The recurring failure in improvement projects isn't a bad idea or a bad fix — it's a result nobody measured against a baseline, so six months later there is a strong feeling things improved and nothing to show a certification auditor or a sceptical manager. This record exists to force a baseline before the work starts and a check at six months, so the claim of improvement survives being questioned.

KnowComplyRecordCMP-05148 fields across 5 sectionsFull researchSee the form

Reviewed by Siddarth SinghCSPLast reviewed 16 August 2026

Basis
ISO 45001 cl.10.3
Workspace
KnowComply
Form type
Record
Completed by
Owned by the project lead
Raised
For anything needing more than a corrective action

The short version

  • A project record with no Baseline Value is not measuring improvement, it is describing a change and hoping it helped — the record structurally prevents that by requiring both a baseline and a result.
  • As a singleton per workspace, this is the standing method record for structured improvement work, not a one-off form raised per event; other templates, including suggestions and lessons learned, refer back to it.
  • The Sustaining section is scored separately from the Method section on purpose: a well-executed fix that isn't checked at six months and documented is treated as unfinished, not successful.
  • Scoring is benefits sustained, which means a project that hits its target immediately after go-live but drifts back by the six-month check scores worse than one that starts modestly and holds.

What this is

What is a continual improvement project record?

What is a continual improvement project record?

It is a structured record, built against ISO 45001 cl.10.3, that carries an improvement project from a written problem statement through a defined method to a measured, sustained result. It is a singleton per workspace — set up and maintained as the standing record of that programme, rather than raised once per event.

How is this different from a corrective action?

A corrective action responds to a specific nonconformance and closes when the root cause is fixed. This record is proactive and typically broader in scope — a process, a repeated near-miss pattern, or a cost driver — and it does not close on the fix; it closes on the fix being sustained and measured months later.

Why does the record require a baseline before any work starts?

Because 'improvement' is a comparison, not a description. Without a Baseline Value captured before the change, the Result Value and Improvement Percent fields have nothing credible to compare against, and the project's benefit becomes a claim rather than a number.

Scope

When is a continual improvement project record required?

This record is one step in a larger programme. Using it for work that belongs to a neighbouring template produces records that are hard to report on later, and running a full project structure around something that was really a quick fix wastes the project lead's time.

Use this template when

  • The improvement needs more structure than a corrective action — a defined problem statement, a baseline, a piloted solution
  • The workspace is being set up, or the register needs the existing project entry updated
  • You are running the Management System Governance programme and this is one of its steps
  • A suggestion or audit finding has outgrown the record that raised it and needs a project lead and a baseline
  • A linked record needs this one to exist: links Lessons Learned, Objectives

Do not use it for

  • Improvement Suggestion Record, which captures an improvement idea from anybody, with what it would change and who could own it — use that first, and only promote to this record once the idea needs a measured baseline.
  • Corrective Action Effectiveness Trend, which reviews whether corrective actions across the site actually prevent recurrence by tracking repeat events, not for planned improvement work with no prior nonconformance.
  • Kaizen Event Record, which is built for a short, time-boxed workshop-style improvement event rather than a project running over weeks or months with a formal sponsor.
  • Benchmarking Record, which compares performance against another site or an industry figure — a useful input to a problem statement here, but not a substitute for this record.
  • Anything outside KnowComply, which belongs in the workspace that owns that process.

Compliance mapping

Which ISO 45001 cl.10.3 requirements does this satisfy?

ISO 45001 cl.10.3 requires organisations to determine and implement opportunities for improvement as part of continual improvement — this record is the structured, sustained-result path through that requirement, as distinct from the lighter-weight suggestion intake.

ClauseRequirementWhere it lands
cl.10.3Define the problem and set a sponsor and a target completion date before work beginsHeader
cl.10.3Write a problem statement, measure a baseline, quantify a target, and bound the scopeDefinition
cl.10.3Include front-line workers in the project team, consistent with the requirement for worker participationDefinition
cl.10.3Carry out root-cause analysis, generate solutions with the team, and pilot before full rolloutMethod
cl.10.3Assess the risk of the proposed change and apply change management before implementingMethod
cl.10.3Document the new method, deliver training, and assign a long-term ownerSustaining
cl.10.3Check the result at six months and confirm the benefit is still present, not just achieved at go-liveSustaining
cl.10.3Record the baseline and result values, calculate improvement, and link to lessons learned and objectivesOutcome

What it does not cover

  • Baseline Measured marked No but a Baseline Value is entered anyway, which means the number exists without the discipline behind it and cannot be trusted as a true starting point.
  • Target Achieved marked Yes with no Result Value entered, which leaves the claim of achievement with nothing to check it against.
  • Checked At Six Months left blank on a project marked Complete, which means the record is claiming a sustained benefit it has not actually verified.
  • New Method Documented marked No on a project moving to Sustaining, which means the improvement depends on people remembering rather than a controlled procedure.
  • Feeds Objectives marked Yes with no corresponding entry on the objectives register, which breaks the link this record is supposed to establish.

