether the programme executed through to whether it actually changed anything.

How often is a review raised, and how is it scored?+

A new record is raised at the yearly review interval, or after any trigger event, and given an ID in the form SPR-2026-000. Scoring rolls up to Programme Health as a percentage, where high is good — but the score only means something if the underlying behaviour and incident fields were answered honestly.

Which programme does this template belong to, and what does it feed?+

It sits inside Safety Programme Management, and its output feeds CAPA — any Action Required marked Yes should produce a corrective action record referenced back into this form.

Why does the form separate 'is it running' from 'is it working'?+

Because a programme can run every scheduled activity and still change nothing. The 'Is it running' section checks execution; 'Is it working' checks outcome — incident trend, behaviour change and whether workers can explain the programme in their own words.

Can the template be changed?+

Yes. Every field, option, score and conditional rule is editable, and the links to other templates come with it. Most teams install it as it is, run it for a full cycle, then adjust the questions once they've seen how a real review plays out.

Keep going

Related templates and programmes

Siddarth Singh

Written and reviewed by

Siddarth Singh

Founder & Chief Executive Officer, Knowella

Certified Safety Professional and industrial and systems engineer with more than a decade inside food supply chain, freight and manufacturing operations. This page was written against the current text of the standards it cites, not against secondary summaries of them.

  • Certified Safety Professional (CSP), Board of Certified Safety Professionals
  • MBA, University of Chicago Booth School of Business
  • MS and BS, The Ohio State University, Industrial and Systems Engineering
  • Six Sigma Black Belt
Verify with BCSP →

Sources and last review. Reviewed 16 August 2026 against:

  • ISO 45001:2018 cl.9.1 — Monitoring, measurement, analysis and performance evaluation
  • ISO 45001:2018 cl.9.1.1 — General
  • ISO 45001:2018 cl.10.2 — Incident, nonconformity and corrective action
  • ISO 45001:2018 cl.10.3 — Continual improvement
  • ISO 45001:2018 cl.5.4 — Consultation and participation of workers

This page is general guidance, not legal advice. Confirm requirements with your jurisdiction’s regulator.