Global

Continual Improvement Project Record requirements by country

ISO 45001 sets the same clause everywhere it is adopted, but what a certification body, a regulator or a customer audit actually expects to see behind a claimed improvement varies by jurisdiction and by who is relying on the record.

International

ISO 45001:2018 cl.10.3 and ISO 19011 audit guidance

Auditors sampling continual improvement records specifically look for a measured baseline and a follow-up check, because a project record with only a start and an end date is treated as anecdotal, not evidenced.

A site with several projects marked Complete but no Baseline Value or six-month check risks a minor nonconformance against cl.10.3 even where the underlying work was genuinely good.

United Kingdom

Health and Safety at Work etc. Act 1974, s.2(1) general duty and HSE guidance on management systems

HSE inspectors reviewing a site's management system treat a documented, measured improvement record as stronger evidence of a functioning system than a policy statement alone.

In an enforcement context following an incident, a live continual improvement programme with real baselines can support an argument of reasonably practicable control; a paper-only programme carries far less weight.

United States

OSHA Recommended Practices for Safety and Health Programs and voluntary VPP criteria

US regulation does not mandate a formal improvement project record, but VPP and similar recognition programmes specifically ask for evidence of measured, sustained improvement rather than one-off fixes.

A site pursuing or maintaining VPP status will be asked to produce exactly this kind of baseline-to-sustained-result record as part of the site evaluation.

How to complete it

How to complete a continual improvement project record, step by step

Filling in each field is straightforward. The judgement calls are what determine whether the finished record would survive a sceptical read months after the project closed.

What counts as a defensible baseline

A baseline taken after the team already knew a change was coming is contaminated — people adjust behaviour under observation. The defensible baseline is measured before the project is announced, or as close to it as practically possible.

How much scope-bounding is enough

Scope Bounded = Yes should mean the team could describe, in a sentence, what is explicitly out of scope, not just what is in. A project that keeps absorbing adjacent problems as it runs is the main reason target dates slip.

When Sponsor Committed Resources is genuinely Yes

A sponsor's name on the record is not the same as committed resources. This should only score Yes where time, budget or people have actually been allocated — a verbal endorsement with no allocation is Partly, not Yes.

Whether a benefit that faded by six months should still be marked Complete

If Checked At Six Months shows the benefit did not hold, the honest record is Benefit Sustained = No, with the project either reopened or explicitly closed as a lesson learned — not quietly left at Complete because the paperwork was already filed.

What auditors find

Most common continual improvement project record findings

Most audit findings against structured improvement projects trace back to one of six gaps between what the project actually did and what the record claims it did.

FindingClauseWhat fixes it
Projects marked Complete with no Baseline Value recordedcl.10.3Require Baseline Value before Status can move past Planned, not just before the project is marked Complete.
Target Achieved and Improvement Percent are filled in inconsistently with the Baseline and Result valuescl.10.3Cross-check the calculated improvement against the stated percentage during review, rather than accepting free-text entry at face value.
Six Month Check Due passes with no Checked At Six Months entrycl.10.3Report on Six Month Check Due as an overdue item, the same way an action or a CAPA due date would be tracked.
New Method Documented and Training Delivered are marked Yes with no reference to the documentation or training recordcl.10.3Require a document or training reference alongside those fields rather than accepting a bare Yes.
Transferable Elsewhere is marked Yes but the improvement is never actually shared to other sites or areascl.10.3Route Transferable Elsewhere = Yes into the management review agenda so a genuinely transferable result gets acted on, not just flagged.
Lessons Learned ID is left blank on projects that did not achieve their targetcl.10.3Make the Lessons Learned ID field required whenever Target Achieved is No or Partly, so an unsuccessful project still produces something usable.

Case in point

Case in point: the target that was hit and then quietly lost

A packing line ran a project to cut product giveaway, with a clear baseline, a piloted change to portioning, and a Result Value that beat the target within a month. The project was marked Complete, the sponsor signed off, and the record looked like a success story — right up until nobody filled in the six-month check.

A customer audit later asked to see sustained improvement evidence, and this project was held up as the example — the six-month field was still blank, eight months after go-live. A check found the giveaway figure had drifted back near the original baseline once the pilot operator moved shift. The fix hadn't failed; it had never been checked, and the record couldn't tell sustained from forgotten.

The template

The template, field by field

The form exactly as it installs. Every field, option, score and conditional rule is editable, and the links to other templates come with it.

48fields
5 sections
Reference
CMP-051
Archetype
Record
Record ID
CIP-2026-000
Scoring
Benefits sustained
Direction
High is good
Singleton
Yes
Basis
ISO 45001 cl.10.3
Links
Links Lessons learned, Objectives
Tags
Improvement, Project
Sections
5
Fields
48
Follow up fields
3
Repeating sections
0
Links out
3
Field typesOwn ID, generated on saveCase thread and parentPick list from a registryLinked to another templateFollow up, dashed outlineScored

Header

13 fields
Text

Project ID*

Generated on save

Auto sequence. Format CIP-2026-000.

The record's own ID. Other templates point at this value.

Single Choice

Status*

Scored

Drives who this goes to next.

  • Planned2 pts
  • In progress2 pts
  • Complete3 pts
  • Deferred0 pts
  • Open0 pts
  • Closed3 pts
  • Overdue0 pts
Date & Time

Date and Time*

Users

Completed By*

Pick List

Site*

From FDN-001 Site NameFilter: Status is Active
Text

Site ID*

Linked

Format SITE-000.

Links to FDN-001 Site ID

Text

Project Title*

Single Choice

Domain*

SafetyFood safetyQualityEnvironmentalOccupational healthEngineeringWarehouseTransport
Users

Project Lead*

Date & Time

Start Date*

Date & Time

Target Completion*

Single Choice

Sponsor Assigned*

Scored
  • Yes3 pts
  • No0 pts
Info

Improvements Nobody Measured Are Opinions

Without a baseline and a measure afterwards, an improvement project produces a feeling that things are better and no way to defend it.

Definition

6 fields
Single Choice

Problem Statement Written*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Baseline Measured*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Target Set And Quantified*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Scope Bounded*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Team Includes Front Line Workers*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Sponsor Committed Resources*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts

Method

6 fields
Single Choice

Root Cause Analysis Carried Out*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Solutions Generated With The Team*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Solution Piloted Before Rollout*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Control Level Assessed*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Risks Of The Change Assessed*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Change Management Applied*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts

Sustaining

6 fields
Single Choice

New Method Documented*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Training Delivered*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Measure Continued After Closure*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Owner Assigned For The Long Term*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Checked At Six Months*

Scored
  • Yes2 pts
  • No0 pts
  • N/Aexcluded from denominator
Single Choice

Benefit Sustained*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts

Outcome

17 fields
Numeric Answer

Baseline Value*

Scored
Numeric Answer

Result Value*

Scored
Numeric Answer

Improvement Percent*

Scored
Single Choice

Target Achieved*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Benefit Sustained*

Scored
  • Yes3 pts
  • Partly1 pt
  • No0 pts
Single Choice

Transferable Elsewhere*

Scored
  • Yes3 pts
  • No1 pt
Text

Lessons Learned ID

OptionalLinked

Links to FDN-031 Record ID

Single Choice

Feeds Objectives*

YesNo
Date & Time

Six Month Check Due

Optional
Single Choice

Action Required*

Scored

Raise the action record, then enter its reference here.

  • No2 pts
  • Yes0 pts
Single Choice

Priority

OptionalScoredShows if Action Required equals Yes
  • High0 pts
  • Medium1 pt
  • Low3 pts
Text

CAPA ID

OptionalLinkedShows if Action Required equals Yes

Format CAPA-2026-00000.

Links to FDN-014 CAPA ID

Users

Action Owner

OptionalShows if Action Required equals Yes
Users

Project Lead*

Signature

Signature*

Users

Sponsor*

Signature

Second Signature*

CMP-051 · record IDs look like CIP-2026-000 · Links Lessons learned, Objectives

Open in Knowella

Run it with agents

From a document you fill in to a programme that runs itself

The record captures the discipline. What actually protects a project from quietly losing its result is someone chasing the six-month check months after everyone has moved on to the next priority.

KnowQuality

Watches projects scoped as Quality or Food safety through to their six-month check, and flags where a result reported at go-live has drifted by the time it's actually verified.

KnowOps

Tracks project status against target completion dates across the register, and surfaces projects stalled at Planned or In progress well before the sponsor is asked for an update.

KnowSafe

Picks up projects in the Safety or Occupational health domain and checks whether risk assessment of the change itself was actually completed before rollout, not just the underlying problem.

Ella
Ella

Rolls overdue six-month checks, missing baselines and unresolved action links into one view across every project, and holds any write it proposes for your approval before it touches a record.

This template lives in KnowComply — audit and governance. Audit programmes, legal register, management review, risk and certification.

Meet KnowComply→

Glossary

Continual Improvement Project Record definitions and key terms

Baseline
The measured state of the problem before any change is made, captured specifically so a later result can be compared against something real rather than a recollection.
Root cause analysis
A structured method for identifying the underlying driver of a problem, rather than the symptom closest to the surface, used here before solutions are generated.
Change management
The discipline of assessing and controlling the risk introduced by a change itself, separate from the risk the change is meant to reduce.
Sustained benefit
An improvement that is still present at a defined check point after go-live — typically six months — as distinct from an improvement only observed immediately after the change.
Singleton record
A record type set up once per workspace and maintained over time, rather than raised repeatedly per event — used here because the improvement methodology itself doesn't change project to project.

FAQ

Frequently asked questions about continual improvement project record

Why is this a singleton when Improvement Suggestion Record is not?+

The suggestion record is raised per idea, one entry per suggestion. This record captures the structured methodology and standing governance around improvement projects at the workspace level, which is set up once and referred back to, even though individual projects still have their own project IDs within it.

What happens if the six-month check shows the improvement didn't hold?+

Benefit Sustained is marked No or Partly, and the honest path is either to reopen the project with a revised method or to close it with a Lessons Learned entry explaining what didn't stick. Leaving it marked Complete with a failed six-month check is the exact gap auditors look for.

Does every field need a baseline number, even a qualitative improvement?+

Baseline Value and Result Value are numeric, which forces even a qualitative-feeling improvement to be expressed as something measurable — a count, a rate, a score. Where a project genuinely resists quantification, that is itself a sign it may not be scoped tightly enough for this record.

How does this connect to Lessons Learned and Objectives?+

Lessons Learned ID captures what should be retained regardless of outcome, and Feeds Objectives flags whether the result should influence the next objective-setting cycle — both are meant to stop a completed project's insight from disappearing once the record is closed.

How is this scored, and why does it favour sustained results over quick wins?+

Scoring is benefits sustained, high is good. A project that hits its target at go-live but isn't checked or drifts back scores lower than one with a modest but confirmed six-month result, because the record is designed to reward durability, not a good number on the day it launched.

Can a project raised here later need a CAPA?+

Yes — the Action Required field exists for that, with a CAPA ID entered once the action is raised. Projects commonly surface a specific nonconformance partway through that needs formal corrective action alongside the broader work.

Keep going

Related templates and programmes

Siddarth Singh

Written and reviewed by

Siddarth Singh

Founder & Chief Executive Officer, Knowella

Certified Safety Professional and industrial and systems engineer with more than a decade inside food supply chain, freight and manufacturing operations. This page was written against the current text of the standards it cites, not against secondary summaries of them.

  • Certified Safety Professional (CSP), Board of Certified Safety Professionals
  • MBA, University of Chicago Booth School of Business
  • MS and BS, The Ohio State University, Industrial and Systems Engineering
  • Six Sigma Black Belt
Verify with BCSP →

Sources and last review. Reviewed 16 August 2026 against:

  • ISO 45001:2018 — cl.10.3 Continual improvement
  • Health and Safety at Work etc. Act 1974 — s.2(1)
  • ISO 19011:2018 — Guidelines for auditing management systems
  • OSHA Recommended Practices for Safety and Health Programs

This page is general guidance, not legal advice. Confirm requirements with your jurisdiction’s regulator.

Start in Minutes, Not Weeks

Launch a Ready-Made Template and Customize It Your Way

Every template is fully editable. Adjust fields, workflows, and branding to match your processes, then deploy to your team instantly.